Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU00303
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/04/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
12/18/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to clean streets. Contractor still working on punch list. | |
11/27/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor placing concrete for basin inlet. Per approved detail. | |
09/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Spoke to Wolf in regards to: 1- Wash out around site. 2- Sweeping streets. 3- Stabilizing area around perimeter wall. |
|
08/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor needs to address: 1- Clean track out off street. 2- Prpair/replace SWPPP controls around project. Contractor has 5 days to address items. If not sddressed I will issue a notive of violation. Sopke to Wolf site super in regards to items. |
|
08/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean track out from site. | |
06/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair wattle around site. Stakes pulled out and buired. | |
05/10/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean track out from site. 2nd. notice. | |
04/30/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to keep track out cleaned off street. | |
04/19/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean track out from site. | |
04/12/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Uncover wattle on west side of project. 2- Re-install controls on northwest corner. 3- Stormwater Pipe needs to be installed per Standard Detail (SD) #108 and complete compaction test on fill. Spoke to Wolf site super inregards to issues. Wolf to meet with engineer on Monday 4/16/07 to discuss stormwater piping. If contractor not going to follow SD 108, engineer will need to provide details of pipe installation. |
|
03/09/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to control track out from site. Contractor tracking from site to Irvington Rd. If contractor does not clean up track out will issue stop work order until street is clean. Spoke to "Wolf" site super. |