Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
6964 E 22ND ST
Apply Date:
09/29/2004
Applicant:
ERIK BERLIN
Description:
NEW:RETAIL KIOSK
Contractors:
  • PECOS DEVELOPMENT INC ,

Permit Reviews

Permit Number - T04CM04355
Permit Status: Final
Permit Description: NEW:RETAIL KIOSK
Start Date Submittal Complete Date Status  
09/29/2004 PLANS OK TO SUBMIT - COMM 10/13/2004 COMPLETED Review Details
10/13/2004 3RD PARTY REVIEW-COMMERCIAL TI 11/08/2004 COMPLETED Review Details
11/08/2004 POST 3RD PARTY REVIEW 11/09/2004 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04CM04355
Permit Status: Final
Permit Description: NEW:RETAIL KIOSK
Total Outstanding Activity Conditions - 1
Date Name
09/29/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04CM04355
Permit Description: NEW:RETAIL KIOSK
Total Completed Inspections - 34
Date Description Inspector Results Comments
11/22/2004 EXCAVATION/LAYOUT REBAR & ZON LHANLY Approved IVRS - Inspection :REVISE DETAIL 201/S1 AND GSN 3-A
01/20/2005 FRAMING LHANLY Approved IVRS - Inspection :*
01/20/2005 ROOF NAILING LHANLY Approved IVRS - Inspection :*
01/20/2005 EXT METAL CLIPS/EXT SHEATHING LHANLY Approved IVRS - Inspection :*
01/21/2005 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :* 1) PROVIDE AIR OR WATER TEST ON WASTE ?? THRU ROOF. 2) PROVIDE AIR OR WATER TEST ON H20 PIPING. 3) HAVE YOUR APPROVED PLAN AND YELLOW PERMIT CARD ON SITE AT TIME OF REINSPECTION. 4) SECURE PIPING ( VENT ) WITH APPROVED CLAMP OR HANGER. PLUMBER TAPE IS NOT APPROVED HANGER MATERIAL. 5) INSTALL CLOSET RING FOR VIEWING
01/21/2005 ELECTRIC - ABOVE CEILING RSUBA Approved IVRS - Inspection :**APPROVED
01/21/2005 ELECTRIC - INTERMEDIATE RSUBA Approved IVRS - Inspection :**APPROVED
01/21/2005 PLUMBING - ROUGH, SOIL RRICH Approved IVRS - Inspection :*
01/21/2005 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
01/21/2005 PLUMBING - INTERMEDIATE RRICH Approved IVRS - Inspection :*
01/21/2005 PLUMBING - ABOVE CEILING RRICH Approved IVRS - Inspection :*
01/24/2005 STUCCO MESH LHANLY Approved IVRS - Inspection :*
03/28/2005 PLUMBING - SEWER HCS CONNECT RRICH Approved IVRS - Inspection :*
1) WATER TEST FROM BLDG THRU 2-WAY CLEANOUT TO SEWER CONNECTION OK
03/29/2005 ELECTRIC - CABLE DROP RSUBA Approved IVRS - Inspection :* OK TO CLEAR
03/29/2005 TEP CLEARANCE - AM JKOZUCH Approved CEC
04/01/2005 ELECTRIC - UFER RSUBA Approved
04/01/2005 ELECTRIC - FINAL RSUBA Approved IVRS - Inspection :* OK TO CLEAR FUEL & TEST. POWER ( BOND WAS ALREADY POSTED 0
04/01/2005 TEP CLEARANCE - PM JKOZUCH Approved ECO PER BOB SUBA
04/04/2005 ELECTRIC - TEMP POWER FOR TEST RSUBA Approved IVRS - Inspection :*APPROVED
04/04/2005 PLUMBING - ROOF DRAINS RRICH Approved
04/04/2005 PLUMBING - FINAL RRICH Approved IVRS - Inspection :* (1) BACKFLOW CERTIFICATION TURNED IN
04/04/2005 BUILDING PRE-SLAB LHANLY Approved IVRS - Inspection :*
04/04/2005 BUILDING ABOVE CEILING LHANLY Approved IVRS - Inspection :*
04/04/2005 SHEET ROCK NAILING LHANLY Approved IVRS - Inspection :*
04/04/2005 PLUMBING - YARD WTR LINE/TEST RRICH Approved IVRS - Inspection :*
04/05/2005 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection :* OK FOR FINAL C OF O
04/05/2005 MECHANICAL - ABOVE CEILING JMILITEL Approved IVRS - Inspection :*
04/05/2005 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*
04/05/2005 FIRE - FINAL LTHOMAS Approved
04/05/2005 RIGHT OF WAY - FINAL DLEE Approved
04/07/2005 U VALUE FOR WINDOW LHANLY Approved
04/07/2005 BUILDING - FINAL LHANLY Approved IVRS - Inspection :* PUT UP YOUR ADDRESS #S
10/25/2015 ENGINEERING - FINAL DROBERTS Approved
10/25/2015 SIGN - FINAL DROBERTS Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW