Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T04BU02319
Inspection Description - GRADING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2007 | GRADING - FINAL | Approved | MET ONSITE WITH DAVE, NICOLE AND SEAN DISCUSSED DEFICIENCIES INCLUDING BASINS HOLDING WATER, EROSION AND GENERAL CLEAN UP STABILIZATION FOR UNCOMPLETED PADS MUST BE WORKED OUT WITH EOR AND CITY REVIEW ENGINEER |
|
| 11/20/2007 | GRADING - FINAL | Not ready for Inspection | -EROSION S OF LOTS 39-45 -STABILIZE LOTS 142-146, 141-124 (CLEAN UP DEBRIS), 97-85, 89-110, 123-111, 2-32 -REMOVE ALL ASPHALT, GARBAGE AND PALLETS -REMOVE ROLL OFFS AND MOBILE MINI -EROSION N OF LOTS 1-17 STABILIZE LOTS |
|
| 11/02/2007 | GRADING - FINAL | Not ready for Inspection | THIS INSPECTION IS NOT TO BE CONSIDERED A PORTION OF THE GRADING INSPECTION FOR THIS CURRENT PERMIT. THE INFORMATION PROVIDED HERE IS TO BE UTILIZED SOLELY FOR THE REDUCTION OF THE GRADING RESEEDING BOND THAT HAS BEEN POSTED FOR THIS SITE. CURRENTLY THE SITE IS APPROXIMATELY 36% COMPLETE AT THIS TIME, LEAVING 64% OF UNDEVELOPED LOTS. THE MINIMAL AMOUNT OF THE GRADING RESEEDING BOND THAT WILL BE REQUIRED TO BE LEFT IN PLACE WILL BE ATLEAST 100% OF THE CURRENT BOND. THE SITE WILL NEED TO HAVE A FINAL GRADING INSPECTION COMPLETED TO VERIFY IF THERE ARE ANY OTHER ITEMS THAT NEED TO BE ADDRESSED PRIOR TO TURNING THE SITE OVER TO ANOTHER DEVELOPER. SEE THE INSPECTION RESULTS IN SUBDIVISION FILE S04-077 FOR THE ITEMS THAT REMAIN INCOMPLETE AT THIS TIME FOR THE RELEASE OF THE ASSURANCES. |