Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T04BU02006
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2005 | STORMWATER INSTALL OF CONTROLS | Approved | ||
12/28/2004 | STORMWATER INSTALL OF CONTROLS | Partial Approval | CONTACT WAS MADE WITH TL ROOF AND ASSOCIATES, SUPERINTENDENT AND MYSELF HAVE DISCUSSED THE ABSENCE OF SILT-FENCING ALONG THE N. PERIMETER. IT HAS BEEN AGREED, DUE TO THE GRADE ELEVATION OF THE PROJECT THAT NO SILT-FENCING IS NEEDED IN THIS AREA. AZPDES AUTHORIZATION FORM HAS BEEN POSTED AND NO OTHER STORM WATER CONCERNS AT THIS TIME. ADVISED THAT THE RETENTION/DETENTION BASIN BE PROTECTED FROM SILT INFILTRATION DURING CONSTRUCTION. | |
12/15/2004 | STORMWATER INSTALL OF CONTROLS | Partial Approval | THE FILL WORK FOR THE SITE HAS BEEN STARTED AND STRAW BALES HAVE BEEN PLACED IN THE AREA OF THEEXISTING DRAINAGE OPENNING INTO THE SHOPPING CENTER AREA. FUTURE INSPECTIONS WILL BE SCHEDULED AS NEEDED DURING THE COURSE OF THE GRADING. |