Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2007 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 10/17/2006 | ENGINEERING - FINAL | Denied | Complete punch list. Global Loop T05CM01823 T01BU03068 1. Have engineer certify basin and drainage wasy per chaper XIV, section 14.2(7). 2. Install trucated domes on all HC ramps. 3. Install wheel stops rear of building. 4. Repair curb around basin. 5. Repair erosion in basin inlets. 6. Close out grading permit T01BU03068. 7. Clear all drain pipes in detention basins. 8. Cut all vegatation in bottom of detention basins. 9. Stabilize all slopes 2 to 1 and steeper. 10. Address erosion starting under parking lot. (eastside basin) 11. Have all changes to westside of project approved at 201 N. Stone. 12. Complete safety barrier around all basins. |