Permit: T06BU00961
Permit Details
Apply Date:
04/21/2006
Applicant:
N/A
Description:
GRADING: SOUTHGATE BUSINESS PARK
Contractors:
- RIO WEST DEVELOPMENT AND CONSTRU
Permit Reviews
Permit Number - T06BU00961
Permit Status: Expired
Permit Description: GRADING: SOUTHGATE BUSINESS PARK
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/21/2006 | PLANS OK TO SUBMIT - GRADING | 04/21/2006 | COMPLETED |
04/21/2006 | GRADING | 06/02/2006 | COMPLETED |
04/25/2007 | REVISION - GRADING | 04/25/2007 | COMPLETED |
07/14/2006 | RESUBMITTAL - GRADING ALL | 09/20/2006 | COMPLETED |
10/12/2006 | RESUBMITTAL - GRADING ALL | 10/19/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06BU00961
Permit Status: Expired
Permit Description: GRADING: SOUTHGATE BUSINESS PARK
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/21/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
10/17/2006 | NPPO PRE PERMIT INSPECTION MUST BE PERFORMED PRIOR TO GRUBBING OR GRADING. |
10/17/2006 | LANDSCAPE INSPECTION REQUIRED. |
10/17/2006 | ALL LANDSCAPE AREAS SHALL BE DEPRESSED A MAXIMUM OF 6' TO ACCOMODATE WATER HARVESTING. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T06BU00961
Permite Description: GRADING: SOUTHGATE BUSINESS PARK
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
NPPO PRE PERMIT INSPECTION | N/A | Not Inspected | ||
LANDSCAPE INSPECTION | N/A | Not Inspected | ||
01/06/2009 | GRADING - CHECK FOR ACTIVITY | N/A | Correction Required | Contractor still has not address lot stabilization and basin is holding water for more then 24 hours. |
01/09/2008 | GRADING - INTERMEDIATE | N/A | Continued | Met with concrete contractor for Bldg 4. Inspected sidewalk in front of bldg. Curb ramp did not have 48" clear landing so flares need to be 12:1. Contractor had it formed at that slope. OK to pour. |
12/13/2007 | GRADING - FINAL | N/A | Denied | Contractor needs to complete punch list for release of gas station 1999 E. Ajo Way. This punch list is only for the southeast corner of project: 1. Provide letter from engineer in regards to C.O.T. Drainage Manual, chapter XIV, section 14.2 (7). 2. Repair holes in asphalt. 3. Install rip rap on 2-12" CMP pipes that cross southeast entrance. Per approved drawings, note #19, detail Q/3 and H/2. 4. Install rip rap at all curb cuts. Per approved drawings, notes #3 and 16. 5. Install all curbing per approved drawings, note #1. (SD 209) 6. Complete all striping per approved drawings. 7. Install all curb cuts, per approved drawings, notes #3 and 16. 8. Stabilize all side slopes per the approved drawings. 9. Install basin on east side per the approved drawings. 10. Recess all landscape areas for water harvesting, per note #8, on approved drawings. 11. Paint post barricades in trash enclosure. 12. Install 12" CMP on north side of building, per approved drawings. (act. 4") 13. Install concrete catch basin per approved drawings, detail R/3. 14. Address ponding on northeast corner HC ramp. 15. Backfill around sidewalk northeast corner of project. 16. Complete all parking north side of building per approved drawings. 17. Address erosion northwest side of building. (per note #8 recess 6") 18. Complete public access from E. Ajo Way, per approved drawings. 19. Install concrete for loading zone southwest corner of building, per note #22 of approved drawings. 20. Install final lift of asphalt or adjust all utility manholes and boxes to grade. 21. Install 10' concrete pad in front of trash enclosure, per detail F/2 of the approved drawings. 22. Pin down all wheel stops, per detail D/2 on the approved drawings. 23. Install parking area on west, south and east side of building per note #22 of approved drawings. 24. Install drainage in rear of building per approved drawings. 25. Provide 24' PAAL for roadway north side of building. (act. 19'and 23') 26. Have engineer provide C.O.T. with approved revised drawing showing all changes for next inspection. 27. Engineer needs to address the use of asphalt in place of concrete. Provide data showing asphalt thickness. Met with Joe site super and went over punch list. |
12/22/2006 | STORMWATER FOLLOW-UP INSP | N/A | Partial Approval | Contractor addressed items from last inspection. |
Completed Inspections
Permit Status: Expired
Permit Number: T06BU00961
Permit Description: GRADING: SOUTHGATE BUSINESS PARK
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2006 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | Complete pre-con with contractor. |
11/25/2006 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | Contractor installed controls. |