Permit: T04BU02332

Parcel: 14037066A


Addresses:

7130 S MCKINLEY AV

Inspection Status: Correction Required

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
09/09/2008 STORMWATER FOLLOW-UP INSP Correction Required SITE NEEDS SWEEPING AT ACTIVE LOTS
08/13/2008 STORMWATER FOLLOW-UP INSP Correction Required TALKED TO JJ ONSITE REGARDING TRACK OUT FROM INNOVA=NEEDS TO BE SWEPT
01/08/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO APPRECIABLE STANDING WATER OTHER THAN SE BASIN E OF CMO D L ASPIRACION

SIDEWALK BEING POURED AT VARIOUS LOCATIONS THROUGHOUT SITE
IRRIGATION IN BIG BASIN BEING INSTALLED
10/16/2007 STORMWATER FOLLOW-UP INSP Compliance AMERICA BUILT
TALKED TO JJ. AMERICA BUILT HAS COMPLETED ALL HOMES IN CDP.

AMERICA BUILT
CORRECTION NOTICE ISSUED 7 DAYS

1. REMOVE SEDIMENT FROM STREET
2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED

ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP.
A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11.
10/11/2007 STORMWATER FOLLOW-UP INSP Partial Approval CORRECTIONS MADE
RICHMOND AMERICAN
CORRECTION NOTICE ISSUED 7 DAYS

1. REMOVE SEDIMENT FROM STREET
2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED

ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP.
A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11.

GAVE INSPECTION TO HORUS. HE ADVISED SWEEPER DUE 10/4.
10/11/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS NOT MADE-HAS TIL 10/23 FOR COMPLIANCE-HABITAT FOR HUMANITY TO HAVE MAINTENANCE COMPLETED BY THEN
TJ BEDNAR
CORRECTION NOTICE ISSUED 7 DAYS

1. REMOVE SEDIMENT FROM STREET
2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED
3. CLEAN UP UNCONTAINED WASHOUT

ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP.
A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11.

LEFT INSPECTION IN SALES OFFICE AND TALKED TO ED CRADDOCK.
10/11/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS NOT MADE-HAS TIL 10/23 FOR COMPLIANCE-HABITAT FOR HUMANITY TO HAVE MAINTENANCE COMPLETED BY THEN
10/03/2007 STORMWATER FOLLOW-UP INSP Correction Required AMERICA BUILT
CORRECTION NOTICE ISSUED 7 DAYS

1. REMOVE SEDIMENT FROM STREET
2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED

ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP.
A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11.
10/03/2007 STORMWATER FOLLOW-UP INSP Correction Required HABITAT FOR HUMANITY
CORRECTION NOTICE ISSUED 7 DAYS

1. REMOVE SEDIMENT FROM STREET
2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED
3. PERFORM MAINTENANCE ON SEDIMENT CONTROLS THROUGH OUT SITE.

ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP.
A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11.
10/03/2007 STORMWATER FOLLOW-UP INSP Correction Required RICHMOND AMERICAN
CORRECTION NOTICE ISSUED 7 DAYS

1. REMOVE SEDIMENT FROM STREET
2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED

ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP.
A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11.

GAVE INSPECTION TO HORUS. HE ADVISED SWEEPER DUE 10/4.
10/03/2007 STORMWATER FOLLOW-UP INSP Correction Required TJ BEDNAR
CORRECTION NOTICE ISSUED 7 DAYS

1. REMOVE SEDIMENT FROM STREET
2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED
3. CLEAN UP UNCONTAINED WASHOUT

ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP.
A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11.

LEFT INSPECTION IN SALES OFFICE AND TALKED TO ED CRADDOCK.
08/06/2007 STORMWATER FOLLOW-UP INSP Correction Required RAIN EVENT
WATER HAD NOT OVER TOPPED BASINS AT TIME OF INSPECTION
08/01/2007 STORMWATER FOLLOW-UP INSP Correction Required TALKED TO DANNY KNEE RE STORMWATER CONTROLS AND STABILIZATION CONCERNS
07/31/2007 STORMWATER FOLLOW-UP INSP Correction Required PATRICK AND MATT ON SITE PUMPING BASIN
WATTLES HAVE BEEN INSTALLED AT SCUPPERS
SUNSTATE SWEEPING DUE ON SITE 8/2
TALKED TO PIMA COUNTY INSPECTOR AND ADVISED AZPDES ALLOWS FOR HABITAT TO PUMP BASINS-CLEAN STORMWATER DISCHARGE
07/27/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 2 DAYS
FAXED AND SENT VIA REGULAR MAIL
LEFT MESSAGE FOR DANNY KNEES

PUMP OUT STANDING WATER IN BASINS
PERFORM MAINTENANCE ON ALL SEDIMENT CONTROLS
SWEEP STREETS
05/31/2007 STORMWATER FOLLOW-UP INSP Correction Required TJ BEDNAR
PICS 2291-2293
7118 VUELTA DE TRANQUILIDAD CLEAN UP WASH OUT, SWEEP STREET
LOT 258 CURBSIDE BMPS, SWEEP STREET
LOT 159 PLACE CONTROLS TO PROTECT DRAINAGEWAY
LOT 156 CURBSIDE BMPS AND SWEEP STREET
05/31/2007 STORMWATER FOLLOW-UP INSP Correction Required RICHMOND AMERICAN HOMES
CORRECTION NOTICE 10 DAYS
LOTS 206 AND 205 NEED CURBSIDE BMPS AND STREET SWEPT
05/31/2007 STORMWATER FOLLOW-UP INSP Correction Required HABITAT FOR HUMANITY
CORRECTION NOTICE 7 DAYS
MAINTAIN CONTROLS AT ALL INLET STRUCTURES AND BASIN LOCATIONS
04/05/2007 STORMWATER FOLLOW-UP INSP Correction Required HABITAT FOR HUMANITY

ALL CONTROLS ARE IN NEED OF MAINTENANCE
04/05/2007 STORMWATER FOLLOW-UP INSP Correction Required TJ BEDNAR

CURBSIDE BMPS NEED TO BE MAINTAINED AND ALL STOCK PILES NEED TO BE PROTECTED
04/05/2007 STORMWATER FOLLOW-UP INSP Correction Required RICHMOND AM

LOT 368
CONTAIN DEBRIS
04/05/2007 STORMWATER FOLLOW-UP INSP Correction Required AMERICA BUILT

CURBSIDE BMPS NEED TO BE PLACED/MAINTAINED
SWEEP IN FRONT OF ALL ACTIVE LOTS
03/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval DOUCETTE HAS AN UNMARKED CONCRETE WASHOUT ON SITE
NO OTHER CONCERNS
03/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval AMERICA BUILT HAS TRACK OUT AT NEW HOMES ON SE SIDE OF ELVIRA AND CMO D L HUMANIDAD
03/20/2007 STORMWATER FOLLOW-UP INSP Partial Approval TJ BEDNAR
TRACK OUT
10/06/2006 STORMWATER FOLLOW-UP INSP Correction Required AMERICA BUILT
CORRECTION NOTICE ISSUED 7 DAYS

-CLEAN UP DRYWALL WASHOUT LOTS 356-357
-RE-ESTABLISH CURBSIDE BMPS LOTS 356/357, 279/282, 257, 265-268
-SWEEP LOT 273/269, CMO AYUDA
08/15/2006 STORMWATER FOLLOW-UP INSP Correction Required TALKED TO MO WITH GRANITE
TALKED TO KEVIN WITH TJ BEDNAR
SITE SWEEPING HAS BEEN DONE IN PHASE 3
SITE LOOKING BETTER-EACH BUILDER HAS SEPARATE ISSUES 8/17 WILL BE 7 DAY FOLLOW UP INSPECTION NOV IS THE RESULT OF UNRESOLVED ISSUES FROM CORRECTION NOTICE
07/31/2006 STORMWATER FOLLOW-UP INSP Correction Required BLOW OUT AT NORTH END OF DRAINAGEWAY (JULIAN RANCH)
MET ON SITE WITH:
WLB MIKE SMITH
KB NICCI MADSEN
KB RON BARAIN
SWPPP MAINT SVC RICHARD LOPEZ
GRANITE MO PARTON
GRANITE FRANK LOZANO

DAVID ROBERTS AND JIM FEMLING IN ATTENDANCE ALSO
SEE PICS 709-744
07/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH MO FROM GRANITE

GAVE SITE A RAIN GAUGE

ALL RIP RAP WORK COMPLETE PER MO

ROADS HAVE BEEN SWEPT-STILL NEED WORK
06/30/2006 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH MO ONSITE
WATTLE BEING DELIVERED AND PLACED IN FRONT OF ALL INTLETS TO BASINS
NO CONCERNS ON THIS PHASE OF THE PROJECT
06/26/2006 STORMWATER FOLLOW-UP INSP Correction Required CONCRETE WASH OUT NEEDS TO BE BERMED
SPOKE TO MO WITH GRANITE-THIS WILL BE ADDRESSED
06/07/2006 STORMWATER FOLLOW-UP INSP Partial Approval WEDGE CURBS PARTIALLY IN
SUBGRADE APPEARS TO BE REACHED
PAVING SHOULD START SOON
SOME DRAINAGE STRUCTURES HAVE BEEN POURED
NO STANDING WATER AFTER LAST NIGHT'S RAIN
05/15/2006 STORMWATER FOLLOW-UP INSP Partial Approval PERMITS ON SITE WITH GRANITE ENGINEER
05/12/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IN GOOD CONDITION
CONTINUE MAINTAINING CONCRETE WASH OUT AREA
CONTINUE WITH SWEEPING
04/06/2006 STORMWATER FOLLOW-UP INSP Partial Approval NEED TO FINISH CLEAN UP AND PERM PATCH MCKINLEY WHERE UTILITY TIE IN WAS MADE
03/27/2006 STORMWATER FOLLOW-UP INSP Partial Approval NEED TO CLEAN UP DIRT IN ROADWAY FROM STREET CUT ON MCKINLEY FROM UTILITY TIE IN
03/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval SWEEP TRACKING AT VAN BUREN AND ELVIRA
BE SURE TO PLACE SEDIMENT CONTROLS AT ALL INLET STRUCTURES
03/13/2006 STORMWATER FOLLOW-UP INSP Partial Approval MET WITH MO FROM GRANITE
SITE IN GOOD CONDITION PHASE 2 IS INSTALLING UTILITIES
PH 1 IS PAVED
DOUCETTE SUBS TRACKING OUT
03/06/2006 STORMWATER FOLLOW-UP INSP Partial Approval UTILITY WORK BEING DONE
SCE IN PLACE AND APPEARS TO BE KEEPING TRACK OUT DOWN
GRANITE IS KEEPING UP ON SWEEPING
08/22/2005 STORMWATER FOLLOW-UP INSP Correction Required SPOKE WITH WILL HILLICKSON REQUESTED THAT HE GET SOMEONE TOMORROW TO CORRECT MODERATE AMOUNT OF RUN-OFF FROM CONSTRUCTION ENTRANCE AT ELVIRA/VANBUREN
06/09/2005 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS IN FAIR CONDITION WITH A MINOR AMOUNT OF MAINTENANCE NEEDED ON THE SILT-FENCING. CONTACT WILL BE MADE FOR REPAIRS AND RE-INSPECTED NEXT WEEK.
05/06/2005 STORMWATER FOLLOW-UP INSP Partial Approval THIS SITE HAS BEEN GRUBBED AND GRADED WITH ROUGH CUT FOR RETENTION/DETENTION BASINS ONLY. A FEW MINOR CONCERNS EXIST FOR SWPPP CONTROLS. MESSAGE WAS LEFT WITH THE SUPERINTENDENT AND FOLLOW-UP WILL OCCUR MONDAY THE 9TH.