Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T05BU00129
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/11/2007 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
03/21/2006 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | NO ACTIVITY ON SITE, TOOK PICS OF FINISHED OUT FALL. | |
06/14/2005 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
06/10/2005 | ENGINEERING PRE-CONSTRUCTION | Cancelled | RESCHEDULE FOR JUNE 13, 2005 | |
06/03/2005 | ENGINEERING PRE-CONSTRUCTION | Correction Required | ITEMS THAT NEED TO BE ADDRESSED AS PRESCRIBED IN THE APPROVED STORM WATER POLLUTION PREVENTION PLAN (SWPPP) : 1) PRIOR TO CLEARING, AND GRUBBING FOR BLDG PADS, PAALS, AND DRAINAGE CHANNELS, EROSION AND SEDIMENT CONTROLS MUST BE INSTALLED AND INSPECTED. 2) AN APPROVED SWPPP MUST BE ON SITE DURING CONSTRUCTION. 3) CONTRACTOR MUST CONTACT DEVELOPMENT SERVICES, ENGINEERING SECTION ( MIKE RUSSO 240-9859) TO SCHEDULE A PRE-CONSTRUCTION INSPECTION TO ADDRESS PROPER INSTALLATION OF SEDIMENT CONTROLS AND OTHER REQUIREMENTS PRESCRIBED BY THE APPROVED SWPPP. THE ABOVE LISTED ITEMS MUST BE COMPLETED IMMEDIATELY OTHERWISE A STOP WORK ORDER WILL BE ISSUED FOR THE SITE BY THE CITY OF TUCSON, DEVELOPMENT SERVICES DEPARTMENT. |
|
06/01/2005 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | SOME GRADING AND STOCKPILING ON SITE. NO ONE ON SITE TO MAKE CONTACT WITH. CONTACTED APPLICANT (615-9262) SITE SUPERINTENDENT WILL BE BACK NEXT THURSDAY 6/9/05. WILL SCHEDULE PRE-CON MEETING FOR 6/10/05. | |
06/01/2005 | ENGINEERING PRE-CONSTRUCTION | Correction Required | GRADING WORK BEING ACCOMPLISHED ON SITE, SPOKE WITH CONTRACTOR (MAGNUM PAVING - JOHN MCDONALD), HE STATED THAT WORK HAS BEEN GOING ON FOR ABOUT ONE WEEK. APPROVED GRADING PLAN WAS ON SITE HOWEVER; THE FOLLOWING ITEMS NEED TO BE ADDRESSED: 1) AN APPROVED COPY OF THE SWPPP MUST BE ON SITE 2) ALL STORM WATER CONTROLS MUST BE INSTALLED AS SHOWN ON THE APPROVED SWPPP. 3) A STABILIZED CONSTRUCTION ENTRANCE MUST BE INSTALLED 4) GRADING LIMITS FOR THE SITE MUST BE CLEARLY IDENTIFIED AND SITE ACTIVITY MUST STAY WITHIN THOSE LIMITS. 5) CONTRACTOR MUST CONTACT DEVELOPMENT SERVICES, ENGINEERING (MIKE RUSSO - 240-9589) TO SCHEDULE A PRE-CONSTRUCTION MEETING TO ADDRESS PROPER INSTALLATION OF STORM WATER CONTROLS AND OTHER REQUIREMENTS PRESCRIBED BY THE APPROVED SWPPP. THE CONTRACTOR AND/OR OWNER WILL BE CONTACTED TO NOTIFY THEM OF THE ABOVE LISTED CORRECTIONS. |