Permit: T05CM06452
Permit Details
Apply Date:
12/27/2005
Applicant:
DAVID BLAIR
Description:
DUPLEX TD # 16-53-17
Contractors:
- BOULDER CANYON BUILDERS INC ,
Permit Reviews
Permit Number - T05CM06452
Permit Status: Final
Permit Description: DUPLEX TD # 16-53-17
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/27/2005 | RESIDENTIAL BLDG-MODEL PLAN/ENGINE/WALK THRU | 12/28/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM06452
Permit Status: Final
Permit Description: DUPLEX TD # 16-53-17
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
12/27/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05CM06452
Permit Description: DUPLEX TD # 16-53-17
Total Completed Inspections - 29
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/20/2006 | SITE - SEWER | RMYERS | Approved | IVRS - Inspection :* 1. 4" SEWER FROM TAP AT MAIN INCLUDING DIRECTIONAL CLEAN OUT AT P.L AND ALL THE WAY TO WITHIN TEN FEET FROM THE BLDG 3 PLACES - OK 2. GREEN TRACER WIRE INSTALLED PER H.B. 2256 AND PCWWM DETAIL #4 3. OK TO COVER |
01/20/2006 | SITE - SEWER | RMYERS | Approved | IVRS - Inspection :*EXCEPT FOR THE TWO WAY CLEAN OUT, WHERE THE BLDG. DRAIN & BLDG. SEWER CONNECT, CLEAN OUTS SHALL OPEN IN THE DIRECTION OF FLOW. CLEAN OUTS ARE REQUIRED WHEN YOU EXCEED ONE HUNDRED FEET, AND HWN YOU EXCEED 135 DEGREE CHANGE OF DIRECTION. A DIRECTIONAL CLEAN OUT IS REQUIRED AT THE PROPERTY LINE-PER PCWWM DETAIL 104. TRACER WIRE IS REQUIRED PER DETAIL 104 PCWWM AND HOUSE BILL 2256 |
01/25/2006 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection :* 1. SEWER APPROVED ON 12/06 2. UNDERGROUND NOT INSTALLED PER PLAN NO REDLINES ON SITE INSTALL PER PLAN OR REVISE PLAN |
01/26/2006 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1) CORRECTION MADE OK 2) ROUGH SOIL OK TO COVER 3) RED LINES ON SITE |
02/06/2006 | ELECTRIC - UFER | CCLEMENS | Approved | IVRS - Inspection :* |
02/14/2006 | BUILDING PRE-SLAB | AQUIROZ | Approved | IVRS - Inspection :* |
02/14/2006 | EXCAVATION/LAYOUT REBAR & ZON | AQUIROZ | Approved | IVRS - Inspection :* |
03/20/2006 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* |
03/21/2006 | ROOF NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
04/07/2006 | ELECTRIC - CABLE DROP | CCLEMENS | Approved | IVRS - Inspection :* 1) DRIVE GROUND RODS |
04/07/2006 | ELECTRIC - TEMPORARY SERVICE | CCLEMENS | Approved | |
04/13/2006 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* OK TO COVER |
04/26/2006 | FRAMING | AQUIROZ | Approved | IVRS - Inspection :* |
04/27/2006 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | OK FOR SHEETROCK 1ST FLOOR BACKDRAFT DAMPER MISSING IN EXHAUST FAN 2ND FLOOR DAMPER STUCK WILL CHECK ON FINAL. |
04/27/2006 | PLUMBING - INTERMEDIATE | RMYERS | Approved | 1. PVC DWV THRU ROOF OK 2. PEX OK 3. TUBS OK 4. CLOSET FLANGES OK OK TO COVER ALL AREAS |
05/10/2006 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* |
05/12/2006 | STUCCO MESH | AQUIROZ | Approved | IVRS - Inspection :* |
06/30/2006 | TEP CLEARANCE - AM | JWEATHER | Approved | ECO CLEARED FOR UNIT #2 PER C. CLEMENS |
07/20/2006 | PLUMBING - FINAL | RMYERS | Approved | IVRS - Inspection :* PLUMBING FINAL OK OK FOR C OF O S.T.O.I |
07/20/2006 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
07/23/2006 | OUTDOOR LIGHTING FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
07/23/2006 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
07/23/2006 | ELECTRIC - OUTDOOR LIGHTING | RHOLLAND | Approved | IVRS - Inspection :* |
07/23/2006 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* |
07/23/2006 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | IVRS - Inspection :* |
07/25/2006 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* |
07/25/2006 | U VALUE FOR WINDOW | AQUIROZ | Approved | IVRS - Inspection :* |
07/25/2006 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* |
07/26/2006 | PERMIT FINALED | BFLORES | Approved |