Inspection History: GRADING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2009 | GRADING - INTERMEDIATE | Continued | No grading activity | |
| 02/04/2009 | GRADING - INTERMEDIATE | Correction Required | SITE VISIT WITH ELIZABETH ADD GROUTED ROCK RIP RAP ALONG SIDES OF BANK PROTECTION REMOVE STOCKPILES FROM BASIN WHERE PARK WILL BE |
|
| 09/02/2008 | GRADING - INTERMEDIATE | Correction Required | NO STANDING WATER IN BASINS THAT HAVE BEEN RE-ENGINEERED | |
| 08/29/2008 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 3269-3281 OF BASINS AFTER RAIN EVENT REDESIGNED BASINS APPEAR TO BE WORKING |
|
| 08/21/2008 | GRADING - INTERMEDIATE | Correction Required | MET ONSITE WITH INNOVA BASINS HAVE BEEN EXCAVATED AND FILLED WITH ROCK 2 CONCRETE SPILLWAYS HAVE BEEN INSTALLED WITH SPLASH PADS INNOVA TO PROVIDE LETTERS GIVING ELEVATIONS AND ROCK SIZE FOR EACH BASIN AREA WORKED WLB TO PROVIDE LETTER FOR DRAINAGE WORK TALKED TO PATRICK REGARDING LETTER REQUIREMENTS |
|
| 08/13/2008 | GRADING - INTERMEDIATE | Correction Required | SEE PICTURES 3201-3202 FOR WEIR CONSTRUCTION | |
| 08/01/2008 | GRADING - INTERMEDIATE | Correction Required | SITE VISIT AND PICTURES EROSION AT SE CORNER OF PROJECT AND OVER EX ON ELVIRA BASIN |
|
| 07/30/2008 | GRADING - INTERMEDIATE | Correction Required | SITE VISIT WITH ELIZABETH UNABLE TO SEE TOE DOWN AT TOP OF WALL AT WEIR LOCATION TOE DOWN AT BOTTOM OF WEIR LOCATION FOOTER POURED TOW DOWN AT WEIR LOCATION FOR N MCKINLEY BASIN POURED CHANNEL HAS BEEN CUT FROM ADOT ROW TO BIG SE BASIN-NO PLANS TO ELIZABETH FOR THIS CHANGE |
|
| 07/18/2008 | GRADING - INTERMEDIATE | Correction Required | DROVE SITE TALKED TO PATRICK ON THE PHONE REGARDING POSSIBLE CHANGES TO DRAINAGE-DIVERTING ON SITE FLOW TO SE BASIN-ADVISED CHANGE RECOMMENDED BY MIKE SMITH (WLB) MUST BE OKAYED BY ELIZABETH |
|
| 07/15/2008 | GRADING - INTERMEDIATE | Partial Approval | TALKED TO BOB WITH INNOVA TOE DOWN BEING DUG AND FRAMED AT BIG MCKINLEY BASIN |
|
| 07/11/2008 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 3075-3091 STANDING WATER PICS ALSO SEE FLOW FROM ADOT ROW WHERE SWALE HAS BEEN REMOVED ALONG WB FRONTAGE |
|
| 07/08/2008 | GRADING - INTERMEDIATE | Correction Required | STANDING WATER IN BASINS AFTER 24 HOURS SEE PICS 3063-3068 |
|
| 06/27/2008 | GRADING - INTERMEDIATE | Partial Approval | CUT OFF WALL BEING FORMED ON THE WEST SIDE OF SITE MCKINLEY BASIN WORK TO START NEXT WEEK PER INNOVA |
|
| 06/25/2008 | GRADING - INTERMEDIATE | Correction Required | PHONE CALL FROM PATRICK EXCAVATION ON BASINS TO START THIS WEEK CUT OFF WALL AT WEST SIDE OF ELVIRA BASIN AND CONCRETE WORK ON MCKINLEY BASIN TO BE DONE AT THE SAME TIME |
|
| 06/23/2008 | GRADING - INTERMEDIATE | Correction Required | NO NEW WORK ON DRAINAGE | |
| 04/14/2008 | GRADING - INTERMEDIATE | Correction Required | IMPROVEMENTS TO DRAINAGE FACILITES STILL NOT COMPLETE ELIZABETH TO SEND LETTER ADVISING DRAINAGE REPORT NEEDED AND WORK NEEDS TO BE COMPLETE BEFORE MONSOON |
|
| 01/30/2008 | GRADING - INTERMEDIATE | Correction Required | STANDING WATER PIC 2935 MET WITH MIKE SMITH (WLB) ON SITE PUT ERIC CHENEY AND MIKE SMITH IN CONTACT TO COORDINATE DRAINAGE IMPROVEMENTS ON BORDER OF BOTH PROJECTS |
|
| 01/09/2008 | GRADING - INTERMEDIATE | Correction Required | STANDING WATER SEE PICS 2917-2919 | |
| 12/10/2007 | GRADING - INTERMEDIATE | Continued | STANDING WATER PICS 2867-2873 | |
| 12/04/2007 | GRADING - INTERMEDIATE | Continued | STANDING WATER PICTURES 2861-2865 RAIN EVENT 11/30 AND 12/1 |
|
| 10/17/2007 | GRADING - INTERMEDIATE | Continued | PIPE BEING INSTALLED FOR DRAINAGE IMPROVEMENTS INNOVA DOING WORK CALLED PATRICK PITTMAN REGARDING CREW NEEDING A WATER TRUCK |
|
| 09/18/2007 | GRADING - INTERMEDIATE | Correction Required | PICS 2646-2649 STANDING WATER | |
| 09/17/2007 | GRADING - INTERMEDIATE | Correction Required | STANDING WATER SEE PICS 2622-2626 | |
| 09/04/2007 | GRADING - INTERMEDIATE | Correction Required | RCP STAGED IN SE CORNER OF SITE WORK HAS NOT STARTED ON DRAINAGE IMPROVEMENT BETWEEN CANTERBURY AND CDP CDP SIDE OF WORK ON BIG BASIN NOT STARTED-STABILIZATION |
|
| 08/30/2007 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 2604-2607 LANDSCAPING/IRRIGATION WORK CONTINUING |
|
| 08/24/2007 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 2601-2603 MET WITH BRIAN WITH DESERT EARTH CONTRACTORS DOING DRAINAGE REPAIRS NO FURTHER WORK ON NEW DRAINAGE EASEMENT FRM CANTERBURY TO CDP IN THE SE CORNER |
|
| 08/21/2007 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 2572-2577 WORK HAS STARTED ON FAILURE POINT BETWEEN CDP AND JULIAN RANCH ALSO STANDING WATER IN BASINS STILL |
|
| 08/14/2007 | GRADING - INTERMEDIATE | Correction Required | DRAINAGEWAY HAS NOT BEEN ADDRESSED PER EMAIL FROM ELIZABETH: Thanks for staying on top of this project and sending the photos Nichole. This does not appear to be a sufficient temporary fix for this drainageway. I have put in a couple more calls to KB - I think they recognize my phone number since they have never picked up the phone since June. I am awaiting a construction schedule and a call back. I will contact you in the AM with an update. Elizabeth >>> Nichole Kalahar Zormeier 14-Aug-07 2:14 PM >>> Elizabeth, This is a follow up to our phone call this morning. I am attaching the pictures I took today on site. The actual failure point was filled again with dirt. The rock you see is from last year's fix. This is the only work I see on any of the drainage areas. Please let me know if you need me to take you out to the site. Thanks, Nichole >>> Elizabeth Eberbach 08/14/2007 11:25 AM >>> I need a formal response/communique on this please. SEE PICS 2570-2571 |
|
| 07/25/2007 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 2492-2504 DRAINAGE STRUCTURE BREECH STREET FLOODING BASINS OVER TOPPED STANDING WATER |
|
| 07/11/2007 | GRADING - INTERMEDIATE | Correction Required | SENT PDF FILES FROM LANDMARK TO MIKE WITH WLB STAKING HAS BEEN DONE ON JULIAN RANCH NO OTHER WORK COMPLETED AT THIS TIME |
|
| 07/05/2007 | GRADING - INTERMEDIATE | Correction Required | MET WITH ELIZABETH SHE CALLED AND LEFT MESSAGES WITH KB HOMES BETSY AND WITH LANDMARK ENG TO CHECK ON STATUS OF WORK TO REPAIR LAST YEAR'S MONSOON DAMAGE AND COMPLETE GRADING WORK FOR JULIAN RANCH/CDP ADJOINING DRAINAGE/BASIN FACILITIES |
|
| 06/29/2007 | GRADING - INTERMEDIATE | Correction Required | TALKED TO SITE SUPER REGARDING LOT 159 NOT BEING GRADED PER PLAN HE STATED LOT IS NOT COMPLETE YET AND WILL BE GRADED TO DRAIN PER PLAN BEFORE/WITH LANDSCAPING |
|
| 06/13/2007 | GRADING - INTERMEDIATE | Correction Required | STANDING WATER/MUDDY BASINS SEE PICS | |
| 06/12/2007 | GRADING - INTERMEDIATE | Correction Required | STANDING WATER IN BASINS SEE PICS (SMALL RAIN EVENT 6/11 AFTER 2:00 PM) | |
| 06/07/2007 | GRADING - INTERMEDIATE | Correction Required | SEE PICS 2319-2336 WORK TO ADDRESS DRAINAGE ISSUES HAS NOT BEEN PERFORMED IN THE JULIAN RANCH SUBDIVSION CDP HAS EXCAVATED THE BASINS, ADDED METERED FLOW PLATES AT CONVEYANCE PIPES, SCARIFIED THE BASIN BOTTOMS AND DONE GENERAL MAINTENANCE. OUTSTANDING WORK INCLUDES RIP RAP WORK, WEIR INSTALLATION AND EROSION MITIGATION ON JULIAN RANCH PROPERTY. THERE ARE ADDITIONAL CONCERNS ABOUT MISSING RIP RAP ON MCKINLEY BOX CULVERT SIDES AND DRAINAGE AT CMU WALL WEEPHOLES JUST EAST OF DRAINAGE CHANNEL. |
|
| 06/07/2007 | GRADING - INTERMEDIATE | Correction Required | REPORTED FINDINGS TO ELIZABETH CALLS MADE TO WARREN THOMPSON AT EEC AND TO BETSY WITH KB HOMES. |
|
| 03/20/2007 | GRADING - INTERMEDIATE | Correction Required | NO WORK STARTED ON SE BASIN FOR TIE INTO CANTERBURY RANCH | |
| 12/07/2006 | GRADING - INTERMEDIATE | Correction Required | MEETING DOWNTOWN CALLED BY ELIZABETH WITH DAVID LITTLE, DANNY KNEE, DAVID ROBERTS. CHANGES HAVE BEEN ADDRESSED AND NEED TO BE DISCUSSED WITH TDOT POST CONSTRUCTION PERC TESTS ARE TO BE CONDUCTED AND PERC RATES PROVIDED TO ELIZABETH |
|
| 08/01/2006 | GRADING - INTERMEDIATE | Correction Required | TOOK ELIZABETH TO SITE A REVISED GRADING PLAN/DRAINAGE REPORT MAY BE REQUIRED I GAVE ELIZABETH THE GRADING PLANS FROM OUR OFFICE FOR CORAZON DEL PUEBLO AND CANTERBURY RANCH. JULIAN RANCH WILL HAVE TO BE PULLED FROM RECORDS |
|
| 06/08/2006 | GRADING - INTERMEDIATE | Correction Required | BASINS ARE HOLDING WATER MET WITH MO AND WLB ONSITE-REVISIONS FORTHCOMING FOR AN INCORRECT WIER STRUCTURE ALSO |