Permit: T05BU00129


Addresses:

4299 N CAMPBELL AV


Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Permit Number - T05BU00129

Inspection Description - ENGINEERING PRE-CONSTRUCTION

Inspection Status - Approved

Date Description Inspector Results Comments
01/11/2007 ENGINEERING PRE-CONSTRUCTION Approved
03/21/2006 ENGINEERING PRE-CONSTRUCTION Partial Approval NO ACTIVITY ON SITE, TOOK PICS OF FINISHED OUT FALL.
06/14/2005 ENGINEERING PRE-CONSTRUCTION Approved
06/10/2005 ENGINEERING PRE-CONSTRUCTION Cancelled RESCHEDULE FOR JUNE 13, 2005
06/03/2005 ENGINEERING PRE-CONSTRUCTION Correction Required ITEMS THAT NEED TO BE ADDRESSED AS PRESCRIBED IN THE APPROVED STORM WATER POLLUTION PREVENTION PLAN (SWPPP) :
1) PRIOR TO CLEARING, AND GRUBBING FOR BLDG PADS, PAALS, AND DRAINAGE CHANNELS, EROSION AND SEDIMENT CONTROLS MUST BE INSTALLED AND INSPECTED.
2) AN APPROVED SWPPP MUST BE ON SITE DURING CONSTRUCTION.
3) CONTRACTOR MUST CONTACT DEVELOPMENT SERVICES, ENGINEERING SECTION ( MIKE RUSSO 240-9859) TO SCHEDULE A PRE-CONSTRUCTION INSPECTION TO ADDRESS PROPER INSTALLATION OF SEDIMENT CONTROLS AND OTHER REQUIREMENTS PRESCRIBED BY THE APPROVED SWPPP.

THE ABOVE LISTED ITEMS MUST BE COMPLETED IMMEDIATELY OTHERWISE A STOP WORK ORDER WILL BE ISSUED FOR THE SITE BY THE CITY OF TUCSON, DEVELOPMENT SERVICES DEPARTMENT.
06/01/2005 ENGINEERING PRE-CONSTRUCTION Not ready for Inspection SOME GRADING AND STOCKPILING ON SITE. NO ONE ON SITE TO MAKE CONTACT WITH. CONTACTED APPLICANT (615-9262) SITE SUPERINTENDENT WILL BE BACK NEXT THURSDAY 6/9/05. WILL SCHEDULE PRE-CON MEETING FOR 6/10/05.
06/01/2005 ENGINEERING PRE-CONSTRUCTION Correction Required GRADING WORK BEING ACCOMPLISHED ON SITE, SPOKE WITH CONTRACTOR (MAGNUM PAVING - JOHN MCDONALD), HE STATED THAT WORK HAS BEEN GOING ON FOR ABOUT ONE WEEK. APPROVED GRADING PLAN WAS ON SITE HOWEVER; THE FOLLOWING ITEMS NEED TO BE ADDRESSED:
1) AN APPROVED COPY OF THE SWPPP MUST BE ON SITE
2) ALL STORM WATER CONTROLS MUST BE INSTALLED AS SHOWN ON THE APPROVED SWPPP.
3) A STABILIZED CONSTRUCTION ENTRANCE MUST BE INSTALLED
4) GRADING LIMITS FOR THE SITE MUST BE CLEARLY IDENTIFIED AND SITE ACTIVITY MUST STAY WITHIN THOSE LIMITS.
5) CONTRACTOR MUST CONTACT DEVELOPMENT SERVICES, ENGINEERING (MIKE RUSSO - 240-9589) TO SCHEDULE A PRE-CONSTRUCTION MEETING TO ADDRESS PROPER INSTALLATION OF STORM WATER CONTROLS AND OTHER REQUIREMENTS PRESCRIBED BY THE APPROVED SWPPP.
THE CONTRACTOR AND/OR OWNER WILL BE CONTACTED TO NOTIFY THEM OF THE ABOVE LISTED CORRECTIONS.