Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T06BU00961


Addresses:

1975 E AJO WY


Inspection Status: Partial Approval

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T06BU00961

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Partial Approval

Date Description Inspector Results Comments
09/16/2008 STORMWATER FOLLOW-UP INSP Partial Approval Contractor continues to stabilize perimeter of project.
09/02/2008 STORMWATER FOLLOW-UP INSP Partial Approval Contractor placing DG around perimeter of project.
05/12/2008 STORMWATER FOLLOW-UP INSP Partial Approval Safety barrier in place.
12/04/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice, contractor has 5 days to address:
1- Engineer needs to address basins holding water longer then 24 hours.
2- Address erosion in north basin, make repairs and add contols as needed. (2nd notice)
3- Sweep main street northside of project. Stop track out from open lots.
4- Install controls at north entrance (westside) silt ran into streets.
Spoke to Pete site super. If items are not addressed I will issue a Notice Of Violation.
11/27/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice, contractor has 6 days to address:
1- Make repairs to SWPPP controls, wattle is broken, not staked down, falling in basin and buried on east and northeast side of project.
2- Clean washout from basin and around basin.
3- Provide invert elev. for all inlet and outlets. (stormpipe)
If items are not addressed will issue a Notice of violation or stop work order. Spoke to Pete site super in regards to.
11/14/2007 STORMWATER FOLLOW-UP INSP Correction Required Spoke to site super Pete in regards to repairing SWPPP controls on site. Contractor to set up meeting time. If not will issue Notice of Violation.
10/22/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Repair wattle.
2- Clean catch basin.
3- Install wattle around catch basins.
4- Contractor needs to provide phased plan for release of gas station on the southeast corner.
Spoke to Pete site super in regards to items.
09/13/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to install construction entrances at all gate opens. Also need controls installed around all catch basins. Spoke to New super for site Pete.
09/11/2007 STORMWATER FOLLOW-UP INSP Not Applicable Explained to Kyle would be out in the morning for inspection.
09/10/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued Notice of Violation, Contractor needs to address:
1- Install working construction entrance.
2- Find copy of the approved SWPPP.
Contractor has 2 days to or I will issue a stop work order. Spoke to Pete Kennedy super on site.
09/07/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to sweep street and install construction entrance.
09/04/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Sweep street.
2- Instasll controls per detail.
3- Repair construction entrance.
4- Install controls in catch basin.
Spoke to site super in regards to items. I explained if site not in conplaince I will issue a notice of violation on 9/7/07.
08/22/2007 STORMWATER FOLLOW-UP INSP Correction Required Met Kyle on site in regards to SWPPP issues. Went over all SWPPP issues with site.
1- Contractor does not have ant SWPPP doc.'s for site.
2- Controls not installed properly.
Faxed stormwater training info to Kyle for the National Stormwater Summit in Tucson on 9/5/07.
07/24/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Repair construction entrance. (track out)
2- Repair controls around catch basins.
3- Contractor needs to ensure wash out is used. (mason)
4- Repair controls around perimeter of project.
5- Replace controls around basin.
06/29/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor has 4 days to complete:
1- Provide concrete wash out and ensure use by sub-contractors.
2- Clean up wash out around site.
3- Repair controls (SWPPP) around perimeter of project.
4- Install all controls per approved details.
5- Repair gaps in wattle.
If items are not addressed a notice of violation will be issed. Spoke to Kyle site super.
06/15/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Install concrete wash out area.
2- Ensure sub-contractors use wash out area.
3- Keep SWPPP controls in working order.
Left copy of inspection on trailer door. (1148)
05/17/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair/replace silt fence. Spoke to Scott (271-5913) in regards to issue. Kyle will be new super on site (661-8454). Contractor still needs to provide as-builts for installed stormsewer pipe.
04/23/2007 STORMWATER FOLLOW-UP INSP Partial Approval No stormwater concerns at this time. Contractor installing water lines. Contractor still has not provided as-builts elev. for stormwater piping.
03/19/2007 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Scott in regards to:
1- Repairing silt fence around site.
2- Contractor will need to provide as-builts of stormwater pipe inverts and outlets.
Scott cell 271-5913.
02/08/2007 STORMWATER FOLLOW-UP INSP Partial Approval No activity on site. Need to watch north side.
01/26/2007 STORMWATER FOLLOW-UP INSP Partial Approval Keep track out cleaned up.
01/18/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean track out leaving site. Re-install construction entrance. Also received complaint call for home owner on Jason Vista Rd. Contractor filling water truck from hyd. on Jason Vista. Home owner complained about the amount of mud being made by truck driver. Spoke to Scott site super and explained that he needs to keep area clean or find a new hyd. to use.
12/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor addressed items from last inspection.
11/30/2006 STORMWATER FOLLOW-UP INSP Partial Approval Spoke to Scott in regards to:
1- Repairing silt fence on west side of project. (Dalco repaired)
2- Repairing security fence on northwest corner of project.
3- Contractor needs to extend construction entrance. (30WX50L)