Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T06BU00766
Permit Details
Apply Date:
04/03/2006
Applicant:
N/A
Description:
GRADING:700CY CUT 1000CY FILL
Contractors:
- LE COCQ CONSTRUCTION COMPANY INC
Permit Reviews
Permit Number - T06BU00766
Permit Status: Expired
Permit Description: GRADING:700CY CUT 1000CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2007 | RESUBMITTAL - GRADING | 04/03/2007 | COMPLETED |
| 04/03/2006 | PLANS OK TO SUBMIT - GRADING | 04/03/2006 | COMPLETED |
| 04/03/2006 | GRADING | 05/23/2006 | COMPLETED |
| 04/03/2007 | RESUBMITTAL - GRADING ALL | 05/01/2007 | COMPLETED |
| 05/01/2007 | RESUBMITTAL - GRADING | 05/03/2007 | COMPLETED |
| 06/22/2006 | RESUBMITTAL - GRADING ALL | 08/02/2006 | COMPLETED |
| 08/17/2006 | RESUBMITTAL - GRADING | 11/07/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06BU00766
Permit Status: Expired
Permit Description: GRADING:700CY CUT 1000CY FILL
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 04/03/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 06/26/2006 | LANDSCAPE INSPECTOR MUST CHECK FENCING AND TAGGING OF IDIVIDUAL TREES AND NATURAL AREAS PRIOR TO GRUBBING OR GRADING. |
| 08/17/2006 | The following 14 conditions will be applied to the grading permit T06BU00766 once issued: 1) A copy of the Grading Plan, Grading Permit, and any Geotechnical Reports shall be kept at the site at all times, until final grading approval. A copy of the ADEQ AZPDES General Permit must be a part of the SWPPP at the site. 2) Call for SWPPP inspection and PRE-CONSTRUCTION MEETINGS. For DSD Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: HTTP://WWW.CI.TUCSON.AZ.US/DSD/ONLINE_SERVICES/ONLINE_PERMITS/ONLINE_PERMITS.HTML 3) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 4) Contact Permits and Codes (791-5100) for any questions regarding any right-of-way permit requirements. 5) There shall be NO disturbance outside of the disturbance/grading limits. 6) Truncated domes are required for any access ramps per ADAAG. This is an update to COT standard detail 207. 7) Operator shall report to ADEQ any noncompliance (including spills) which may endanger human health or the environment. The operator shall orally notify the office listed below within 24 hours: Arizona Department of Environmental Quality, 1110 W. Washington, 5th floor (5515B-1), Phoenix, AZ 85007, Office: 602-771-4466; Fax 602-771-4505 8) Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact DSD Engineering at 791-5550 to discuss changes in grading design. 9) ALL improvements (including any permanent erosion controls) shall be completed for final approval by COT DSD Engineering. 10) AS-BUILTS AND LETTERS OF COMPLETION for erosion protection, basins, and overall project are required. The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage facilities and their permanent protective devices, and all erosion control measures have been completed in accordance with the approved grading plan and grading permit, and any required reports have been submitted. 11) Recommendations for the addressing the closure of the open, underground water encachements and wells shall be followed according to Geotechnical Report for this project: 63055036 and any addenda including later dated January 13, 2006. 12) Call for special DSD inspection for erosion hazard setback erosion protection placement PRIOR to backfilling. 13) Submit a sealed document from the Geotechnical Engineer regarding backfill COMPACTION after the reno mattress installation. 14) Grading for DUMPSTER ENCLOSURE SHALL BE ELEVATED to direct stormwater to basin and prevent drainage entering or draining through the dumpster enclosure. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T06BU00766
Permite Description: GRADING:700CY CUT 1000CY FILL
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2008 | NPPO PRE PERMIT INSPECTION | N/A | Correction Required | NPPO pre permit inspection not performed prior to grading. |
| 05/12/2008 | LANDSCAPE INSPECTION | N/A | Correction Required | See note #3 on landscape plan. Except as otherwise provided by this Division, the area between the right-of-way line and sidewalk and the area between the sidewalk and the curb, if not covered with vegetation, shall be covered with an appropriate inorganic ground cover, such as decomposed granite. |
Completed Inspections
Permit Status: Expired
Permit Number: T06BU00766
Permit Description: GRADING:700CY CUT 1000CY FILL
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2007 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | |
| 05/18/2007 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | |
| 10/05/2007 | GRADING - INTERMEDIATE | MRUSSO | Approved | NO SITE WORK HAS BEEN STARTED, HOWEVER STRUCTURES ARE BEING BUILT. CONCRETE IN RET/DET BASINS, SLOPES NOT PER PLAN. PERIMETER WALL NOT IN PLACE. |
| 12/11/2007 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO SITE WORK HAS BEEN ACCOMPLISHED, BLDGS ARE UP. STORM WATER BMPS ARE IN PLACE AND WILL CONTINUE TO BE REQUIRED TO BE MAINTAINED UNTIL THE SITE IS STABILIZED. RET/DET BASINS NEED LAYER OF SILT, CONSTRUCTION MATERIALS, DEBRIS, AND WASTE REMOVED PRIOR TO APPROVAL. |
| 04/17/2008 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
| 05/15/2008 | GRADING - FINAL | MRUSSO | Approved |