Permit: T05BU00902
Permit Details
Apply Date:
04/18/2005
Applicant:
J R TUTTLE CO
Description:
GRADING:3856CY CUT 2957CY FILL
Contractors:
- J R TUTTLE CO
Permit Reviews
Permit Number - T05BU00902
Permit Status: Final
Permit Description: GRADING:3856CY CUT 2957CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/18/2005 | PLANS OK TO SUBMIT - GRADING | 04/19/2005 | COMPLETED |
| 04/19/2005 | GRADING | 07/08/2005 | COMPLETED |
| 07/08/2005 | RESUBMITTAL - GRADING ALL | 08/05/2005 | COMPLETED |
| 08/05/2005 | RESUBMITTAL - GRADING ALL | 08/15/2005 | COMPLETED |
| 08/15/2005 | RESUBMITTAL - GRADING | 08/16/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU00902
Permit Status: Final
Permit Description: GRADING:3856CY CUT 2957CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/18/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05BU00902
Permit Description: GRADING:3856CY CUT 2957CY FILL
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2005 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | Completed pre-construction meeting with Carl site super. Contractor installing stormwater controls, per SWPPP plan. |
| 12/28/2005 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved | Spoke to contractor in regards to roof drainage. Explained to contractor water from roof drains need to be scuppered under sidewalk. |
| 07/12/2006 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | All areas stabilized. |
| 07/12/2006 | GRADING - FINAL | MAVERY | Approved | Hold C of O until letter from engineer is resised regarding perk test. T05CM03839. |