Permit: T04CM04907
Permit Details
Apply Date:
11/08/2004
Applicant:
VENTURE VIEW BUILDERS L L C
Description:
DUPLEX:TD#16-03-86
Contractors:
- VENTURE VIEW BUILDERS L L C
Permit Reviews
Permit Number - T04CM04907
Permit Status: Final
Permit Description: DUPLEX:TD#16-03-86
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2005 | REVISION | 01/05/2005 | COMPLETED |
| 11/08/2004 | RESIDENTIAL BLDG-MODEL PLAN/ENGINE/WALK THRU | 11/12/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04CM04907
Permit Status: Final
Permit Description: DUPLEX:TD#16-03-86
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/08/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04CM04907
Permit Description: DUPLEX:TD#16-03-86
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2005 | ELECTRIC - UFER | RSUBA | Approved | IVRS - Inspection :* NOTE: ELEC CONCRETE I TIGHTENED CLAMP FOR YOU. MAKE SURE ITS TIGHT AT NEXT DUPLEX UFER OK? |
| 01/14/2005 | BUILDING PRE-SLAB | LHANLY | Approved | IVRS - Inspection :*APPROVED-IN THE FUTURE-(1) KEEP ALL SPECIAL INSPECTION FIELD REPORTS ON SITE WITH C.O.T. REPORTS. (2) KEEP TENDONS AS STRAIGHT AS |
| 01/14/2005 | EXCAVATION/LAYOUT REBAR & ZON | LHANLY | Approved | IVRS - Inspection :*APPROVED-IN THE FUTURE-(1) KEEP ALL SPECIAL INSPECTION FIELD REPORTS ON SITE WITH C.O.T. REPORTS. (2) KEEP TENDONS AS STRAIGHT AS POSSIBLE. THEY SHOULD ONLY CURVE (WOBBLE) AROUND OPENINGS, PIPES, ETC. |
| 01/14/2005 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :*/PIPE WRAPS ON PLUMBING OK. HOT & COLD LOOP TO KITCHEN OK. |
| 01/14/2005 | PLUMBING - ROUGH, SOIL | RRICH | Approved | IVRS - Inspection :* |
| 02/16/2005 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* INSTALLATION OF SUB METERS CONNECTION TO MAIN AND BUILDING ( 2) LOCATIONS OK. |
| 02/23/2005 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection :* OK FOR SHEET ROCK |
| 02/23/2005 | ELECTRIC - CABLE DROP | RSUBA | Approved | IVRS - Inspection :* 1) OK TO CLEAR CABLE DROP |
| 02/24/2005 | TEP CLEARANCE - AM | RMAJUTA | Approved | OK CD ONLY 1,2 PER SUBA |
| 03/01/2005 | EXT METAL CLIPS/EXT SHEATHING | BSTEVENS | Approved | IVRS - Inspection :* 1) INSTALL ROOF AND CRICKET VENTS PER PLAN OR HAVE PLAN REVISED AND APPROVED ASBUILT 2) IS DBL BLOCKING INSTALLED AS SHOWN IN DETAIL 2/SD-3 ? 3) FRAMING APPROVAL WITHELD PENDING PLUMBING INTERMEDIATE APPROVAL |
| 03/01/2005 | ELECTRIC - TEMPORARY SERVICE | RSUBA | Approved | IVRS - Inspection :* |
| 03/01/2005 | ELECTRIC - INTERMEDIATE | RSUBA | Approved | IVRS - Inspection :* |
| 03/02/2005 | PLUMBING - INTERMEDIATE | RRICH | Approved | IVRS - Inspection :* |
| 03/10/2005 | STUCCO MESH | LHANLY | Approved | IVRS - Inspection :* APPROVED |
| 03/10/2005 | FRAMING | LHANLY | Approved | IVRS - Inspection :* |
| 03/23/2005 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection :* APPROVED |
| 05/03/2005 | ELECTRIC - FINAL | RMAJUTA | Approved | IVRS - Inspection :* |
| 05/03/2005 | U VALUE FOR WINDOW | LHANLY | Approved | IVRS - Inspection :* |
| 05/03/2005 | ROOF NAILING | LHANLY | Approved | IVRS - Inspection :* |
| 05/06/2005 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BE MADE 2) OK FOR FINAL |
| 05/06/2005 | PLUMBING - GAS PRESSURE TEST | LHANLY | Approved | |
| 05/06/2005 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 05/06/2005 | PLUMBING - FINAL | LHANLY | Approved | IVRS - Inspection :* |
| 11/21/2005 | PERMIT FINALED | LHANLY | Approved |