Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) 3/4" H20 SUPPLY TO (4) FLUSHING FLOOR DRAINS OK |
|
| 09/14/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) PIPE WRAPS OK INSTALL H20 PIPING PER PLAN FOR FLUSHABLE FLOOR DRAINS |
|
| 09/08/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WATER TEST VENT UNDERGROUND (PARTIAL APPROVAL) 2) NEED TO VIEW PIPE WRAPS PRIOR TO CONCRETE |
|
| 09/07/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) PROVIDE UPPER TERMINAL CLEANOUT AT ALL BRANCHES OVER 5' FROM TRUNK SEWER 2) PLEASE HAVE PLUMBING ISOMETRIC DRAWINGS PROVIDED FOR THIS JOB |