Permit: T05BU00902

Parcel: 140410470


Addresses:

3120 E MEDINA RD

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
07/12/2006 STORMWATER FOLLOW-UP INSP Approved All areas stabilized.
06/13/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to address items:
1- Clean drainage channel southside of project.
2- Backfill between drainage channel and retaining wall.
3- complete perk test in both basins. (2)
5- Clean the streets Medina and Bonney.
9- Remove stock pile or get proper permits.
10-Remove dirt ramps both sides of building. (2)
11- Stabilize all areas distrubed by construction.
12- Have engineer address scupper installation. (not per C of T Standard)
13- Have engineer address excavations under sidewalks.
14- Clean and remove all construction debris.
15- Clean parking lot.
16- Provide letter from engineer certifing drainage ways and basins.
17- Have engineer address discrepancy in elavations for west basin spillway.
21- Complete inlet in basin on east side.
22- Complete inlet in basin on west side.
23- Complete outlet in basin on east side.
24- Complete outlet in basin on west side.
25- Repair curb on east basin inlet.
28- Install bleeder pipes in both basins. Per approved plans.
From grading punch list.
05/31/2006 STORMWATER FOLLOW-UP INSP Partial Approval Clean parking lot. Reinstall protection in outlet wier.
05/15/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor continues to work on punch list.
05/01/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to reinstall wattle around basins and sweep parking lot.
04/19/2006 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Brent in regards to:
1- Perk test will be needed on both basins. Contractor continues to wash out concrete in basins.
2- Clean streets and parking lot.
3- Complete basins inlets and outlets.
4- Finish all basin work.
03/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor cleaned up wash out and installed BMPs around stockpile.
03/16/2006 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to:
1- Clean street north side of project.
2- Install a wash out area for subs and ensure they use it.
03/02/2006 STORMWATER FOLLOW-UP INSP Partial Approval Talked to Brent site super:
1- H.C. ramps on eastside of building not installed per approved plan. Brent said they will be redone.
2- Subs not using proper wash out area. Brent to talk to sub and start clean up.
3- Mason forgot to install wier opening in block wall for detention basin. Brent said masons will be back and will have the wier installed.
4- I also explained to Brent truncated domes will be required on all H.C. ramps.
02/13/2006 STORMWATER FOLLOW-UP INSP Partial Approval Controls in good condition. Need to expand construction entrance and rip rap basin walls.
01/30/2006 STORMWATER FOLLOW-UP INSP Partial Approval Contractor removed stock pile for basin.
01/17/2006 STORMWATER FOLLOW-UP INSP Partial Approval Scuppers not installed per city detail 204. Brent site super to get more information from engineer.
Contractor needs to remove dirt stockpile in detention basin.
12/28/2005 STORMWATER FOLLOW-UP INSP Partial Approval Spoke to contractor in regards to roof drainage. Explained to contractor water from roof drains need to be scuppered under sidewalk.
12/12/2005 STORMWATER FOLLOW-UP INSP Partial Approval Brent new site super Cell#940-2982. Contractor needs to maintain 2' set back nexk to waddle on west side. Also talked to Brent in regards to pre-con info. and barrier needed around basins.
11/21/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor has been grading area around building. Has not started basin on eastside of building. Contractor has started basin on westside of building. Spoil pile covering waddle on westside. Spoke to property owner in regards to this.
11/07/2005 STORMWATER FOLLOW-UP INSP Partial Approval No concerns at this time.
Copy of Stormwater Ordinance given to Chris site super.
10/24/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor installed waddle on north and eastside of property. Also replacing gravel ramp at entrance with cold patch. Super told best would be back on site on 11-7-05 to finish grading.
10/10/2005 STORMWATER FOLLOW-UP INSP Correction Required Contractor still needs to extend stormwater contols eastside of property. Also need to maintain gravel entrance. Gravel spilling out into roadway.
Discussed with new super the possible need of fencing around detention basins (2) if contractor exceeds the 4 to 1 limit. Also noted with the super that stormwater controls may be needed on the northside of the property. Starting to get silt in street.
09/26/2005 STORMWATER FOLLOW-UP INSP Partial Approval Contractor still needs to extend waddle on eastside of property. Contractor is cleaning street on eastside of property.
09/13/2005 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Carl Martin (940-3361) at 1325 hours. In regards to run off on the eastside of property. Carl said he had seen the run off and was going to extend the waddle and clean up the run off that was on the street. Contractor will re-schedule an inspection or I will inspect it on next site visit.
09/12/2005 STORMWATER FOLLOW-UP INSP Correction Required No one on site at this time. Contractor completed building pad.
Contractor needs to extend waddle on eastside of property. Silt run off.