Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address NEW:
7250 E VOYAGER RD
Apply Date:
09/20/2004
Applicant:
STANTEC /WARREN THOMPSON
Description:
GRADING:CUT 3,108 CY FILL 167,765 CY VLG 2 LOTS 1-146 LENNAR HOMES
Contractors:
  • STANTEC

Permit Reviews

Permit Number - T04BU02319
Permit Status: Final
Permit Description: GRADING:CUT 3,108 CY FILL 167,765 CY VLG 2 LOTS 1-146 LENNAR HOMES
Start Date Submittal Complete Date Status  
01/07/2005 RESUBMITTAL - GRADING ALL 02/24/2005 COMPLETED Review Details
02/24/2005 RESUBMITTAL - GRADING 03/11/2005 COMPLETED Review Details
09/20/2004 PLANS OK TO SUBMIT - GRADING 09/20/2004 COMPLETED Review Details
09/21/2004 GRADING 10/22/2004 COMPLETED Review Details
11/24/2004 RESUBMITTAL - GRADING ALL 01/07/2005 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04BU02319
Permit Status: Final
Permit Description: GRADING:CUT 3,108 CY FILL 167,765 CY VLG 2 LOTS 1-146 LENNAR HOMES
Total Outstanding Activity Conditions - 1
Date Name
09/20/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04BU02319
Permit Description: GRADING:CUT 3,108 CY FILL 167,765 CY VLG 2 LOTS 1-146 LENNAR HOMES
Total Completed Inspections - 6
Date Description Inspector Results Comments
03/15/2005 NPPO PRE PERMIT INSPECTION ACONNOR Approved
12/19/2005 STORMWATER FOLLOW-UP INSP NKALAHAR Approved VERT CURB INSTALLED
RETENTION ROUGH CUT
DRY UTILS STILL BEING INSTALLED
11/23/2007 LANDSCAPE INSPECTION ACONNOR Approved Verify that all of Engineering comments and concerns are addressed.

Monitoring report requested as to disposition of disposition of PIP, TOS, and required mitigation, as shown in the NPPO summary.
12/21/2007 GRADING - FINAL NKALAHAR Approved MET ONSITE WITH DAVE, NICOLE AND SEAN

DISCUSSED DEFICIENCIES INCLUDING BASINS HOLDING WATER, EROSION AND GENERAL CLEAN UP

STABILIZATION FOR UNCOMPLETED PADS MUST BE WORKED OUT WITH EOR AND CITY REVIEW ENGINEER
08/17/2010 STORMWATER INSTALL OF CONTROLS JFEMLING Approved Approved
08/17/2010 ENGINEERING PRE-CONSTRUCTION JFEMLING Approved Approved

Documents

File Name Document Type  
BOND RELEASE LETTER 2008.PDF DOCUMENTS VIEW
BOND RELEASE LETTER 2013.PDF DOCUMENTS VIEW
BOND.PDF DOCUMENTS VIEW