GRADING:18661 CY CUT/7299 CY FILL
Contractors:
- RIO WEST DEVELOPMENT AND CONSTRU
Outstanding Activity Conditions
Permit Number - T04BU00386
Permit Status: Final
Permit Description: GRADING:18661 CY CUT/7299 CY FILL
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/19/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU00386
Permit Description: GRADING:18661 CY CUT/7299 CY FILL
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2006 | GRADING - INTERMEDIATE | JBRUCKME | Approved | CONCRETE CUT-OFF WALL AT DRAINAGE CHANNEL INLET HAS NOT BEEN CONSTRUCTED, BUT WILL BE CHECKED FOR COMPLETION IN (1) MONTH. |
| 12/04/2006 | STORMWATER FOLLOW-UP INSP | JBRUCKME | Approved | CONCRETE CUT-OFF WALL HAS NOT BEEN CONSTRUCTED, BUT WILL BE CHECKED FOR COMPLETION IN (1) MONTH. ALL OTHER ITEMS HAVE BEEN ADDRESSED. |
| 10/29/2008 | LANDSCAPE INSPECTION | ACONNOR | Approved | Verify that all Engineering comments and concerns are addressed |
| 10/29/2008 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | NO NPPO PRE PERMIT INSPECTION WAS PERFORMED PRIOR TO GRUBBING OR GRADING. |
| 11/21/2008 | GRADING - FINAL | JBRUCKME | Approved | FINAL GRADING INSPECTION RESULTS IMPORTED INTO PERMITS PLUS 1. CONSTRUCT (4) HANDICAP PARKING SPACES, ACCESS AISLES, RAMPS AND SIDEWALKS AT WEST SIDE OF PROJECT ADJACENT TO BLDG. #2. 2. REMOVE AND RECONSTRUCT (5) HANDICAP ACCESS RAMPS THAT EXCEED 12:1 MAXIMUM SLOPE (PER KEYNOTE 30). 3. PAINT PEDESTRIAN CROSSWALKS AND LOADING ZONE (BETWEEN BLDGS. 1 & 2) WITH 45 DEGREE DIAGONAL STRIPES A 3' O.C. (PER KEYNOTES 20 & 24). 4. PROVIDE (1) BLOCK OPENING FOR DRAINAGE AT SOUTHWEST CORNER OF BLDG. 1 (PER KEYNOTE 57). 5. PROVIDE BICYCLE PARKING SIGN AT NORTHWEST CORNER OF BLDG. 1 (PER KEYNOTE 66.) 6. CONSTRUCT PARKING IN FRONT OF BLDG. #1 AS SHOWN ON THE PLAN. CURBED MEDIAN ISLANDS ON EAST AND WEST SIDES HAVE BEEN MODIFIED CONSTRUCT PER PLAN OR REVISE DRAWINGS. 7. PROVIDE (3) CLASS I AND (2) CLASS II. BICYCLE PARKING SPACE AT BLDG. #1. 8. PROVIDE (6) CLASS I AND (2) CLASS II., BICYCLE PARKING SPACE AT BLDG. #3 9. THE ROCK RIP RAP LINED OUTLET CHANNEL IS NOT CONSTRUCTED TO THE DIMENSIONS SHOWN ON DETAIL 10/PAGE 6, OR DETAIL 5 PAGE 7. 10. THE DRAINAGE OUTLET IS NOT CONSTRUCTED TO THE APPROVED PLAN. THE PLAN SHOWS 56' OF CMP AT 10.89% SLOPE WITH PIPE MITERED ENDS TO MATCH SLOPE. (SEE DETAIL 4, PAGE 7) AS-BUILT CONSTRUCTION IS 40' OF CMP AT 3.5% SLOPE AND PIPE IS NOT MITERED TO MATCH SLOPE. CONSTRUCT TO PLAN OR REVISE DRAWINGS. 11. REPAIR BROKEN SIDEWALK AT MEDIAN SOUTH OF BLDG #5 12. PAAL WIDTH IS LESS THAT 24' IN FRONT OF BLDGS 3, 4 AND 5. 13. CONSTRUCT CONCRETE SLAB ADJACENT TO ELECTRIC PANEL NEXT TO BLDG #6. 14. PROVIDE A MAXIMUM OF 2% SLOPE IN ALL DIRECTIONS AT HANDICAP ACCESS AISLES AND PARKING SPACES IN FRONT OF BLDGS. 6 AND 8. 15. REVISE PLAN TO SHOW RAMP AND 9'8" SIDEWALK NEXT TO TRASH ENCLOSURE NEAR BLDG. #8. 16. REMOVE CONDUIT STUBS SOUTHWEST OF BLDG 8. AND NORTHWEST OF BLDG. #1. 17. PROVIDE MIDDLE POST AS TRAFFIC DETERRENT ON PEDESTRIAN PATH EAST OF PROJECT. (SEE DETAIL 3, PAGE 5 AND KEYNOTE 59) 18. CLEAN UP WASH OUT IN DRAINAGE EAST OF BLDG. 7 & 8, AND AT SOUTHWEST CORNER OF BLDG. #1. 19. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL, DEBRIS, AND STRAW WATTLE. 20. REMOVE TEMPORARY ELECTRIC PEDESTAL ON SOUTH PERIMETER. 21. PROVIDE A FINAL APPROVED GRADING PLAN THAT SHOWS ALL REVISIONS AND MODIFICATIONS. 22. PROVIDE A LETTER OF CERTIFICATION AND ALL REPORTS FROM THE ARIZONA REGISTED P.E. THAT CERTIFYS THAT THE PROJECT IS CONSTRUCTED TO THE FINAL APPROVED GRADING PLAN. (PER DEVELOPMENT STANDARD 11-01.16.0. |
| 06/03/2009 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
| 06/03/2009 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | |
| 07/05/2009 | ENGINEERING PRE-CONSTRUCTION | DROBERTS | Approved |