| 07/12/2006 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 08/24/2005 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | Completed pre-construction meeting with Carl site super. Contractor installing stormwater controls, per SWPPP plan. | |
| 08/23/2005 | ENGINEERING PRE-CONSTRUCTION | Correction Required | Site has been graded with no stormwater controls installed. Pre-con re-scheduled for 8-24-05 at 0830. |