Permit: T05BU00129
Permit Details
Apply Date:
01/19/2005
Applicant:
TRANSMARK COMPANY
Description:
GRADING:5933CY CUT & 33CY FILL
Contractors:
- MAGNUM PAVING INC ,
Permit Reviews
Permit Number - T05BU00129
Permit Status: Final
Permit Description: GRADING:5933CY CUT & 33CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/19/2005 | PLANS OK TO SUBMIT - GRADING | 01/19/2005 | COMPLETED |
01/19/2005 | GRADING | 03/01/2005 | COMPLETED |
03/11/2005 | RESUBMITTAL - GRADING ALL | 04/26/2005 | COMPLETED |
11/01/2007 | REVISION - GRADING | 11/01/2007 | COMPLETED |
11/01/2007 | REVISION - GRADING | 11/14/2007 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T05BU00129
Permit Status: Final
Permit Description: GRADING:5933CY CUT & 33CY FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/19/2005 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T05BU00129
Permit Description: GRADING:5933CY CUT & 33CY FILL
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2005 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | |
07/07/2005 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | |
12/15/2006 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | 1) CONTINUE TO MAINTAIN STORM WATER CONTROLS IN PLACE UNTIL SITE IS STABILIZED. 2) SWEEP UP TRACKED MATERIAL OFF OF PARKING LOT. 3) PROVIDE AND USE A DESIGNATED CONCRETE WASH OUT ON SITE PER YOUR STORM WATER PLAN. 4) ANY CHANGES MADE TO THE APPROVED GRADING/SITE PLAN MUST BE REVISED BY THE ENGINEER OF RECORD AND APPROVED BY THE CITY OF TUCSON. |
09/18/2007 | GRADING - FINAL | MRUSSO | Approved | FINAL GRADING APPROVED, PER THE REVISED DRAWING SHOWING THE CHANGES MADE TO THE DRAINAGE CHANNEL ALONG THE NORTH SIDE OF THE BLDG BEING APPROVED BY THE REVIEW ENGINEER. ALL OTHER GRADING ISSUES HAVE BEEN ADDRESSED. |
09/18/2007 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
05/14/2020 | LANDSCAPE INSPECTION | DROBERTS | Approved |