| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 04/20/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | SEDIMENT CONTROLS NEED TO BE RE-ESTABLISHED OR SITE NEEDS TO BE STABILIZED. | |
| 04/10/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | SITE IS NOT BEING WORKED HOWEVER THE LOT HAS BEEN DISTURBED. THERE IS CURBING IN PLACE AND SOME STORM WATER CONTROLS HAVE BEEN INSTALLED. SITE HASA SWPPP AND SHOULD CALL FOR A PRECON MEETING WHEBN CONSTRUCTION BEGINS |
|
| 02/27/2007 | ENGINEERING PRE-CONSTRUCTION | Correction Required | NO CONSTRUCTION ACTIVITY ON SITE, HOWEVER SOME STOCK PILING OF MATERIAL HAS OCCURED ON SITE AND SOME SEDIMENT CONTROLS HAVE BEEN INSTALLED. | |
| 11/29/2006 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | CONSTRUCTION PROJECT HAS NOT BEGUN, HOWEVER THE BLDG PAD IS BEING USED TO STOCKPILE DIRT AND MATERIAL FOR USE ON SITE. SEDIMENT CONTROLS ARE REQUIRED. 1) WADDLE HAS BEEN PLACED AROUND THE PERIMETER OF THE SITE. 2) ENSURE CONTROLS ARE MAITAINED ON A ROUTINE BASIS. 3) SWEEP UP TRACKED MATERIAL AND SOIL ACCUMULATION IN FRONT OF THE ADJACENT STORM WATER CATCH BASIN. 4) STORM WATER CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS STABILIZED. |
|
| 11/22/2006 | ENGINEERING PRE-CONSTRUCTION | Violation | STOP WORK ORDER ISSUED. CONSTRUCTION HAS STARTED WITH NO SEDIMENT CONTROLS INSTALLED. FAILURE TO IMPLEMENT APPROVED SWPPP. |
|
| 11/01/2006 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY |