Permit: T05BU00303
Permit Details
Apply Date:
02/10/2005
Applicant:
DOWL ENGINEERS
Description:
GRADING:4000 CY CUT & 14000 CY FILL
Contractors:
- T A-WALLICK LLC C*
Permit Reviews
Permit Number - T05BU00303
Permit Status: Si_xpire
Permit Description: GRADING:4000 CY CUT & 14000 CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/23/2007 | REVISION - GRADING | 01/26/2007 | COMPLETED |
02/10/2005 | PLANS OK TO SUBMIT - GRADING | 02/10/2005 | COMPLETED |
02/10/2005 | GRADING | 03/23/2005 | COMPLETED |
04/04/2005 | RESUBMITTAL - GRADING ALL | 05/17/2005 | COMPLETED |
05/17/2005 | RESUBMITTAL - GRADING | 09/20/2006 | COMPLETED |
09/20/2006 | REVISION - GRADING | 11/21/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU00303
Permit Status: Si_xpire
Permit Description: GRADING:4000 CY CUT & 14000 CY FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/10/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Si_xpire
Permit Number: T05BU00303
Permit Description: GRADING:4000 CY CUT & 14000 CY FILL
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2007 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | Completed pre-con meeting. |
03/08/2007 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | Controls installed. |
12/04/2007 | GRADING - FINAL | MAVERY | Approved | Contractor needs to address preliminary punch list: 1. Provide letter from engineer in regards to drainage, per chapter XIV, section 14.2 (7). 2. Clean all streets and parking areas. 3. Stabilize all areas disturbed by construction. (on and off site) 4. Install rip rap at all curb cuts. (DG washing out in to roadway) 5. Complete all landscaping. 6. Install splash pad at all roof drains. 7. Complete all basin work per approved plan. Have all changes approved at 201 N. Stone Ave. 8. Engineer needs to address basin discharge. (erosion to neighbors property) 9. Separate all construction activity from public access. 10. Remove port-a-pottys, dumpster and mini mobile storage units from site. (Contractor can obtain permit for mini mobile units. Must have permit before final inspection.) 11. Complete all sidewalk work. 12. Remove construction debris from site, drainage channels and from around perimeter wall. 13. Paint bollards in trash enclosure. 14. Address ponding water in parking area. (northeast corner) 15. Complete all parking lot striping and signage installation. 16. Install safety barrier for detention basin. 17. Install bike parking. 18. Clean all wash out from around site. 19. Engineer needs to address ponding water at southeast inlet. (6+") |
12/18/2007 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved | Contractor needs to clean streets. Contractor still working on punch list. |
02/21/2008 | LANDSCAPE INSPECTION | ACONNOR | Approved | |
02/21/2008 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
08/18/2008 | PERMIT FINALED | LJACKSON | Approved |