Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2010 | ENGINEERING - FINAL | Approved | ALL CONCERNS HAVE BEEN ADDRESSED. SIDEWALKS HAVE BEEN REDONE AND MEET REQUIREMENTS. | |
| 04/07/2010 | ENGINEERING - FINAL | Denied | Provide a clear 4 ft sidewalk along west side of building with a max cross slope of 2%. Provide a access ramp with max slope of 1:12 (8.3%) and a clear space of 4 ft, west side of building. Gravel area to the north of building is stabilized and does not need additional work. |
|
| 10/17/2007 | ENGINEERING - FINAL | Correction Required | Met with super on site. Explained that contractor needs to keep up with BMP's for site. I explained I would be back in 14 days to see if site is cleaned. If not cleaned I will issue a correction notice. | |
| 10/04/2007 | ENGINEERING - FINAL | Correction Required | Contractor needs to: 1- Clean up all wash out. 2- Sweep asphalt. Contractor is not using best BMP. |