Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T04BU02272
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/18/2009 | GRADING - FINAL | Approved | Checked punch list all items complete | |
06/11/2009 | GRADING - FINAL | Denied | PUNCHLIST GENERATED 5/21/09, NO WORD ON COMPLETION OF PUNCHLIST ITEMS. SITE WORK COMPLETED - 2 LOTS LEFT UNDEVELOPED, WILL HAVE BLDG PERMITS AND SITE PLANS FOR EACH. | |
05/21/2009 | GRADING - FINAL | Denied | The Following items must be complete prior to final grading approval Sht 2/11 1) Install 15ft curb opening per key note 32 2) Address missing bike parking at Zona Restaurant 3) Remove straw waddle at CB NW corner of site. Sht 3/11 4) Raise HC signs to 84" in front of Bldg 22 Sht 4/11 5) Raise HC signs to 84" in front of Bldg 42 6) Remove silt sock from CB behind Bldg 30 7) Address missing bike parking in front of Bldg 47 Sht 5/11 8) Install drainage swale to sidewalk scupper at NE corner of Bldg 54 9) Install stop sign per Keynote 28 at NE drive entrance. 10) Backfill sink hole at storm outlet from east parking area for Bldg 55 11) Remove straw waddle from basin east of Bldg 55 12) Install bike parking for Bldg 48 General 13) Provide an Engineers certification for the storm water system for the project. 14) Clean all CB's |
|
01/14/2008 | GRADING - FINAL | Denied | NOT READY FOR FINAL GRADING 1. COMPLETE ALL SITE WORK CONSTRUCTION INCLUDING: BICYCLE PARKING, COVERED PARKING, SIDEWALKS, HANDICAP PARKING AND HANDICAP RAMPS. 2. PROVIDE AS-BUILT/REVISED GRADING AND DEVELOPMENT PLANS TO THE CITY OF TUCSON DEVELOPMENT SERVICES ENGINEERING AND ZONING DIVISIONS FOR REVIEW AND APPROVAL. THESE PLANS MUST BE C.O.T. APPROVED AND AVAILABLE FOR A FOLLOW-UP RE-INSPECTION AND REFLECT ALL CHANGES TO THE PLANS. 3. PROVIDE SOIL STABILIZATION ON ALL UN-BUILT LOTS #9-14, 32-37, 48 AND 49. 18/58 = 31% OF THE LOTS ARE UN-BUILT AND REQUIRE STABILIZATION (SEE SOIL STABILIZATION DOCUMENT ATTACHED TO INSPECTION REPORT) . PRIOR TO SOIL STABILIZATION PLEASE SEE GRADING NOTE #15. 4. PROVIDE 18' OF PARKING AND 24' OF PAAL BETWEEN LOTS 55 AND 56. THE SITE WALL ENCROACHES ON THE 2.5' OF VEHICLE OVERHANG ON THE WEST SIDE OF PARKING AREA. 5. PROVIDE AN ARIZONA REGISTERED P.E. LETTER OF CERTIFICATION THAT CERTIFIES THAT THE PROJECT IS CONSTRUCTED TO THE C.O.T. APPROVED REVISED/AS-BUILT PLAN. THIS CERTIFICATION MUST CONTAIN SPECIFIC LANGUAGE REGARDING: a] REVISED/AS-BUILT PLAN. b) DRAINAGE. c) RETENTION/DETENTION BASINS. d) A.D.A. COMPLIANCE. 6. INSPECTION $75.00 RE-FEE APPLIES TO BOTH FINAL GRADING AND FINAL STORMWATER INSPECTIONS. ADDITIONAL RE-FEES WILL BE APPLICABLE UNLESS THE INSPECTIONS ARE APPROVED. 7. PROVIDE POSITIVE DRAINAGE AT NW CORNER OF SITE. FLOW IS NORTH TO EAST AROUND NW CORNER OF BLDG. #1. |
|
04/30/2007 | GRADING - FINAL | Denied | NOT READY FOR FINAL GRADING INSPECTION, SEE INTERMEDIATE GRADING INSPECTION FOR COMMENTS | |
10/09/2006 | GRADING - FINAL | Denied | NOT READY FOR FINAL GRADING INSPECTION 1. CALL FOR INSPECTION ONE WEEK PRIOR TO REQUESTING C OF O FOR UNITS 38-41. 2. COMPLETE LANDSCAPING AND SOIL STABILIZATIION NEAR RETENTION/DETENTION BASIN AT EAST PERIMETER. |
|
09/29/2006 | GRADING - FINAL | Denied | CANCELED BY CONTRACTOR. |