Permit: T05CM01823
Permit Details
Apply Date:
04/25/2005
Applicant:
METRO PERMIT EXPRESS
Description:
NEW SHELL (MANUFACTURING)
Architects:
- MORROW, KEVIN THOMAS
Permit Reviews
Permit Number - T05CM01823
Permit Status: Final
Permit Description: NEW SHELL (MANUFACTURING)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/25/2005 | PLANS OK TO SUBMIT - 3RD PARTY | 04/26/2005 | COMPLETED |
| 04/26/2005 | 3RD PARTY REVIEW-COMMERCIAL | 06/15/2005 | COMPLETED |
| 06/15/2005 | POST 3RD PARTY REVIEW | 06/29/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM01823
Permit Status: Final
Permit Description: NEW SHELL (MANUFACTURING)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/25/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05CM01823
Permit Description: NEW SHELL (MANUFACTURING)
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2005 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | IVRS - Inspection :* |
| 09/18/2005 | PLUMBING - SEWER HCS CONNECT | TRINIVJR | Approved | IVRS - Inspection :* 1) HCS CONNECTION IS OK 2) OK TO BACKFILL TRENCH |
| 10/21/2005 | EXCAVATION/LAYOUT REBAR & ZON | AMATHIES | Approved | IVRS - Inspection :*PERIMETER FTGS OK |
| 10/24/2005 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 12/06/2005 | ROOF NAILING | AMATHIES | Approved | IVRS - Inspection :* |
| 12/12/2005 | ELECTRIC - UNDERGROUND | RSUBA | Approved | IVRS - Inspection :* 4" (2) FOR FUTURE T.I. |
| 12/16/2005 | BUILDING PRE-SLAB | AMATHIES | Approved | IVRS - Inspection :*LOT # 13 OK |
| 12/23/2005 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :*TWO 2" TYPE K COPPER WATER RISERS WITH SIL.FOS'D 90 DEGREE AND 100# PRESSURE OK BE SURE AND RECALL INSPECTION WHEN THEY ARE INSTALLED. |
| 01/04/2006 | PLUMBING - BACK WATER VALVE | BBENEDON | Approved | IVRS - Inspection :* |
| 01/05/2006 | PLUMBING - INTERMEDIATE | BBENEDON | Approved | IVRS - Inspection :* |
| 01/13/2006 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 01/13/2006 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 01/18/2006 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* |
| 01/18/2006 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection :* |
| 01/18/2006 | BUILDING ABOVE CEILING | LHANLY | Approved | IVRS - Inspection :* |
| 01/18/2006 | EXT METAL CLIPS/EXT SHEATHING | LHANLY | Approved | IVRS - Inspection :* |
| 01/18/2006 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
| 03/29/2006 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 03/29/2006 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 03/29/2006 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* |
| 03/29/2006 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* |
| 04/13/2006 | FIRE - FINAL | LTHOMAS | Approved | |
| 04/13/2006 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 10/17/2006 | ENGINEERING - FINAL | MAVERY | Approved | Complete punch list. Global Loop T05CM01823 T01BU03068 1. Have engineer certify basin and drainage wasy per chaper XIV, section 14.2(7). 2. Install trucated domes on all HC ramps. 3. Install wheel stops rear of building. 4. Repair curb around basin. 5. Repair erosion in basin inlets. 6. Close out grading permit T01BU03068. 7. Clear all drain pipes in detention basins. 8. Cut all vegatation in bottom of detention basins. 9. Stabilize all slopes 2 to 1 and steeper. 10. Address erosion starting under parking lot. (eastside basin) 11. Have all changes to westside of project approved at 201 N. Stone. 12. Complete safety barrier around all basins. |
| 01/29/2007 | BUILDING - FINAL | AALEGRIA | Approved | IVRS - Inspection :* |