Inspection History Details
Inspection Status: Correction Required
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE NEEDS SWEEPING AT ACTIVE LOTS | |
| 08/13/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | TALKED TO JJ ONSITE REGARDING TRACK OUT FROM INNOVA=NEEDS TO BE SWEPT | |
| 01/08/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO APPRECIABLE STANDING WATER OTHER THAN SE BASIN E OF CMO D L ASPIRACION SIDEWALK BEING POURED AT VARIOUS LOCATIONS THROUGHOUT SITE IRRIGATION IN BIG BASIN BEING INSTALLED |
|
| 10/16/2007 | STORMWATER FOLLOW-UP INSP | Compliance | AMERICA BUILT TALKED TO JJ. AMERICA BUILT HAS COMPLETED ALL HOMES IN CDP. AMERICA BUILT CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. |
|
| 10/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | CORRECTIONS MADE RICHMOND AMERICAN CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. GAVE INSPECTION TO HORUS. HE ADVISED SWEEPER DUE 10/4. |
|
| 10/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTIONS NOT MADE-HAS TIL 10/23 FOR COMPLIANCE-HABITAT FOR HUMANITY TO HAVE MAINTENANCE COMPLETED BY THEN TJ BEDNAR CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED 3. CLEAN UP UNCONTAINED WASHOUT ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. LEFT INSPECTION IN SALES OFFICE AND TALKED TO ED CRADDOCK. |
|
| 10/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTIONS NOT MADE-HAS TIL 10/23 FOR COMPLIANCE-HABITAT FOR HUMANITY TO HAVE MAINTENANCE COMPLETED BY THEN | |
| 10/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. |
|
| 10/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED 3. PERFORM MAINTENANCE ON SEDIMENT CONTROLS THROUGH OUT SITE. ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. |
|
| 10/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AMERICAN CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. GAVE INSPECTION TO HORUS. HE ADVISED SWEEPER DUE 10/4. |
|
| 10/03/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CORRECTION NOTICE ISSUED 7 DAYS 1. REMOVE SEDIMENT FROM STREET 2. ENSURE CURBSIDE BMPS WORKING/ESTABLISHED 3. CLEAN UP UNCONTAINED WASHOUT ITEMS 1 AND 2 WERE ISSUED TO ALL BUILDERS AT CDP. A $75 REINSPECTION FEE WILL RESULT FOR ANY UNADDRESSED ITEMS AT NEXT INSPECTION 10/11. LEFT INSPECTION IN SALES OFFICE AND TALKED TO ED CRADDOCK. |
|
| 08/06/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | RAIN EVENT WATER HAD NOT OVER TOPPED BASINS AT TIME OF INSPECTION |
|
| 08/01/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | TALKED TO DANNY KNEE RE STORMWATER CONTROLS AND STABILIZATION CONCERNS | |
| 07/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | PATRICK AND MATT ON SITE PUMPING BASIN WATTLES HAVE BEEN INSTALLED AT SCUPPERS SUNSTATE SWEEPING DUE ON SITE 8/2 TALKED TO PIMA COUNTY INSPECTOR AND ADVISED AZPDES ALLOWS FOR HABITAT TO PUMP BASINS-CLEAN STORMWATER DISCHARGE |
|
| 07/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 2 DAYS FAXED AND SENT VIA REGULAR MAIL LEFT MESSAGE FOR DANNY KNEES PUMP OUT STANDING WATER IN BASINS PERFORM MAINTENANCE ON ALL SEDIMENT CONTROLS SWEEP STREETS |
|
| 05/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR PICS 2291-2293 7118 VUELTA DE TRANQUILIDAD CLEAN UP WASH OUT, SWEEP STREET LOT 258 CURBSIDE BMPS, SWEEP STREET LOT 159 PLACE CONTROLS TO PROTECT DRAINAGEWAY LOT 156 CURBSIDE BMPS AND SWEEP STREET |
|
| 05/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AMERICAN HOMES CORRECTION NOTICE 10 DAYS LOTS 206 AND 205 NEED CURBSIDE BMPS AND STREET SWEPT |
|
| 05/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY CORRECTION NOTICE 7 DAYS MAINTAIN CONTROLS AT ALL INLET STRUCTURES AND BASIN LOCATIONS |
|
| 04/05/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | HABITAT FOR HUMANITY ALL CONTROLS ARE IN NEED OF MAINTENANCE |
|
| 04/05/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | TJ BEDNAR CURBSIDE BMPS NEED TO BE MAINTAINED AND ALL STOCK PILES NEED TO BE PROTECTED |
|
| 04/05/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | RICHMOND AM LOT 368 CONTAIN DEBRIS |
|
| 04/05/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CURBSIDE BMPS NEED TO BE PLACED/MAINTAINED SWEEP IN FRONT OF ALL ACTIVE LOTS |
|
| 03/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | DOUCETTE HAS AN UNMARKED CONCRETE WASHOUT ON SITE NO OTHER CONCERNS |
|
| 03/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | AMERICA BUILT HAS TRACK OUT AT NEW HOMES ON SE SIDE OF ELVIRA AND CMO D L HUMANIDAD | |
| 03/20/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | TJ BEDNAR TRACK OUT |
|
| 10/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | AMERICA BUILT CORRECTION NOTICE ISSUED 7 DAYS -CLEAN UP DRYWALL WASHOUT LOTS 356-357 -RE-ESTABLISH CURBSIDE BMPS LOTS 356/357, 279/282, 257, 265-268 -SWEEP LOT 273/269, CMO AYUDA |
|
| 08/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | TALKED TO MO WITH GRANITE TALKED TO KEVIN WITH TJ BEDNAR SITE SWEEPING HAS BEEN DONE IN PHASE 3 SITE LOOKING BETTER-EACH BUILDER HAS SEPARATE ISSUES 8/17 WILL BE 7 DAY FOLLOW UP INSPECTION NOV IS THE RESULT OF UNRESOLVED ISSUES FROM CORRECTION NOTICE |
|
| 07/31/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | BLOW OUT AT NORTH END OF DRAINAGEWAY (JULIAN RANCH) MET ON SITE WITH: WLB MIKE SMITH KB NICCI MADSEN KB RON BARAIN SWPPP MAINT SVC RICHARD LOPEZ GRANITE MO PARTON GRANITE FRANK LOZANO DAVID ROBERTS AND JIM FEMLING IN ATTENDANCE ALSO SEE PICS 709-744 |
|
| 07/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MO FROM GRANITE GAVE SITE A RAIN GAUGE ALL RIP RAP WORK COMPLETE PER MO ROADS HAVE BEEN SWEPT-STILL NEED WORK |
|
| 06/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MO ONSITE WATTLE BEING DELIVERED AND PLACED IN FRONT OF ALL INTLETS TO BASINS NO CONCERNS ON THIS PHASE OF THE PROJECT |
|
| 06/26/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CONCRETE WASH OUT NEEDS TO BE BERMED SPOKE TO MO WITH GRANITE-THIS WILL BE ADDRESSED |
|
| 06/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | WEDGE CURBS PARTIALLY IN SUBGRADE APPEARS TO BE REACHED PAVING SHOULD START SOON SOME DRAINAGE STRUCTURES HAVE BEEN POURED NO STANDING WATER AFTER LAST NIGHT'S RAIN |
|
| 05/15/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | PERMITS ON SITE WITH GRANITE ENGINEER | |
| 05/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IN GOOD CONDITION CONTINUE MAINTAINING CONCRETE WASH OUT AREA CONTINUE WITH SWEEPING |
|
| 04/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NEED TO FINISH CLEAN UP AND PERM PATCH MCKINLEY WHERE UTILITY TIE IN WAS MADE | |
| 03/27/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NEED TO CLEAN UP DIRT IN ROADWAY FROM STREET CUT ON MCKINLEY FROM UTILITY TIE IN | |
| 03/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SWEEP TRACKING AT VAN BUREN AND ELVIRA BE SURE TO PLACE SEDIMENT CONTROLS AT ALL INLET STRUCTURES |
|
| 03/13/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH MO FROM GRANITE SITE IN GOOD CONDITION PHASE 2 IS INSTALLING UTILITIES PH 1 IS PAVED DOUCETTE SUBS TRACKING OUT |
|
| 03/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | UTILITY WORK BEING DONE SCE IN PLACE AND APPEARS TO BE KEEPING TRACK OUT DOWN GRANITE IS KEEPING UP ON SWEEPING |
|
| 08/22/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | SPOKE WITH WILL HILLICKSON REQUESTED THAT HE GET SOMEONE TOMORROW TO CORRECT MODERATE AMOUNT OF RUN-OFF FROM CONSTRUCTION ENTRANCE AT ELVIRA/VANBUREN | |
| 06/09/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS IN FAIR CONDITION WITH A MINOR AMOUNT OF MAINTENANCE NEEDED ON THE SILT-FENCING. CONTACT WILL BE MADE FOR REPAIRS AND RE-INSPECTED NEXT WEEK. | |
| 05/06/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | THIS SITE HAS BEEN GRUBBED AND GRADED WITH ROUGH CUT FOR RETENTION/DETENTION BASINS ONLY. A FEW MINOR CONCERNS EXIST FOR SWPPP CONTROLS. MESSAGE WAS LEFT WITH THE SUPERINTENDENT AND FOLLOW-UP WILL OCCUR MONDAY THE 9TH. |