Permit: T04BU02272
Permit Details
Apply Date:
09/14/2004
Applicant:
RICK ENGINEERING
Description:
GRADING:7000 CY CUT/16100 CY FILL
Contractors:
- VENTURE WEST INC
Permit Reviews
Permit Number - T04BU02272
Permit Status: Final
Permit Description: GRADING:7000 CY CUT/16100 CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/22/2009 | RESUBMITTAL - GRADING | 01/29/2009 | COMPLETED |
09/14/2004 | PLANS OK TO SUBMIT - GRADING | 09/14/2004 | COMPLETED |
09/14/2004 | GRADING | 10/12/2004 | COMPLETED |
10/20/2004 | RESUBMITTAL - GRADING ALL | 11/03/2004 | COMPLETED |
11/03/2004 | RESUBMITTAL - GRADING | 12/07/2004 | COMPLETED |
11/19/2008 | RESUBMITTAL - GRADING ALL | 12/18/2008 | COMPLETED |
12/17/2004 | RESUBMITTAL - GRADING ALL | 07/14/2005 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02272
Permit Status: Final
Permit Description: GRADING:7000 CY CUT/16100 CY FILL
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/14/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02272
Permit Description: GRADING:7000 CY CUT/16100 CY FILL
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2005 | ENGINEERING PRE-CONSTRUCTION | JBRUCKME | Approved | MEETING WITH: DEVELOPER - VENTURE WEST - STAN SPEARS 465-9087 GRADING CONTRACTOR - BEST PAVING - STEVE VORLTOLZER 449-0200 |
11/29/2005 | STORMWATER INSTALL OF CONTROLS | JBRUCKME | Approved | WILL BE ADDRESSED IN FOLLOW-UP INSPECTIONS. |
12/08/2005 | STORMWATER FOLLOW-UP INSP | JBRUCKME | Approved | SEE COMMENTS LISTED ON 12/7/05 INSPECTION. |
10/09/2006 | GRADING - FINAL | JBRUCKME | Approved | NOT READY FOR FINAL GRADING INSPECTION 1. CALL FOR INSPECTION ONE WEEK PRIOR TO REQUESTING C OF O FOR UNITS 38-41. 2. COMPLETE LANDSCAPING AND SOIL STABILIZATIION NEAR RETENTION/DETENTION BASIN AT EAST PERIMETER. |
10/10/2006 | LANDSCAPE INSPECTION | ACONNOR | Approved | LANDSCAPE INSPECTOR MUST CHECK FENCING OF NATURAL AREAS PRIOR TO GRUBBING OR GRADING. Inspection was not performed. Bond #S300-4300-734 will not be released until. landscape inspection is approved and monitoring report is received. On-site monitoring of all aspects of site clearing, grading, plant protection, preservation, salvage, and mitigation shall be provided during project construction at the expense of the developer. The monitoring shall be performed by an individual who is qualified in arid lands native plant resource identification and protection as specified in Sec. 3.8.4, The monitor shall provide periodic progress reports to the developer outlining the status of work accomplished and any problems encountered. A copy of these reports shall be submitted to the Development Services Department (DSD) for the project file. |
12/06/2006 | GRADING - INTERMEDIATE | JBRUCKME | Approved | PARTIAL OF SOUTHWEST QUAD |
06/11/2009 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | SITE WORK COMPLETED, SITE OCCUPIED - 2 LOTS UNDEVELOPED W/CURB AND SIDEWALK ON PERIMETER. |
06/24/2009 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
07/06/2009 | PERMIT FINALED | KMEDINA | Approved |