Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2015 | ENGINEERING - FINAL | Approved | ||
| 02/08/2012 | ENGINEERING - FINAL | Partial Approval | PLANS NOT AVAILABLE AT THIS TIME. PROVIDE ALL ORIGINALLY APPROVED DOCUMENTS FOR THIS SITE WHEN YOU CALL IN FOR THE FINAL INSPECTION FOR THIS SITE. COMPLETE ALL OTHER OUTSTANDING INSPECTIONS ALSO ON THIS SITE. | |
| 02/08/2012 | ENGINEERING - FINAL | Partial Approval | THIS SITE WAS CHECKED TO SEE IF IT WAS COMPLETED PER THE APPROVED PLANS. CURRENTLY THE SITE LOOKS TO BE ACCEPTABLE IN REGARDS TO THE BUILDING LOCATION, BUT THE LANDSCAPING DOES NOT MATCH THE APPROVED PLANS. INSTALL ALL OF THE MISSING ITEMS ON THIS SITE(2 TEREES) AND THEN RECALL THE INSPECTION FOR ENGINEERING. | |
| 04/05/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. SITE NOT READY FOR INSPECTION. SIDEWALK AND CURB NEED TO BE COMPLETED. |