Permit: T05CM06409
Permit Details
Apply Date:
12/23/2005
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
NEW SHELL BLDG R2-revised structual sheets to show mech unit locations. no weights shown yet truss package provided for reference only. R3-a new 4" bldg. sewer has been installed due to the existing bldg. sewer was to shallow.
Contractors:
- RIO WEST DEVELOPMENT AND CONSTRU
Permit Reviews
Permit Number - T05CM06409
Permit Status: Final
Permit Description: NEW SHELL BLDG
R2-revised structual sheets to show mech unit locations. no weights shown yet truss package provided for reference only.
R3-a new 4" bldg. sewer has been installed due to the existing bldg. sewer was to shallow.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/03/2007 | COMMERCIAL NEW | 02/26/2007 | COMPLETED |
| 01/15/2008 | 3RD PARTY REVIEW-REVISION/OTHER | 01/15/2008 | COMPLETED |
| 03/13/2007 | RESUBMITTAL | 05/30/2007 | COMPLETED |
| 04/07/2010 | REVISION - - 1ST | 04/07/2010 | COMPLETED |
| 06/27/2007 | RESUBMITTAL | 07/02/2007 | COMPLETED |
| 07/10/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 07/30/2007 | COMPLETED |
| 07/30/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 09/28/2007 | COMPLETED |
| 09/28/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 11/15/2007 | COMPLETED |
| 11/19/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 11/20/2007 | COMPLETED |
| 11/20/2007 | POST 3RD PARTY REVIEW | 11/21/2007 | COMPLETED |
| 12/18/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 12/18/2007 | COMPLETED |
| 12/23/2005 | PLANS OK TO SUBMIT - COMM | 12/23/2005 | COMPLETED |
| 12/23/2005 | COMMERCIAL NEW | 02/08/2006 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T05CM06409
Permit Description: NEW SHELL BLDG
R2-revised structual sheets to show mech unit locations. no weights shown yet truss package provided for reference only.
R3-a new 4" bldg. sewer has been installed due to the existing bldg. sewer was to shallow.
Total Completed Inspections - 37
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2007 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :* |
| 09/05/2007 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 09/12/2007 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :* |
| 10/17/2007 | ENGINEERING - FINAL | MAVERY | Approved | Met with super on site. Explained that contractor needs to keep up with BMP's for site. I explained I would be back in 14 days to see if site is cleaned. If not cleaned I will issue a correction notice. |
| 10/29/2007 | ELECTRIC - UNDERGROUND | RMORENO | Approved | IVRS - Inspection :* 2" CONDUITS FOR EM. POWER TO TRANSFER SWITCH INSTALLED BELOW SLAB - CALL UNDER PROPER ACT # |
| 10/29/2007 | SITE - SEWER | RRICH | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE CITY APPROVED PLAN OF ACTUAL SEWER INSTALL 2. SHALL PROVIDE APPROVED FITTING AT CONNECTION TO EXISTING SEWER 3. PLAN CALLS ALL NEW WORK AS EXISTING 4. NOTE: IN FUTURE PLEASE HAVE A SEWER PRE-CONSTRUCTION MEETING PRIOR TO BEGINNING 5. VERIFICATION OF GRADE SHALL BE REQUIRED BY LICENSED SURVEYOR OR ENGINEER |
| 12/13/2007 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | Visual inspection - OK to cover Need pressure test and flush |
| 12/20/2007 | REINFORCED MASONRY PRE-GROUT | MHENSON | Approved | |
| 12/20/2007 | BUILDING PRE-SLAB | MHENSON | Approved | IVRS - Inspection :* RADIUS 8' LIFT WITH CLEAN OUTS |
| 02/25/2008 | STUCCO MESH | MHENSON | Approved | IVRS - Inspection :* |
| 03/03/2008 | FRAMING | MHENSON | Approved | IVRS - Inspection :* OK TO ROCK RISER ROOM REPAIR STUD NEXT TO BLK WALL |
| 03/05/2008 | PLUMBING - ROOF DRAINS | RLEDONNE | Approved | IVRS - Inspection :* |
| 03/13/2008 | SHEET ROCK NAILING | MHENSON | Approved | IVRS - Inspection :* |
| 05/21/2008 | U VALUE FOR WINDOW | MHENSON | Approved | IVRS - Inspection :* 1. NEED SPECIAL INSPECTION FOR EPOXIED LINTEL BOLTS 2. 01030 ROOF NAILING APPROVED 1/17/08 3. 01015 BLDG. PRE SLAB INTERIOR SLAB TO BE POURED AT TI APPROVED |
| 05/21/2008 | ROOF NAILING | MHENSON | Approved | IVRS - Inspection :* |
| 06/27/2008 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* ANSWER QUESTIONS 1. POST BOND FOR POWER |
| 06/27/2008 | NPPO - FINAL | ACONNOR | Approved | |
| 06/27/2008 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 06/27/2008 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
| 07/01/2008 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | |
| 07/02/2008 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED FOR HOUSE PANEL PER D. SANTACRUZ |
| 02/12/2010 | BUILDING ABOVE CEILING | GDABBS | Approved | IVRS - Inspection :* |
| 02/16/2010 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 02/16/2010 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 02/17/2010 | PLUMBING - BACK WATER VALVE | RLEDONNE | Approved | IVRS - Inspection :* |
| 03/10/2010 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* |
| 03/10/2010 | PLUMBING - PRE SLAB | RLEDONNE | Approved | IVRS - Inspection :* |
| 03/10/2010 | PLUMBING - ROUGH, SOIL | RLEDONNE | Approved | IVRS - Inspection :* |
| 04/08/2010 | ELECTRIC - OUTDOOR LIGHTING | RMORENO | Approved | IVRS - Inspection :* 1) SERVICE AS PRINT ALL OK |
| 04/08/2010 | ELECTRIC - FINAL | RMORENO | Approved | IVRS - Inspection :* |
| 04/08/2010 | OUTDOOR LIGHTING FINAL | RMORENO | Approved | IVRS - Inspection :* |
| 05/12/2010 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 05/18/2010 | BUILDING - FINAL | GDABBS | Approved | IVRS - Inspection :* |
| 05/18/2010 | PLUMBING - FINAL | RLEDONNE | Approved | IVRS - Inspection :* |
| 05/18/2010 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* |
| 05/20/2010 | PLUMBING - PROGRESS | RLEDONNE | Approved | |
| 05/20/2010 | ELECTRIC - ABOVE CEILING | RMORENO | Approved |