Permit: T05BU02176
Permit Details
Status:
Expired
Type:
COMMERCIAL OTHER
Address:
2443 W MAJESTIC PARK WY
Address NEW:
2443 W MAJESTIC PARK WY
Apply Date:
08/30/2005
Applicant:
JEFFERY A STANLEY
Description:
GRADING 500 CUT 1000 FILL
Contractors:
- INDEVCO CONSTRUCTION INC
Permit Reviews
Permit Number - T05BU02176
Permit Status: Expired
Permit Description: GRADING 500 CUT 1000 FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/30/2005 | PLANS OK TO SUBMIT - GRADING | 08/30/2005 | COMPLETED |
| 08/30/2005 | GRADING | 10/11/2005 | COMPLETED |
| 12/20/2005 | RESUBMITTAL - GRADING ALL | 01/06/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU02176
Permit Status: Expired
Permit Description: GRADING 500 CUT 1000 FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/30/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Expired
Permit Number: T05BU02176
Permit Description: GRADING 500 CUT 1000 FILL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2006 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | STORM WATER PRE-CONSTRUCTION MEETING ACCOMPLISHED. WALKED THE SITE WITH THE SUPERINTENDENT AND THE SUBCONTRACTOR. THIS PROJECT WILL BE COMPLETED IN TWO PHASES; FIRST PHASE WILL CONSTRUCT THE SITE WORK AND PARKING FOR THE SITE, SECOND PHASE WILL CONSIST OF BLDG CONSTRUCTION. |
| 02/06/2006 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | PLACESEDIMENT CONTROLS ALONG THE WEST EDGE OF PROPERTY, NORTH OF THE PAVED DRIVEWAY. TIE INTO HAY BAILS PER YOUR SWPPP. NO OTHER STORM WATER CONCERNS AT THIS TIME. #09152 SW INSTALL OF CONTROLS APPROVED. |
| 08/29/2006 | LANDSCAPE INSPECTION | ACONNOR | Approved | Entire site must be complete before bond can be released. |
| 08/30/2006 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | STORM WATER CONTROLS ASSOCIATED WITH PHASE 1 OF THIS PROJECT HAVE BEEN REMOVED; HOWEVER DURING CONSTRUCTION OF PHASE 2 THE CONTRACTOR MAY BE REQUIRED TO RE-INSTALL SEDIMENT CONTROLS. |
| 08/30/2006 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | |
| 09/05/2006 | GRADING - INTERMEDIATE | MRUSSO | Approved | SPOKE WITH SUPERINTENDENT AND APPLICANT. APPLICANT WANTS TO CLOSE OUT GRADING AND ADDRESS ALL OTHER ISSUES DURING BLDG CONSTRUCTION (PHASE II OF PROJECT). |
| 09/25/2006 | GRADING - FINAL | MRUSSO | Approved | |
| 02/09/2010 | PERMIT FINALED | KMEDINA | Approved |