Permit: T04BU02319
Permit Details
Apply Date:
09/20/2004
Applicant:
STANTEC /WARREN THOMPSON
Description:
GRADING:CUT 3,108 CY FILL 167,765 CY VLG 2 LOTS 1-146 LENNAR HOMES
Contractors:
- STANTEC
Permit Reviews
Permit Number - T04BU02319
Permit Status: Final
Permit Description: GRADING:CUT 3,108 CY FILL 167,765 CY
VLG 2 LOTS 1-146 LENNAR HOMES
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2005 | RESUBMITTAL - GRADING ALL | 02/24/2005 | COMPLETED |
| 02/24/2005 | RESUBMITTAL - GRADING | 03/11/2005 | COMPLETED |
| 09/20/2004 | PLANS OK TO SUBMIT - GRADING | 09/20/2004 | COMPLETED |
| 09/21/2004 | GRADING | 10/22/2004 | COMPLETED |
| 11/24/2004 | RESUBMITTAL - GRADING ALL | 01/07/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02319
Permit Status: Final
Permit Description: GRADING:CUT 3,108 CY FILL 167,765 CY
VLG 2 LOTS 1-146 LENNAR HOMES
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/20/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02319
Permit Description: GRADING:CUT 3,108 CY FILL 167,765 CY
VLG 2 LOTS 1-146 LENNAR HOMES
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2005 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 12/19/2005 | STORMWATER FOLLOW-UP INSP | NKALAHAR | Approved | VERT CURB INSTALLED RETENTION ROUGH CUT DRY UTILS STILL BEING INSTALLED |
| 11/23/2007 | LANDSCAPE INSPECTION | ACONNOR | Approved | Verify that all of Engineering comments and concerns are addressed. Monitoring report requested as to disposition of disposition of PIP, TOS, and required mitigation, as shown in the NPPO summary. |
| 12/21/2007 | GRADING - FINAL | NKALAHAR | Approved | MET ONSITE WITH DAVE, NICOLE AND SEAN DISCUSSED DEFICIENCIES INCLUDING BASINS HOLDING WATER, EROSION AND GENERAL CLEAN UP STABILIZATION FOR UNCOMPLETED PADS MUST BE WORKED OUT WITH EOR AND CITY REVIEW ENGINEER |
| 08/17/2010 | STORMWATER INSTALL OF CONTROLS | JFEMLING | Approved | Approved |
| 08/17/2010 | ENGINEERING PRE-CONSTRUCTION | JFEMLING | Approved | Approved |