Permit: T06BU01077
Permit Details
Status:
Final
Type:
COMMERCIAL OTHER
Address:
6984 E CENTURY PARK DR
Address NEW:
6984 E CENTURY PARK DR
Apply Date:
05/02/2006
Applicant:
ALAN L LEVIN
Description:
CUT 10,504CY FILL 42,265CY
Contractors:
- LEVIN AND SONS L L C
Permit Reviews
Permit Number - T06BU01077
Permit Status: Final
Permit Description: CUT 10,504CY FILL 42,265CY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/02/2006 | GRADING | 11/02/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06BU01077
Permit Status: Final
Permit Description: CUT 10,504CY FILL 42,265CY
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/02/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T06BU01077
Permit Description: CUT 10,504CY FILL 42,265CY
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2006 | STORMWATER FOLLOW-UP INSP | NKALAHAR | Approved | SAW ALAN ON SITE WILL CHECK AGAIN FOR CONCRETE WASHOUT SIGN |
| 06/06/2007 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 07/13/2007 | GRADING - FINAL | NKALAHAR | Approved | *RIP RAP OUTFALLS MISSING AT BASIN OUTLET AND AT END OF CONCRETE SWALE (NW CORNER) *MISSING CONCRETE SWALE FROM SE CORNER OF BUILDING TO EAST *NO CONCRETE SWALE THROUGH GRAVLE AREA ON EAST SIDE OF BUILDING *RIP RAP BANK STABILIZATION NOT INSTALLED NE SIDE OF SITE *TRASH ENCLOSURE AREA NOT BUILT *INLET SWALE NOT BUILT INTO BASIN FROM BUILDING CP-REMOVE ALL STORMWATER CONTROLS *SEE 7/9 ENTRY |
| 07/17/2007 | STORMWATER INSTALL OF CONTROLS | NKALAHAR | Approved | |
| 07/17/2007 | ENGINEERING PRE-CONSTRUCTION | NKALAHAR | Approved | |
| 07/17/2007 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
| 07/24/2007 | PERMIT FINALED | KMEDINA | Approved |