Permit: T04BU02320


Addresses:

7250 E VOYAGER RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T04BU02320

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
04/18/2011 STORMWATER FOLLOW-UP INSP Approved
10/03/2008 STORMWATER FOLLOW-UP INSP Partial Approval SWPPP CONCERNS ADDRESSED
09/02/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
PICS 3296, 3298-3301

-CLEAN UP CONCRETE WASHOUT FROM STREET AT ACTIVE LOTS ON SYCAMORE PARK BLVD
-TRACK OUT AT CONCRETE WASHOUT
-PLACE CURBSIDE BMPS
-PROTECT ALL STOCKPILES

NOTE: STANDING WATER ISSUES NEED TO BE ADDRESSES BEFORE FINAL GRADING INSPECTION
08/13/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS
-SWEEP AT CONCRETE WASHOUT, LOTS 21-24, 29 + 30, 41 AND 87
07/10/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS
-TRACK OUT ON SYCAMORE PK AT WASHOUT
-WASHOUT FULL
-TRACK OUT AT LOT 23
-DRYWALL/PAINT WASHOUT ON N SIDE OF STREET AT LOT 23
-LOT 27 SAND IN STREET AND NO CURBSIDE BMPS
-LOT 28 TRACK OUT- CURBSIDE BMPS HAVE BEEN RUN OVER
-LOT 86 AND 87 HEAVY TRACK OUT
05/08/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
BUILDING ALONG SYCAMORE PK IS BEING WELL MAINTAINED
03/17/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
03/06/2008 STORMWATER FOLLOW-UP INSP Correction Required 3-4 HOMES UNDER CONSTRUCTION
TRACK OUT IN ROADWAY
NO OTHER STORMWATER CONCERNS
01/08/2008 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 4 DAYS
RAIN EVENT LAST NIGHT
HEAVY TRACK OUT AT CONCRETE WASHOUT AND AT ACTIVE CONSTRUCTION LOTS
SEE PICS 2915-2916
12/21/2007 STORMWATER FOLLOW-UP INSP Correction Required TRACK OUT
CALLED JAY KNOLL TO FIND OUT CORRECT PROCEDURE FOR NOTIFICATION
12/06/2007 STORMWATER FOLLOW-UP INSP Correction Required SITE NEEDS TO BE SWEPT
CURB SIDE BMPS NEED MAINTENANCE/INSTALLATION
11/09/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS
10/08/2007 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS

CP -LOTS 37-44, 91-94 CLEAN UP TRACK OUT AND CONSTRUCTION DEBRIS
CP -SWEEP STREET AT ALL ACTIVE LOTS
CP/ONGOING -ENSURE ALL CURBSIDE BMPS IN WORKING ORDER
10/01/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 5 DAYS

-LOTS 37-44, 91-94 CLEAN UP TRACK OUT AND CONSTRUCTION DEBRIS
-SWEEP STREET AT ALL ACTIVE LOTS
-ENSURE ALL CURBSIDE BMPS IN WORKING ORDER
09/13/2007 STORMWATER FOLLOW-UP INSP Correction Required LOT 71/72 DIRT AND DEBRIS IN ROADWAY
CALLED JAY KNOLL-UNABLE TO LOCATE SITE SUPER
NO OTHER CONCERNS AT THIS TIME
08/23/2007 STORMWATER FOLLOW-UP INSP Partial Approval WALKED SITE WITH JAY KNOLL W/ MERITAGE
ADEQ STEVE DEVEREAUX
NW LANDSCAPING JIM MILLER

NO STORMWATER CONCERNS
DOCUMENTATION REVIEWED
08/21/2007 STORMWATER FOLLOW-UP INSP Partial Approval TALKED TO JAY KNOLL
ON SITE MEET SCHD FOR 8/23 8 AM WITH ADEQ
07/12/2007 STORMWATER FOLLOW-UP INSP Correction Required SITE NEEDS SWEEPING AND GENERAL CLEAN UP
06/27/2007 STORMWATER FOLLOW-UP INSP Correction Required DROPPED OFF PAPERWORK
06/26/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
SWEEP TRACK OUT ROCK LOT 37
SWEEP AT CONCRETE WASHOUT
LOT 95 SWEEP
LOT 50 DUMPSTER IN ROADWAY
05/17/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 10 DAYS
PICS 2286-2288
-PLACE/MAINTAIN CURBSIDE BMPS LOTS 34, 66, 64, 50
-SWEEP IN FRONT OF LOTS 76 ADN 97
-UNCONTAINED WASHOUT LOT 51
03/21/2007 STORMWATER FOLLOW-UP INSP Partial Approval STREETS NEED TO BE SWEPT
01/30/2007 STORMWATER FOLLOW-UP INSP Correction Required STREETS NEED TO BE SWEPT
01/09/2007 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS
-TRACK OUT W OF DRAINAGE WAY LOT 12
-TRACK OUT W OF JOBSITE TRAILER
-SEDIMENT IN STREET BIG TREE LN, AUTUMN LEAF AND SHADYBROOK
-TRACK OUT (LANDSCAPING CREWS) LOT 37-44
11/27/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS
-TRACK OUT LOT 84,54
-UNCONTAINED CONSTRUCTION DEBRIS LOT 96
-LOT 83 NO BMP IN PLACE AT MORTAR MIXER
-LOT 82 PAINT WASHED OUT IN FRONT OF LOT
11/16/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE ISSUED 10 DAYS
-SWEEP AND RE-ESTABLISH CURBSIDE BMP LOT 10
-DEBRIS IN ROADWAY BETWEEN LOTS 27 AND 37 AUTUMN LEAF DR
-EROSION AND SPOIL PILES SOUTH SIDE OF LOT 36
-SWEEP UP TRACK OUT ROCK AT JOB TRAILER/CONCRETE WASHOUT
-SWEEP TRACK OUT LOT 49
-SWEEP SUMMER BREEZE AND PICKET FENCE
10/17/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE 7 DAYS

-LOT 3 DUMPSTER OVERFLOWING, CONCRETE WASHOUT, SAND IN ROADWAY
-SWEEP CROWS NEST
-RE-ESTABLISH CURBSIDE BMPS AUTUMN LEAF (WEST END)
-DRYWALL WASHED OUT LOT 52
-LOTS 55-58 PROTECT STOCKPILES
-LOT 57 DRYWALL/STUCCO WASHED OUT
-PICKET FENCE LOT 83 AND 82 RE-ESTABLISH CURBSIDE BMPS
-DRYWALL WASHED OUT LOT 82
-CONCRETE WASHOUT LOT 70
09/08/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTON NOTICE 7 DAYS

-SWEEP CROWS NEST
-TRACK OUT LOTS 8-18 ONTO SYCAMORE PK BLVD FROM MASONS (BRICK DROPPED OFF)
-RE-ESTABLISH CURBSIDE BMP IN FRONT OF LOT 19
-EROSION IN LOT 37
-SWEEP UP EROSION IN STREET WOODCREEK/AUTUMN LEAF DR
-SWEEP TRACK OUT ON PICKET FENCE
08/09/2006 STORMWATER FOLLOW-UP INSP Correction Required -SWEEP CROWS NEST
-INSULATION (CONST DEBRIS) AT STEPS TO SALES OFFICE
-STUCCO WASHED OUT IN FRONT OF LOT 4 (DRIVEWAY)
-CONSTRUCTION DEBRIS NOT IN DUMPSTER LOT 5
-PROTECT ALL WEEP HOLES
-STOCKPILES NOT PROTECTED ON SYCAMORE PARK LOOP
-SWEEP AUTUMN LEAF/WOOD CREEK/BIG TREE/PICKET FENCE/SUMMER BREEZE
-PLACE SEDIMENT CONTROLS BEHIND CURB ALL LOTS
07/13/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE MAILED TO JAY KNOLL 7/25:
1. PORTA TOILET IN H/C PARKING AT SALES OFFICE
2. SWEEP UP TRACK OUT AT CONCRETE WASHOUT
3. SWEEP PICKET FENCE AND SUMMER BREEZE
06/20/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
05/31/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCRETE WASH OUT-TRUCKS WASHING OUT ON SW SIDE OF CROWS NEST (LOT 3)
04/03/2006 STORMWATER FOLLOW-UP INSP Partial Approval PAVING WORK CONTINUING
NO CONCERNS AT THIS TIME
02/28/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
02/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/25/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO CONCERNS AT THIS TIME
01/09/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE WORK CONTINUES. NO CONCERNS AT THIS TIME
12/19/2005 STORMWATER FOLLOW-UP INSP Partial Approval BASIN ROUGH GRADED
VERTICAL CURB IN FOR SYCAMORE PARK BLVD
GRADING LIMITS STILL CLEARLY MARKED
WATTLE APPEARS TO BE HOLDING UP ALONG S. SIDE OF PROJ
11/18/2005 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME
ALL SWPPP IN PLACE AND APPEAR TO BE WORKING
MET WITH DAN MATTAUSCH 730-9447
SWPPP POSTING AT WEST SCE
DAN WILL CHECK ON SECONDARY CONTAINMENT FOR FORM RELEASE BEING USED ON BOX CULVERT OVER THE PANTANO WASH
05/13/2005 STORMWATER FOLLOW-UP INSP Partial Approval THIS SITE WILL HAVE ALL COMMENTS ENTERED UNDER THIS PERMIT NUMBER ABOVE, (T04BU02317). NO MAJOR STORM WATER CONCERS AT THIS SITE AT THIS TIME. SITE IS