Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T04BU02006
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2006 | GRADING - FINAL | Approved | ||
07/28/2006 | GRADING - FINAL | Denied | 1. COMPLETE ALL ITEMS LISTED ON 10-28-06 INSPECTION PUNCH LIST. 2. PROVIDE SLOPE STABILIZATION SEE NOTE #7 ON PREVIOUS INSPECTION, INCLUDE SLOPE BETWEEN EXTRUDED CURB AND BARRICADE, AND ROCK RIP RAP SHOWN BETWEEN KEYSTONE RETAINING WALLS AS SHOWN ON THE NEWLY REVISED GRADING PLAN. |
|
10/18/2005 | GRADING - FINAL | Denied | 1. BUILD TOP OF WALL TO ELEVATION 2618/FLUSH WITH CURB (SEE DETAIL 3 PAGE C2.1) 2. PROVIDE IMPERVIOUS SOIL CAP ON 6:1 LANDINGS (SEE DETAIL 3 PAGE C2.1) 3. PROVIDE CONCRETE COLLAR, CONTROL JOINTS AND CUT THE 24" PIPE FLUSH WITH THE WALL (SEE DETAIL 5 PAGE C2.1) 4. PROVIDE THE FIRST ANNUAL R/D BASIN CERTIFICATION LETTER FROM AZ REGISTERED P.E. PER NOTE ON PAGE C3.1 5. CORRECT PONDING WATER ON ASPHALT SURFACES (SEE FIELD PLAN). 6. PROVIDE CROSSWALK STRIPPING AT THE SOUTHEAST CORNER OF THE FELLOWSHIP HALL. 3. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 7. PROVIDE ROCK STABILIZATION: 2:1 SLOPES = ROCK RIP RAP ON FILTER FABRIC 1:1 SLOPES = GROUTED ROCK RIP RAP COMPLETE ALL SITE WORK AS SHOWN ON THE SITE AND GRADING PLANS. THE FINAL GRADING INSPECTION FOR PHASE 1 PERMIT# T04BU03031 WILL ALSO NEED TO BE COMPLETED AND APPROVED IN CONJUNCTION WITH THIS PERMITS FINAL GRADING INSPECTION. |
|
09/22/2005 | GRADING - FINAL | Denied | THE FOLLOWING ITEMS MUST ALSO BE COMPLETED FOR PHASE II/PERMIT # T04BU03031 1. PROVIDE 4:1 SLOPES ON R/D BASIN 2. BUILD TOP OF WALL TO ELEVATION 2618 (SEE DETAIL 3 PAGE C2.1) 3. PROVIDE IMPERVIOUS SOIL CAP ON 6:1 LANDINGS (SEE DETAIL 3 PAGE C2.1) 4. PROVIDE CONCRETE COLLAR, CONTROL JOINTS AND CUT THE 24" PIPE FLUSH WITH THE WALL (SEE DETAIL 5 PAGE C2.1) 5. PROVIDE THE FIRST ANNUAL R/D BASIN CERTIFICATION LETTER FROM AZ REGISTERED P.E. PER NOTE ON PAGE C3.1. |
|
02/01/2005 | GRADING - FINAL | Not ready for Inspection | I MET WITH DON, (SUPERINTENDENT/ TL ROOF ASSOCIATES), AND REQUESTED TO HAVE SOME CORRECTIONS TO THE STORM WATER CONRTOLS LOCATED AT THE W. PARIMETER. THE WORK FOR PHASE I OF THE GRADING PAVING PLAN HAS BEE COMPLETED, HOWEVER, WILL REMAIN OPEN UNTIL CONSTRUCTION FOR PHASE II HAS BEEN COMPLETED. A RE-INSPECTION HAS BEEN SCHEDULED FOR FRIDAY THE 4TH. |