Permit: T05CM02434
Permit Details
Apply Date:
05/27/2005
Applicant:
DAVID SHAMBACH
Description:
TI: COMMERCIAL VET CLINIC
Permit Reviews
Permit Number - T05CM02434
Permit Status: C of o
Permit Description: TI: COMMERCIAL VET CLINIC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/28/2006 | REVISION - WALK THRU | 03/01/2006 | COMPLETED |
| 03/01/2006 | REVISION - SITE | 03/09/2006 | COMPLETED |
| 05/27/2005 | PLANS OK TO SUBMIT - 3RD PARTY | 05/27/2005 | COMPLETED |
| 05/27/2005 | 3RD PARTY REVIEW-COMMERCIAL TI | 07/20/2005 | COMPLETED |
| 07/20/2005 | POST 3RD PARTY REVIEW | 07/27/2005 | COMPLETED |
| 07/27/2005 | RESUBMITTAL | 08/02/2005 | COMPLETED |
| 10/12/2005 | 3RD PARTY REVIEW-REVISION/OTHER | 10/12/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM02434
Permit Status: C of o
Permit Description: TI: COMMERCIAL VET CLINIC
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/27/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM02434
Permit Description: TI: COMMERCIAL VET CLINIC
Total Completed Inspections - 31
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2005 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* 1) 3/4" H20 SUPPLY TO (4) FLUSHING FLOOR DRAINS OK |
| 10/19/2005 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 10/26/2005 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* |
| 10/26/2005 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* |
| 10/26/2005 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* |
| 10/26/2005 | FRAMING | AMATHIES | Approved | IVRS - Inspection :* |
| 10/27/2005 | PLUMBING - ABOVE CEILING | RRICH | Approved | IVRS - Inspection :* |
| 10/27/2005 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
| 11/10/2005 | SHEET ROCK NAILING | AMATHIES | Approved | IVRS - Inspection :* |
| 11/29/2005 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :*NO BOND REQUIRED BLD HAS POWER FROM EXISTING SERVICE |
| 11/30/2005 | TEP CLEARANCE - AM | JKOZUCH | Approved | ECO |
| 12/15/2005 | PLUMBING - GAS PRESS TEST FNL | BBENEDON | Approved | IVRS - Inspection :*14.2 PSI GAS TO 2 ROOF TOP UNITS. OK OK FOR GAS PENDING MECHANICAL INSPECTION AND BOND. |
| 12/15/2005 | MECHANICAL - ABOVE CEILING | CWILLIAM | Approved | IVRS - Inspection :* |
| 12/15/2005 | ELECTRIC - OUTDOOR LIGHTING | DSANTACR | Approved | IVRS - Inspection :* |
| 12/15/2005 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* |
| 12/15/2005 | PLUMBING - GAS PRESSURE TEST | BBENEDON | Approved | IVRS - Inspection :* |
| 12/20/2005 | ELECTRIC - FINAL | RMAJUTA | Approved | IVRS - Inspection :*APPROVED |
| 12/21/2005 | ENGINEERING - FINAL | NKALAHAR | Approved | - PAAL STRIPED SW SIDE OF LOT (CHANGE NEEDS TO BE APPROVED THROUGH 201 N STONE - 1 HANDICAPPED (VAN ACCESSIBLE SIGNED/PAINTED) CHANGE TO THE ACCESS AREA STRIPING-STRIPED ON WEST SIDE OF SPACE-SITE PLAN SHOWS EAST SIDE. - SOME FENCING MATERIAL BTWN BLDG AND WALL ON N SIDE OF PROJECT - PAAL AT N SIDE OF SITE STRIPED - PAVING COMPLETE - CONST DEBRIS/PORTABLE TOILET NEED TO BE REMOVED |
| 12/21/2005 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection : MUST PERMIT OR REMOVE EXST BANNER The occupancy inspection reveals that corrections are required. Please furni |
| 12/22/2005 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection : See detailed listing on site.| 999* 1) UNITS IMPROPERLY FUSED |
| 12/22/2005 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection :* |
| 12/23/2005 | FIRE - FINAL | LLAKEY | Approved | |
| 01/10/2006 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
| 01/19/2006 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* BACKFLOW PERMIT #NS3271 |
| 01/20/2006 | BUILDING PRE-SLAB | LHANLY | Approved | |
| 01/20/2006 | BUILDING ABOVE CEILING | LHANLY | Approved | |
| 01/20/2006 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 04/18/2006 | NPPO - FINAL | ACONNOR | Approved | |
| 04/18/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 04/19/2006 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | APPROVAL GIVEN PER CONVERSATION WITH S. LONG |
| 04/27/2006 | PERMIT FINALED | LJACKSON | Approved |