Permit Details

Status:
C of o
Type:
SINGLE FAMILY NEW
Address NEW:
1001 E 17TH ST BLDG #1
Apply Date:
02/05/2004
Applicant:
PAULUS, ROBERT FRANCIS
Description:
NEW:CONDOMINUIMS #101-131 201-216 230 231
Contractors:
  • CALIBER WEST L L C

Permit Reviews

Permit Number - T04CM00533
Permit Status: C of o
Permit Description: NEW:CONDOMINUIMS #101-131 201-216 230 231
Start Date Submittal Complete Date Status  
02/05/2004 PLANS OK TO SUBMIT - 3RD PARTY 02/05/2004 COMPLETED Review Details
02/05/2004 3RD PARTY REVIEW-COMMERCIAL TI 02/18/2004 COMPLETED Review Details
03/08/2004 3RD PARTY REVIEW-COMMERCIAL 03/30/2004 COMPLETED Review Details
05/11/2004 3RD PARTY REVIEW-REVISION/OTHER 06/01/2004 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T04CM00533
Permit Description: NEW:CONDOMINUIMS #101-131 201-216 230 231
Total Completed Inspections - 44
Date Description Inspector Results Comments
06/24/2004 PLUMBING - ROUGH, SOIL TRINIVJR Approved IVRS - Inspection :*
07/09/2004 EXCAVATION/LAYOUT REBAR & ZON AMATHIES Approved IVRS - Inspection :*
07/13/2004 PLUMBING - ROOF DRAINS RRICH Approved IVRS - Inspection :*/ 1) 6" BLDG SEWER STUBBED 2' OUTSIDE BLDG 6" BLDG DRAIN UNDERGROUND BACK TO WASTE AND VENT ONLY FOR 110, 111, 112, 113, 114, 115, 116, 111B, 113B AND 115B WATER TEST OK 2) NEED TO SEE 2-WAY BLDG CLEANOUT INSTALLATION 3) 6" RWL + 4" RWL UNDERGROUND WATER TEST TO 2" OUTSIDE BLDG BETWEEN CENTER LINE 6+7 AND SOUTH OF UNIT 111 OK 4) 4" RWL UNDERGROUND WATER TEST TO 2' OUTSIDE BLDG BETWEEN CENTER LINE 8+11 SOUTH OF 113+115 OK
08/11/2004 REINFORCED MASONRY PRE-GROUT AMATHIES Approved IVRS - Inspection :*
08/18/2004 BUILDING PRE-SLAB AMATHIES Approved IVRS - Inspection :*/ 1) ENTRY STEPS
08/26/2004 STEM WALL/RETAINING WALL AMATHIES Approved IVRS - Inspection :*
08/31/2004 PLUMBING - PROGRESS TRINIVJR Approved IVRS - Inspection :SOIL WATER TEST IS OK
WASTE AND VENT SYSTEM IS OK
THIS INSPECTION FOR WASTE AND VENT ONLY
10/26/2004 ROOF NAILING AMATHIES Approved IVRS - Inspection :*/ 1) "D" BLDG OK
10/27/2004 PLUMBING - ABOVE CEILING TRINIVJR Approved IVRS - Inspection :*
11/02/2004 ELECTRIC - UNDERGROUND DSANTACR Approved IVRS - Inspection :*/OK U.G. SECONDARYS & COMM CONDUITS AT SOUTH OF BLD #1
11/10/2004 ELECTRIC - ABOVE CEILING RMAJUTA Approved 1) UNIT 124, 125, 126 AND 127 BLDG E
11/10/2004 BUILDING ABOVE CEILING AMATHIES Approved IVRS - Inspection :*
11/10/2004 PLUMBING - SEWER HCS CONNECT TRINIVJR Approved IVRS - Inspection :*
11/17/2004 PLUMBING - YARD WTR LINE/TEST TRINIVJR Approved IVRS - Inspection :*/1)AIR PRESSURE TEST IS OK. 2)YARD WATER LINE IS OK AS NOTED ON PLAN 3)OK TO BACKFILL TRENCH
11/24/2004 EXT METAL CLIPS/EXT SHEATHING AMATHIES Approved IVRS - Inspection :*/ 1) SECTION "C"
12/10/2004 STUCCO MESH AMATHIES Approved
12/17/2004 ELECTRIC - TEMP POWER FOR TEST DSANTACR Approved
12/20/2004 PLUMBING - INTERMEDIATE IVR USER Approved IVRS - AP canceled/1)PROVIDE CORRECT FALL ON ALL DRAINAGE PIPING 1/4" PER FOOT 2)PROVIDE 2 PIPE DIAMETORS AT SANTEE TO P-TRAP CONNECTION 3)CORRECT LEAK IN DWV PIPING. 4)PROVIDE IN WRITTING OR CORRECT NOTCHING AND OVERSIZE HOLE IN FLOOR JOIST. (3RD FLOOR CEILING, 4TH FLOOR AT REST ROOM AREA) NOT A COMPLETE LIST
12/20/2004 ELECTRIC - PROGRESS DSANTACR Approved IVRS - Inspection :*
1) OK TO CLEAR HOUSE PANEL HP1 SUBJECT TO BOND POSTING-TEMP POWER FOR TEST
12/21/2004 ELECTRIC - INTERMEDIATE DSANTACR Approved IVRS - Inspection :*PARTIAL APPROVAL. OK WALLS AND CEILINGS BLD. #1 "B" 3RD AND 4TH LEVEL.
12/21/2004 SHEET ROCK NAILING AMATHIES Approved IVRS - Inspection :*
12/21/2004 FRAMING AMATHIES Approved IVRS - Inspection :*
12/23/2004 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection :*/BLDG B 3RD & 4TH FLOOR OK FOR SHEET ROCK. PROVIDE PLATE STRAPS PRIOR TO SHEET ROCK
03/03/2005 FIRE - ALARM FINAL LTHOMAS Approved
03/03/2005 FIRE SPKLR - OH PIPING & HYDRO LTHOMAS Approved
03/03/2005 FIRE SPKLR - UG PIPING FLUSH LTHOMAS Approved
03/03/2005 FIRE SPKLR - UG, PIPING, HYDRO LTHOMAS Approved
03/04/2005 FIRE - FINAL LTHOMAS Approved
03/04/2005 FIRE SPKLR - FINAL LTHOMAS Approved
03/09/2005 SIGN - FINAL JYBARRA Approved IVRS - Inspection :*
03/31/2005 ENGINEERING - FINAL DROBERTS Approved
03/31/2005 RIGHT OF WAY - FINAL THARVISO Approved
03/31/2005 LANDSCAPE - FINAL ACONNOR Approved
03/31/2005 LANDSCAPE - FINAL ACONNOR Approved
04/05/2005 TEP CLEARANCE - AM JKOZUCH Approved ECO 121 BLD 1
04/11/2005 ELECTRIC - UFER DSANTACR Approved
04/11/2005 ELECTRIC - FINAL DSANTACR Approved IVRS - Inspection :*
04/12/2005 MECHANICAL - PROGRESS CWILLIAM Approved
04/12/2005 MECHANICAL - FINAL CWILLIAM Approved IVRS - Inspection :*
04/14/2005 PLUMBING - FINAL TRINIVJR Approved IVRS - Inspection :* 1) PLBG. FINAL IS OK FOR UNITS # 102, 113. THIS COMPLETES FINAL FOR ALL OF BLDG 1 2) OK FOR C OF O
04/14/2005 U VALUE FOR WINDOW AMATHIES Approved
04/14/2005 BUILDING - PROGRESS AMATHIES Approved
04/14/2005 BUILDING - FINAL AMATHIES Approved IVRS - Inspection :*
04/14/2005 NPPO - FINAL ACONNOR Approved