Address:
250 N PANTANO RD
Address NEW:
250 N PANTANO RD
Apply Date:
05/23/2005
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
NEW RETAIL SHELL
Contractors:
  • LLOYD CONSTRUCTION COMPANY INC ,

Permit Reviews

Permit Number - T05CM02332
Permit Status: Final
Permit Description: NEW RETAIL SHELL
Start Date Submittal Complete Date Status  
05/23/2005 PLANS OK TO SUBMIT - 3RD PARTY 05/23/2005 COMPLETED Review Details
05/23/2005 3RD PARTY REVIEW-COMMERCIAL 08/05/2005 COMPLETED Review Details
08/05/2005 POST 3RD PARTY REVIEW 09/20/2005 COMPLETED Review Details
09/06/2006 3RD PARTY REVIEW-REVISION/OTHER 11/17/2006 COMPLETED Review Details
09/21/2005 RESUBMITTAL 09/28/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T05CM02332
Permit Status: Final
Permit Description: NEW RETAIL SHELL
Total Outstanding Activity Conditions - 1
Date Name
05/23/2005 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T05CM02332
Permit Description: NEW RETAIL SHELL
Total Completed Inspections - 38
Date Description Inspector Results Comments
10/19/2005 ELECTRIC - TEMPORARY SERVICE RSUBA Approved IVRS - Inspection :*
10/20/2005 TEP CLEARANCE - AM JKOZUCH Approved ECO
11/14/2005 ELECTRIC - UFER RHOLLAND Approved IVRS - Inspection :*
1) OK 3-3/0 TO 20' REBAR
2) ? NEED 2-3/4 X 10 GROUND RODS ? PLEASE CHECK WITH ENGINEER AND GET A LETTER
11/30/2005 EXCAVATION/LAYOUT REBAR & ZON JCAGLE Approved IVRS - Inspection :*FOOTING @ LINES B/10
12/05/2005 STEM WALL/RETAINING WALL JCAGLE Approved IVRS - Inspection :*LINES B/1-9.9 D/7-10 ( STEM WALL)
GET CLARIFICATION FROM ENGINEER AS TO MASON? @ LINES 10/B IS A COLUMN OR PIER.
12/12/2005 ELECTRIC - INTERMEDIATE RSUBA Approved IVRS - Inspection :*
FEEDERS & PARTIAL OK T.E.P
12/12/2005 PLUMBING - ROUGH, SOIL TRINIVJR Approved IVRS - Inspection :*SOIL WATER TEST IS OK
NOTE: BLDG DRAIN IS STUBBED OUT OF BLDG @ TWO WAY C.O ONLY
OK TO BACKFILL TRENCH SHALL USE CLEAN FILL.
12/30/2005 REINFORCED MASONRY PRE-GROUT JCAGLE Approved IVRS - Inspection :
See detailed listing on site.| 999*
1) JOB SITE LOCKED-NO ACCESS
12/30/2005 BUILDING PRE-SLAB IVR USER Approved IVRS - RI canceled
03/29/2006 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
(2) 4" SCH 40 PVC HCS FROM 2-WAY CLEANOUT TO EXISTING POINT OF CONNECTION.
04/10/2006 ROOF NAILING JBURGE Approved IVRS - Inspection :*
04/11/2006 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved overhead press test OK
04/18/2006 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
SUPPLY & EXHAUST IN RESTROOMS OK
CONDENSATE DRAINS OK
OK TO SHEETROCK
04/21/2006 SHEET ROCK NAILING JBURGE Approved IVRS - Inspection :*
04/26/2006 EXT METAL CLIPS/EXT SHEATHING JCAGLE Approved IVRS - Inspection :*
05/19/2006 STUCCO MESH JBURGE Approved IVRS - Inspection :*
05/31/2006 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
06/20/2006 ELECTRIC - OUTDOOR LIGHTING RSUBA Approved IVRS - Inspection :*
1) OK BATHROOMS, COMPLETE NOTE BATTERY BACK UP
2) OK HOUSE PANEL LIGHTING CONTRACTOR, ROOF, EXTERIOR LIGHTING AND FLOW SWITCH
07/06/2006 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection :*
OK FINAL
1. RECEPTACLE COVER TO BE WEATHERPROOF WHETHER OR NOT PLUGGED IN 406.8
2. CHASE NIPPLE NOT APPROVED FOR GROUNDING, PLEASE RUN A GROUND WIRE.
07/06/2006 ELECTRIC - CABLE DROP RHOLLAND Approved IVRS - Inspection :*
07/11/2006 FIRE - FINAL LTHOMAS Approved
07/11/2006 FIRE SPKLR - FINAL LTHOMAS Approved
07/11/2006 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
07/11/2006 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
07/17/2006 PLUMBING - FINAL RRICH Approved IVRS - Inspection :*
07/17/2006 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
07/17/2006 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
08/21/2006 NPPO - FINAL ACONNOR Approved
08/21/2006 LANDSCAPE - FINAL ACONNOR Approved
08/21/2006 U VALUE FOR WINDOW JBURGE Approved IVRS - Inspection :*
08/21/2006 BUILDING ABOVE CEILING JBURGE Approved IVRS - Inspection :*
08/21/2006 FRAMING JBURGE Approved IVRS - Inspection :*
08/22/2006 RIGHT OF WAY - FINAL NBRIGGS Approved OK TO CLEAR
08/23/2006 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
10/13/2006 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :*
OK FOR FINAL
A/C UNITS WILL BE CONNECTED & DUCTED DURING TENANT IMPROVEMENTS.
10/26/2006 BUILDING - FINAL JBURGE Approved IVRS - Inspection :*
WATER BASINS INSTALLED
12/26/2006 SITE - SEWER RRICH Approved
12/26/2006 ENGINEERING - FINAL JBRUCKME Approved

Documents

File Name Document Type  
EARTHWORKTESTING.TIF DOCUMENTS VIEW
GEOTECHNICALENG.EVALUATION.TIF DOCUMENTS VIEW
SPECIALINSPREPORTS.TIF DOCUMENTS VIEW
DRAINAGERPT.TIF DOCUMENTS VIEW
STRUCCALCS.TIF DOCUMENTS VIEW