Permit: T06BU01077

Parcel: 14108002H

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
07/17/2007 STORMWATER FOLLOW-UP INSP Approved
03/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval STRUCTURE WORK CONTINUES
NO SUBSTANTIAL SITE WORK
10/05/2006 STORMWATER FOLLOW-UP INSP Partial Approval SAW ALAN ON SITE
WILL CHECK AGAIN FOR CONCRETE WASHOUT SIGN
09/20/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

-CONCRETE WASH OUT MUST BE ON SITE AND SIGNED
-CLEAN UP DIRT FROM DRIVEWAY ON WEST SIDE OF BUILDING
08/30/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS
-PORTA TOILET TIPPED OVER
-NO CONCRETE WASH OUT ON SITE-MUST BE PLACED AND SIGNED
08/10/2006 STORMWATER FOLLOW-UP INSP Correction Required MET WITH ALAN ON SITE
DRIVEWAY ON THE WEST SIDE OF PROJECT NEEDS TO BE SWEPT
STABILIZED CONSTRUCTION ENTRANCE TO BE PLACED AT SW SIDE OF BUILDING