Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | STRUCTURE WORK CONTINUES NO SUBSTANTIAL SITE WORK |
|
| 10/05/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SAW ALAN ON SITE WILL CHECK AGAIN FOR CONCRETE WASHOUT SIGN |
|
| 09/20/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 7 DAYS -CONCRETE WASH OUT MUST BE ON SITE AND SIGNED -CLEAN UP DIRT FROM DRIVEWAY ON WEST SIDE OF BUILDING |
|
| 08/30/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED 10 DAYS -PORTA TOILET TIPPED OVER -NO CONCRETE WASH OUT ON SITE-MUST BE PLACED AND SIGNED |
|
| 08/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | MET WITH ALAN ON SITE DRIVEWAY ON THE WEST SIDE OF PROJECT NEEDS TO BE SWEPT STABILIZED CONSTRUCTION ENTRANCE TO BE PLACED AT SW SIDE OF BUILDING |