Permit: T04BU02006
Permit Details
Apply Date:
08/12/2004
Applicant:
N/A
Description:
GRADING:CUT 2000 FILL 12000 (GRUBBING) BOND RELEASE PER BETH GRANT 11/15/06
Contractors:
- TL ROOF AND ASSOCIATES
Permit Reviews
Permit Number - T04BU02006
Permit Status: Final
Permit Description: GRADING:CUT 2000 FILL 12000 (GRUBBING)
BOND RELEASE PER BETH GRANT 11/15/06
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/18/2006 | REVISION - GRADING | 05/31/2006 | COMPLETED |
08/12/2004 | PLANS OK TO SUBMIT - GRADING | 08/27/2004 | COMPLETED |
08/27/2004 | GRADING | 09/24/2004 | COMPLETED |
09/28/2004 | RESUBMITTAL - GRADING ALL | 09/28/2004 | COMPLETED |
09/28/2004 | RESUBMITTAL - GRADING | 10/15/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU02006
Permit Status: Final
Permit Description: GRADING:CUT 2000 FILL 12000 (GRUBBING)
BOND RELEASE PER BETH GRANT 11/15/06
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
08/12/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU02006
Permit Description: GRADING:CUT 2000 FILL 12000 (GRUBBING)
BOND RELEASE PER BETH GRANT 11/15/06
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2004 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved | APPROVED FOR INSTALLATION OF CONTROLS, RE-INSPECTION WILL BE COMPLETED ON THIS SITE AS SOON AS THE CONTROL INSTALLATION HAS BEEN COMPLETED. |
12/28/2004 | STORMWATER INSTALL OF CONTROLS | JSALINE | Approved | CONTACT WAS MADE WITH TL ROOF AND ASSOCIATES, SUPERINTENDENT AND MYSELF HAVE DISCUSSED THE ABSENCE OF SILT-FENCING ALONG THE N. PERIMETER. IT HAS BEEN AGREED, DUE TO THE GRADE ELEVATION OF THE PROJECT THAT NO SILT-FENCING IS NEEDED IN THIS AREA. AZPDES AUTHORIZATION FORM HAS BEEN POSTED AND NO OTHER STORM WATER CONCERNS AT THIS TIME. ADVISED THAT THE RETENTION/DETENTION BASIN BE PROTECTED FROM SILT INFILTRATION DURING CONSTRUCTION. |
10/18/2005 | STORMWATER FINAL INSPECTION | JBRUCKME | Approved | |
10/18/2005 | STORMWATER FOLLOW-UP INSP | JBRUCKME | Approved | |
11/01/2006 | GRADING - FINAL | JBRUCKME | Approved |