Permit: T05BU00303

Parcel: 12005275A


Addresses:

4654 S 16TH AV


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T05BU00303

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
02/04/2008 STORMWATER FOLLOW-UP INSP Approved All areas stabilized.
12/18/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to clean streets. Contractor still working on punch list.
11/27/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor placing concrete for basin inlet. Per approved detail.
09/27/2007 STORMWATER FOLLOW-UP INSP Correction Required Spoke to Wolf in regards to:
1- Wash out around site.
2- Sweeping streets.
3- Stabilizing area around perimeter wall.
08/08/2007 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor needs to address:
1- Clean track out off street.
2- Prpair/replace SWPPP controls around project.
Contractor has 5 days to address items. If not sddressed I will issue a notive of violation. Sopke to Wolf site super in regards to items.
08/08/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean track out from site.
06/26/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to repair wattle around site. Stakes pulled out and buired.
05/10/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean track out from site. 2nd. notice.
04/30/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to keep track out cleaned off street.
04/19/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to clean track out from site.
04/12/2007 STORMWATER FOLLOW-UP INSP Partial Approval Contractor needs to:
1- Uncover wattle on west side of project.
2- Re-install controls on northwest corner.
3- Stormwater Pipe needs to be installed per Standard Detail (SD) #108 and complete compaction test on fill.
Spoke to Wolf site super inregards to issues. Wolf to meet with engineer on Monday 4/16/07 to discuss stormwater piping. If contractor not going to follow SD 108, engineer will need to provide details of pipe installation.
03/09/2007 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to control track out from site. Contractor tracking from site to Irvington Rd. If contractor does not clean up track out will issue stop work order until street is clean. Spoke to "Wolf" site super.