Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2007 | ELECTRIC - CABLE DROP | Approved | IVRS - Inspection :* 1) OK CABLE DROP ONLY-U.G. 2) NO POWER CLEARANCE-JOB MUST BE COMPLETE OR POST BOND FOR TEMP POWER FOR TEST |
|
| 01/05/2007 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO PROGRESS -- SEE NOTES LAST INSP. |
|
| 01/04/2007 | ELECTRIC - CABLE DROP | Partial Approval | IVRS - Inspection :* #2 SOLID TO BE BONDED TO CT ENCLOSURE WHERE GROUNDING ELECTRODE CONDUCTOR BONDED. |
|
| 01/02/2007 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection : See detailed listing on site.| 999* ELECTRICAL PLANS NOT IN SET OF PLANS A REINSPECTION FEE WILL BE ASSESSED NEXT INSPECTION IF PLANS NOT ON SITE. MUST BE APPROVED SET. |
|
| 12/29/2006 | ELECTRIC - CABLE DROP | Partial Approval | IVRS - Inspection :* 1) OK 2 GROUND RODS PER CODE 2) OK 2 1/2" PVC SECONDARY CONDUIT RUN TO X FORMER. NEED TO VERIFY PER PLAN 3) BLDG LOCKED-CALLED BOTH PHONE NUMBERS ON MSG-NO ANSWER-LFT MSG FOR ETA |
|
| 12/15/2006 | ELECTRIC - CABLE DROP | Not ready for Inspection | IVRS - Inspection :* COMPLETE CONDUIT RUN INTO CT CAN PLANS NOT ON SITE |