Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
06/03/2009 GRADING - INTERMEDIATE Approved
01/14/2009 GRADING - INTERMEDIATE Correction Required CHECKED H/C RAMP RECONSTRUCTION WITH JACK
ALSO SPOKE TO BOB TENOR REGARDING AS-BUILT
11/30/2007 GRADING - INTERMEDIATE Correction Required MEETING WITH JIM FEMLING AND BRAD HOGE TO DISCUSS BICYCLE PARKING AND C OF O APPROVAL CRITERIA.
09/13/2007 GRADING - INTERMEDIATE Correction Required 1. COMPLETE ALL SITE WORK, PAVING, SIDEWALKS AND STABILIZATION.
2. PROVIDE A RAINWATER OUTLET FOR DECK DRAINS UNDER SIDEWALK FOR BUILDING AT NE CORNER OF SITE.
3. PROVIDE REVISED GRADING PLAN FOR DRAINAGE OUTLETS TO WALNUT CREEK.
09/10/2007 GRADING - INTERMEDIATE Correction Required PROVIDE A RAINWATER OUTLET FOR DECK DRAINS UNDER SIDEWALK FOR BUILDING AT NE CORNER OF SITE.
08/17/2007 GRADING - INTERMEDIATE Cancelled CANCELED
07/11/2007 GRADING - INTERMEDIATE Correction Required 1. PROVIDE REVISED AND C.O.T. APPROVED GRADING AND DEVELOPMENT PLANS SHOWING AS-BUILT CONDITIONS.
2. CORRECT PONDING WATER IN PARKING LOT. PROVIDE THE REQUIRED % SLOPE AS SHOWN ON THE GRADING PLAN.
3. VERIFY DRANAGE AND GRADES WEST OF BLDG. 2-B.
4. PROVIDE SIDEWALK SCUPPERS ON WEST SIDE OF BLDG. 6-F.
06/11/2007 GRADING - INTERMEDIATE Correction Required COURTESY INSPECTION
1. SLOPES STEEPER THAN 2:1 REQUIRE GROUTED ROCK RIP RAP (i.e. SOUTHWEST CORNER OF PROJECT AT DRAINAGE SWALE).
2. PROVIDE BICYCLE PARKING.
3. PROVIDE TRUNCATED DOMES WHERE PEDESTRIAN WALKWAYS ENTER DRIVEWAYS OR PARKING AREAS.
4. PROVIDE RAINWATER SCUPPERS TO CONVEY WATER FOR 10 YEAR RAIN EVENT UNDER SIDEWALKS.
01/18/2007 GRADING - INTERMEDIATE Partial Approval CONCRETE CUT OFF WALL NEAR THE SW CORNER OF SITE AT THE OUTFALL WAS POURED YESTERDAY.
12/04/2006 GRADING - INTERMEDIATE Partial Approval CONCRETE CUT-OFF WALL AT DRAINAGE CHANNEL INLET HAS NOT BEEN CONSTRUCTED, BUT WILL BE CHECKED FOR COMPLETION IN (1) MONTH.
10/03/2006 GRADING - INTERMEDIATE Partial Approval SWPPP CONTROLS ON EAST PERIMETER ARE REMOVED AT THIS TIME FOR GRADING OF PEDESTRIAN WALKWAY.
10/02/2006 GRADING - INTERMEDIATE Partial Approval MEETING WITH STEVE GREGOR, LAITH ALSHAMI AND RIO WEST MIKE BAIRD AND PROJECT MANAGER REGARDING REVISIONS TO THE GRADING PLAN AND DRAINAGE REPORT FOR DISCHARGES TO WALNUT WASH AND SLOPE STABILIZATION ON EAST PERIMETER.

I TOLD THEM THAT FINAL GRADING INSPECTION WILL BE REQUIRED FOR THE EASTERN PORTION OF THE SITE BEFORE THE BUILDING AT THE SOUTHEAST CORNER OF THE SITE WOULD BE ISSUED A C OF O.