Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU02319
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/17/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/06/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO NEW STARTS SUBDIVISION ONLY 1/2 BUILT OUT NO STORMWATER CONCERNS-V DITCH APPEARS TO BE WORKING |
|
| 01/27/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO ACTIVE LOTS AT THIS TIME NO CONCERNS |
|
| 10/03/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGE IN SITE | |
| 08/13/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGE IN SITE NO NEW STARTS |
|
| 07/10/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGE IN SITE | |
| 05/08/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO NEW STARTS NO CONCERNS AT THIS TIME |
|
| 03/17/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGE IN SITE | |
| 03/06/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO NEW STARTS NO STORMWATER CONCERNS |
|
| 11/09/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 10/01/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 09/13/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 07/12/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 06/27/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | DROPPED OFF PAPERWORK | |
| 06/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 10 DAYS SWEEP UP TRACK OUT ROCK AT SALES OFFICE/CONCRETE WASHOUT |
|
| 05/17/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 03/21/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT AT CONCRETE WASHOUT AREA USED FOR VLG 1 AND VLG 2 NO OTHER CONCERNS AT THIS TIME |
|
| 01/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 5 DAYS -LOT 68 CONCRETE WASHOUT -CLEAN UP TRACK OUT ON LAUGHING TREE |
|
| 01/09/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 11/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED 10 DAYS -LOT 54 NO BMP IN PLACE AT STUCCO MIXER |
|
| 11/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CONCERNS AT THIS TIME | |
| 10/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 7 DAYS -LOT 123 UNPROTECTED STOCKPILE -SWEEP AT CONCRETE WASHOUTS -SWEEP WEEPING WILLOW -CLEAN UP CONCRETE AND PAINT FROM ROADWAY LOTS 45-37 -DRYWALL WASHOUT LOT 52 -SWEEP LAUGHING TREE |
|
| 09/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 7 DAYS -REPLACE SEDIMENT CONTROLS AT DROP INLET WEST END OF WEEPING WILLOW -SWEEP WEEPING WILLOW -CURBSIDE BMPS AT ALL VERTICAL LOTS -2056/2055 WEEPING WILLOW PLACE ALL CONSTRUCTION DEBRIS IN DUMPSTERS -SEDIMENT CONTROLS NEEDED IN COMMON AREAS SW CORNER |
|
| 08/09/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | -MYSTIC MEADOW NEEDS TO BE SWEPT (TRACK OUT) -SWEEP WEEPING WILLOW -SWEEP FOUR SEASONS |
|
| 07/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. DEBRIS IN OPEN UTILITY TRENCH LOT 2032 2. SWEEP BETWEEN LOTS 2032 AND 2040 3. CONCRETE WASHED OUT NORTH OF LOT 2043 4. DEBRIS IN FRONT OF 2047 |
|
| 06/20/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | -CLEAN UP ASPHALT AND CONCRETE NEXT TO DRAINAGEWAY AT SILKWOOD AND WEEPING WILLOW -PLACE SEDIMENT CONTROLS OR MOVE DIRT STOCKPILE AT SAME LOCATION AS ABOVE -CLEAN UP CONCRETE WASHOUT/TRACKOUT FROM FOUNDATION AT 2044 ON WEEPING WILLOW |
|
| 04/12/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT ONTO ASPHALT BY EAGLEROCK | |
| 04/03/2006 | STORMWATER FOLLOW-UP INSP | Approved | PAVING WORK CONTINUING NO CONCERNS AT THIS TIME |
|
| 02/28/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 02/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 01/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
| 01/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE WORK CONTINUES NO CONCERNS AT THIS TIME | |
| 12/19/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | VERT CURB INSTALLED RETENTION ROUGH CUT DRY UTILS STILL BEING INSTALLED |
|
| 11/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS AT THIS TIME ALL SWPPP IN PLACE AND APPEAR TO BE WORKING MET WITH DAN MATTAUSCH 730-9447 SWPPP POSTING AT WEST SCE DAN WILL CHECK ON SECONDARY CONTAINMENT FOR FORM RELEASE BEING USED ON BOX CULVERT OVER THE PANTANO WASH |
|
| 05/13/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | THIS SITE WILL HAVE ALL COMMENTS ENTERED UNDER THIS PERMIT NUMBER ABOVE, (T04BU02317). NO MAJOR STORM WATER CONCERS AT THIS SITE AT THIS TIME. SITE IS |