Permit: T04BU02332
Permit Details
Apply Date:
09/21/2004
Applicant:
WLB GROUP
Description:
GRADING:0 CY CUT/0 CY FILL PHASE III
Contractors:
- H F H TUCSON
Outstanding Activity Conditions
Permit Number - T04BU02332
Permit Status: Issued
Permit Description: GRADING:0 CY CUT/0 CY FILL PHASE III
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/30/2008 | The following 21 conditions ply to permits T04BU02332, T04BU01206, and T04OT01698: 1) SPECIAL INSPECTION REQUIRED FOR FILL FOR BASINS WITH OVER-EXCAVATION, TOEDOWN STRUCTURES, SPILLWAY, AND WEIR CONSTRUCTION. 2) CALL FOR SPECIAL, INTERMEDIATE AND FINAL INSPECTIONS. FOR A DSD ENGINEERING INSPECTION, CALL IVR (740-6970), OR CONTACT DSD ENGINEERING AT 837-4888, OR SCHEDULE INSPECTIONS ONLINE AT: HTTP://WWW.CI.TUCSON.AZ.US/DSD/ONLINE_SERVICES/ONLINE_PERMITS/ONLINE_PERMITS.HTML 3) THE GRADING PLAN SHEETS AND DRAINAGE ADDENDUM ARE FOR THE REVISED GRADING CONSTRUCTION ASSOCIATED WITH DRAINAGEWAY AND BASIN CONSTRUCTION WITHIN THE HABITAT CORAZON PROJECT FOR T04OT01698-R2, T04BU02332-R2 AND T04BU01206-R2, AS SHOWN ON THE ACCEPTED DRAINAGE ADDENDUM #3 SEALED BY MICHAEL R SMITH DATED 4/29/08, AND THE APPROVED GRADING PLAN SHEETS PREPARED BY WLB SEALED BY MICHAEL R. SMITH DATED 4/22/08. THIS REVISION INCLUDES THE OVER EXCAVATION AND REPLACEMENT OF BASIN BOTTOMS PER GEOTECHNICAL RECOMMENDATIONS, AND SPILLWAY CONSTRUCTION, WITH ESTIMATED CUT/FILL 12,835 CUBIC YARDS AND 0.88 TOTAL AREA OF DISTURBANCE. |
| 04/30/2008 | 4) ASSOCIATED GEOTECHNICAL REFERENCE: DRAINAGE BASIN SOIL PROFILE REPORT SEALED BY LYLE TWEET DATED 10/24/07 AND PERCOLATION TEST REPORT DATED 2/6/07. SEE RECOMMENDATIONS FOR OVER-EXCAVATION FOR SOILS AND OTHER GRADING CONSTRUCTION RECOMMENDATIONS IN THE GEOTECHNICAL ENGINEERING REPORT BY LMT ENGINEERING, DATED DECEMBER 23, 2003, AS WELL AS ANY ADDENDA INCLUDING DOCUMENT DATED JULY 7, 2004, AND DRAINAGE BASIN SOIL PROFILE REPORT DATED OCTOBER 24, 2007. 5) A COPY OF THE GRADING PERMIT, NOI, STORMWATER POLLUTION PREVENTION PLAN (SWPPP), GEOTECHNICAL REPORTS AND ADDENDA, GRADING PLAN AND ASSOCIATED REVISED SHEETS SHALL BE KEPT AT THE SITE AT ALL TIMES, UNTIL FINAL GRADING APPROVAL. 6) THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) SHALL BE UPDATED AS NEEDED AND KEPT ON SITE DURING GRADING. TEMPORARY EROSION/STORMWATER CONTROLS MAY BE FIELD ADJUSTED WITH DISCUSSIONS WITH OPERATORS AND ENGINEER OF RECORD AS NECESSARY ALONG DISTURBANCE LIMITS FOR THIS PROJECT. 7) DESIGNATED CONCRETE WASHOUT LOCATIONS ARE REQUIRED AND SHALL NOT BE LOCATED IN OR NEAR THE BASIN OR WATER HARVESTING AREAS. LOCATION OF TEMPORARY MATERIAL OR VEHICLE STAGING / STOCKPILE AREA SHALL BE PLACED WITHIN GRADING LIMITS AND NOT LOCATED IN ANY WATER HARVESTING OR BASIN AREAS. |
| 04/30/2008 | 8) DUST CONTROL METHODS SUCH AS WATER TRUCK WILL BE PROVIDED, AS WELL AS DAILY SWEEPING OF THE STREETS. 9) SEPARATE BUILDING PERMIT APPLICATIONS ARE REQUIRED FOR ANY WALLS. 10) IF GRADING CONSTRUCTION IS EXPECTED TO LAST LONGER THAN THE EXPIRATION DATE OF THE GRADING PERMIT, CONTACT DSD TO RENEW/EXTEND THE GRADING PERMIT. IF FINAL GRADING INSPECTION HAS NOT BEEN COMPLETED BEFORE THE GRADING PERMIT EXPIRES, AND THE PERMIT HAS NOT BEEN RENEWED, ADDITIONAL FEES AND REVIEWS MAY BE REQUIRED. 11) CONTACT PERMITS AND CODES FOR ANY RIGHT-OF-WAY REQUIREMENTS. 12) PER LANDSCAPING, TREE COUNT SHALL REMAIN THE SAME FOR EACH BASIN. COORDINATE WITH DSD LANDSCAPING FOR INSPECTIONS. 13) PRIOR TO REQUEST FOR FINAL INSPECTION APPROVAL, ANY OUTSTANDING FEES SHALL BE PAID. 14) THE PERMITEE SHALL NOTIFY THE DSD WHEN THE GRADING OPERATION IS READY FOR FINAL GRADING INSPECTION. FINAL GRADING APPROVAL SHALL NOT BE GIVEN UNTIL ALL WORK, INCLUDING INSTALLATION OF ALL DRAINAGE IMPROVEMENTS, INCLUDING ANY SCUPPERS, AND THEIR PERMANENT PROTECTIVE DEVICES, AND ALL EROSION CONTROL MEASURES HAVE BEEN COMPLETED, AND ALL CONDITIONS OF PERMIT ARE COMPLETED. 15) ANY REVISION TO THE GRADING PLAN MAY REQUIRE A RE-SUBMITTAL OF A REVISED GRADING PLAN FOR REVIEW. CONTACT DSD ENGINEERING TO DISCUSS CHANGES IN GRADING DESIGN. |
| 04/30/2008 | 16) COORDINATION WITH KB ENGINEER REQUIRED FOR WEIR / DRAINAGEWAY / SPILLWAY COMPLETION. SUBSTANTIAL COMPLETION LETTERS REQUIRED. 17) WEIR OUTLET STRUCTURE ALONG WEST BOUNDARY SHALL BE DISCUSSED WITH THE CITY OF TUCSON DSD ENGINEERING TO ASSURE SHEET FLOW FUNCTION IS PROVIDED. FURTHER REVIEW MAY BE REQUIRED IF WEIR CONSTRUCTION DOES NOT FUNCTION. 18) POST GRADING CONSTRUCTION INSPECTION AS WELL AS ADDITIONAL PERCOLATION TESTING MAY BE REQUIRED. 19) AS-BUILTS MAY BE REQUIRED PRIOR TO FINAL GRADING INSPECTION. 20) PRIOR TO FINAL APPROVAL, AS-BUILTS ARE REQUIRED WITH THE LETTERS OF COMPLETION FOR OVERALL PROJECT. A FINAL DRAINAGE REPORT IS REQUIRED TO BE SUBMTTED PRIOR TO FINAL APPROVAL OF THE PROJECT THAT WILL INCLUDE ROUTING FOR ALL DRAINAGE CONVEYANCE THROUGH THE PROJECT, AND ALL ADDENDA, AND REVISIONS. 21) PRIOR TO REQUEST FOR FINAL GRADING INSPECTION APPROVAL, ALL PERMANENT EROSION CONTROL IMPROVEMENTS SHALL BE INSTALLED AND ACCEPTED BY DSD INCLUDING ROCK / ESTABLISHED REVEGETATION FOR ALL DISTURBED AREAS IF NOT IMPROVED AS PER APPROVED PLAN. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T04BU02332
Permite Description: GRADING:0 CY CUT/0 CY FILL PHASE III
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| STORMWATER FINAL INSPECTION | N/A | Not Inspected | ||
| GRADING - FINAL | N/A | Not Inspected | ||
| 04/12/2005 | STORMWATER INSTALL OF CONTROLS | N/A | Correction Required | Site has been grubbed and graded and rough cut for roads and det/ret basins. Site will be inactive for a while according to one of teh developers. Minor repair is needed for silt-fencing , however silt--fencing remains standing. |
| 10/16/2007 | STORMWATER FOLLOW-UP INSP | N/A | Compliance | AMERICA BUILT TALKED TO JJ. AMERICA BUILT HAS COMPLETED ALL HOMES IN CDP. AMERICA BUILT CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. |
| 12/10/2007 | GRADING - INTERMEDIATE | N/A | Continued | STANDING WATER PICS 2867-2873 |