Permit: T05CM00552
Permit Details
Apply Date:
02/09/2005
Applicant:
RELIABLE PERMIT MANAGEMENT
Description:
NEW:CULTURAL CENTER
Architects:
- ROBINSON, STEPHEN LYTLE
Contractors:
- K M J COMPANY L L C
Permit Reviews
Permit Number - T05CM00552
Permit Status: C of o
Permit Description: NEW:CULTURAL CENTER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/13/2006 | RESUBMITTAL - SITE | 02/24/2006 | COMPLETED |
| 01/13/2006 | RESUBMITTAL | 02/24/2006 | COMPLETED |
| 02/09/2005 | PLANS OK TO SUBMIT - COMM | 05/18/2005 | COMPLETED |
| 02/09/2005 | PLANS OK TO SUBMIT - SITE | 05/18/2005 | COMPLETED |
| 02/24/2006 | RESUBMITTAL - SITE | 03/22/2006 | COMPLETED |
| 02/24/2006 | RESUBMITTAL | 03/22/2006 | COMPLETED |
| 03/15/2007 | REVISION - SITE | 03/15/2007 | COMPLETED |
| 03/29/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 03/29/2007 | COMPLETED |
| 05/24/2005 | 3RD PARTY REVIEW-COMMERCIAL | 12/06/2005 | COMPLETED |
| 05/27/2005 | SITE | 06/28/2005 | COMPLETED |
| 07/24/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 08/16/2006 | COMPLETED |
| 08/15/2006 | OTHER | 08/15/2006 | COMPLETED |
| 11/07/2005 | RESUBMITTAL - SITE | 12/28/2005 | COMPLETED |
| 11/22/2006 | REVISION - SITE | 11/22/2006 | COMPLETED |
| 12/06/2005 | POST 3RD PARTY REVIEW | 12/28/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05CM00552
Permit Status: C of o
Permit Description: NEW:CULTURAL CENTER
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/09/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T05CM00552
Permit Description: NEW:CULTURAL CENTER
Total Completed Inspections - 42
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/10/2006 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
| 04/13/2006 | STEM WALL/RETAINING WALL | LHANLY | Approved | IVRS - Inspection :* |
| 05/03/2006 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection :* |
| 05/15/2006 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :* |
| 06/22/2006 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* |
| 06/22/2006 | EXT METAL CLIPS/EXT SHEATHING | JBURGE | Approved | IVRS - Inspection :* |
| 08/04/2006 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection :* |
| 09/14/2006 | PLUMBING - YARD WTR LINE/TEST | RLEDONNE | Approved | IVRS - Inspection :* 1. PROVIDE VACUUM BREAKER AT HOSE BIBB 2. ADDRESS ON APPROVED PLANS IS NOT ADDRESS ON INSPECTION REQUEST |
| 09/14/2006 | SIGN - FINAL | JYBARRA | Approved | SPOKE W/MIKE #312-3971 W/WARRIOR CONST/ NOTIFIED HIM THAT NON CONFORMING SIGN IN SITE WOULD NEED TO BE REMOVED BEFORE ANY C/O WOULD BE ISSUED TO SITE; OWNER CAN REUSE THIS SIGN on acct # 2245 |
| 09/18/2006 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection :* |
| 09/19/2006 | PLUMBING - INTERMEDIATE | RLEDONNE | Approved | IVRS - Inspection :* 1. POST ADDRESS 2. REDLINE GAS PIPING 3. PROVIDE APPROVAL PLANS ON WATER PIPING FOR INSTA-HOTS. |
| 09/19/2006 | PLUMBING - GAS PRESSURE TEST | RLEDONNE | Approved | IVRS - Inspection :* |
| 09/25/2006 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* |
| 10/02/2006 | SHEET ROCK NAILING | AALEGRIA | Approved | IVRS - Inspection :* IN COMPLIANCE WITH APPROVED PLANS (1/2" GYP BOARD ALL) |
| 12/15/2006 | EXCAVATION/LAYOUT REBAR & ZON | AALEGRIA | Approved | IVRS - Inspection : See detailed listing on site.| 999* SOME CORRECTION LEFT ON 11/28/06 A REINSPECTION FEE MAY BE CHARGED ON SAME, MAKE SURE TO PROVIDE WORK DONE ACCORDING WITH APPROVED PLANS BEFORE REQUEST INSPECTION. |
| 12/29/2006 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :* 1) OK 2 GROUND RODS PER CODE 2) OK 2 1/2" PVC SECONDARY CONDUIT RUN TO X FORMER. NEED TO VERIFY PER PLAN 3) BLDG LOCKED-CALLED BOTH PHONE NUMBERS ON MSG-NO ANSWER-LFT MSG FOR ETA |
| 01/19/2007 | ELECTRIC - TEMP POWER FOR TEST | DSANTACR | Approved | IVRS - Inspection :* |
| 01/19/2007 | ELECTRIC - TEMPORARY SERVICE | DSANTACR | Approved | IVRS - Inspection :* |
| 01/22/2007 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED PER D. SANTACRUZ |
| 02/08/2007 | PLUMBING - GAS PRESS TEST FNL | RLEDONNE | Approved | IVRS - Inspection :* |
| 02/16/2007 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
| 02/20/2007 | RIGHT OF WAY - FINAL | LLOPEZ | Approved | PER EMAIL |
| 03/06/2007 | U VALUE FOR WINDOW | LHANLY | Approved | |
| 03/06/2007 | FRAMING | LHANLY | Approved | |
| 03/23/2007 | FIRE - ALARM FINAL | LTHOMAS | Approved | APPROVE 3/23/07 : INSP CLEARANCE |
| 03/30/2007 | MECHANICAL - FINAL | AALEGRIA | Approved | IVRS - Inspection :* |
| 03/30/2007 | PLUMBING - FINAL | AALEGRIA | Approved | IVRS - Inspection :* |
| 03/30/2007 | ELECTRIC - FINAL | AALEGRIA | Approved | IVRS - Inspection :* |
| 03/30/2007 | BUILDING - FINAL | AALEGRIA | Approved | IVRS - Inspection :* |
| 03/30/2007 | FIRE - FINAL | CSCHULTZ | Approved | |
| 03/30/2007 | MECHANICAL - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 03/30/2007 | PLUMBING - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 03/30/2007 | ELECTRIC - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 03/30/2007 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 04/02/2007 | MECHANICAL - ABOVE CEILING | AALEGRIA | Approved | |
| 04/02/2007 | PLUMBING - ABOVE CEILING | AALEGRIA | Approved | |
| 04/02/2007 | PLUMBING - SEWER HCS CONNECT | AALEGRIA | Approved | |
| 04/02/2007 | ELECTRIC - ABOVE CEILING | AALEGRIA | Approved | |
| 04/02/2007 | ELECTRIC - OUTDOOR LIGHTING | AALEGRIA | Approved | |
| 04/02/2007 | BUILDING ABOVE CEILING | AALEGRIA | Approved | |
| 04/19/2007 | ENGINEERING - FINAL | MAVERY | Approved | Contractor complete all punch list items. Elev. cert. received per Loren. |
| 04/19/2007 | LANDSCAPE - FINAL | ACONNOR | Approved |