Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
7250 E VOYAGER RD
Apply Date:
09/20/2004
Applicant:
STANTEC/ WARREN THOMPSON
Description:
GRADING: CUT 75,650 CY FILL 28,860 CY VLG 3 LOTS 1-97 MERITAGE
Contractors:
  • MERITAGE HOMES
  • STANTEC

Permit Reviews

Permit Number - T04BU02320
Permit Status: Final
Permit Description: GRADING: CUT 75,650 CY FILL 28,860 CY VLG 3 LOTS 1-97 MERITAGE
Start Date Submittal Complete Date Status  
09/20/2004 PLANS OK TO SUBMIT - GRADING 09/20/2004 COMPLETED Review Details
09/21/2004 GRADING 10/22/2004 COMPLETED Review Details
11/24/2004 RESUBMITTAL - GRADING ALL 03/11/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04BU02320
Permit Status: Final
Permit Description: GRADING: CUT 75,650 CY FILL 28,860 CY VLG 3 LOTS 1-97 MERITAGE
Total Outstanding Activity Conditions - 1
Date Name
09/20/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04BU02320
Permit Description: GRADING: CUT 75,650 CY FILL 28,860 CY VLG 3 LOTS 1-97 MERITAGE
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/15/2005 NPPO PRE PERMIT INSPECTION ACONNOR Approved
11/02/2007 GRADING - FINAL DROBERTS Approved THIS INSPECTION IS NOT TO BE CONSIDERED A PORTION OF THE GRADING INSPECTION FOR THIS CURRENT PERMIT. THE INFORMATION PROVIDED HERE IS TO BE UTILIZED SOLELY FOR THE REDUCTION OF THE GRADING RESEEDING BOND THAT HAS BEEN POSTED FOR THIS SITE. CURRENTLY THE SITE IS APPROXIMATELY 60% COMPLETE AT THIS TIME, LEAVING 40% OF UNDEVELOPED LOTS. THE MINIMAL AMOUNT OF THE GRADING RESEEDING BOND THAT WILL BE REQUIRED TO BE LEFT IN PLACE WILL BE ATLEAST 60% OF THE CURRENT BOND. THE SITE WILL NEED TO HAVE A FINAL GRADING INSPECTION COMPLETED TO VERIFY IF THERE ARE ANY OTHER ITEMS THAT NEED TO BE ADDRESSED PRIOR TO TURNING THE SITE OVER TO ANOTHER DEVELOPER. SEE THE INSPECTION RESULTS IN SUBDIVISION FILE S04-078 FOR THE ITEMS THAT REMAIN INCOMPLETE AT THIS TIME FOR THE RELEASE OF THE ASSURANCES.
12/21/2007 STORMWATER FOLLOW-UP INSP NKALAHAR Approved TRACK OUT
CALLED JAY KNOLL TO FIND OUT CORRECT PROCEDURE FOR NOTIFICATION
04/18/2011 STORMWATER INSTALL OF CONTROLS DROBERTS Approved
04/18/2011 ENGINEERING PRE-CONSTRUCTION DROBERTS Approved

Documents

File Name Document Type  
100_3296.JPG IMAGES VIEW
100_3298.JPG IMAGES VIEW
100_3299.JPG IMAGES VIEW
100_3300.JPG IMAGES VIEW
100_3301.JPG IMAGES VIEW
100_3364.JPG IMAGES VIEW
BOND RELEASE DOCUMENTS VIEW
BOND RELEASE LETTER 2009_10_15.PDF DOCUMENTS VIEW