Permit: T05BU02176

Parcel: 103090790

Inspection Status: Approved

Inspection History: STORMWATER INSTALL OF CONTROLS

Date Description Inspector Results Comments
02/06/2006 STORMWATER INSTALL OF CONTROLS Approved PLACESEDIMENT CONTROLS ALONG THE WEST EDGE OF PROPERTY, NORTH OF THE PAVED DRIVEWAY. TIE INTO HAY BAILS PER YOUR SWPPP. NO OTHER STORM WATER CONCERNS AT THIS TIME. #09152 SW INSTALL OF CONTROLS APPROVED.