Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/17/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 07/05/2006 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | SPOKE WITH MIKE ABOUT CONCRETE WASHOUT STANDARDS NEEDS FOLLOW UP INSP 7/11 |
|
| 07/03/2006 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | WENT TO SITE WITH ALAN DISCUSSED THE NEED FOR THE CONCRETE WASHOUT ON SITE DISCUSSED PLACEMENT OF THE STABILIZED CONSTRUCTION ENTRANCE ACCESS AREA ON NE SIDE OF SITE IS TO BE CLOSED OFF |
|
| 06/23/2006 | ENGINEERING PRE-CONSTRUCTION | Correction Required | -NO CONCRETE WASH OUT ON SITE -NO SWPPP, NOI, PERMITS, OR PLANS POSTED -ADDL MATERIALS BEING STOCKPILED AND NOT PROTECTED -TRACK OUT IN PARKING LOT AT 7000 E CENTURY PARK -TRACK OUT IN DRIVEWAY FOR EXEL LEFT MSG AT 623-1411 AT 8AM MAILED INSPECTION TO LEVIN AND SONS LLC |