Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
06/03/2009 STORMWATER FOLLOW-UP INSP Approved
09/11/2007 STORMWATER FOLLOW-UP INSP Correction Required EAST PERIMETER - REMOVE WASHOUT FROM WASH AND STABILIZE DISTURBED SOIL ON WASH BANKS AND FLOWLINE.
08/17/2007 STORMWATER FOLLOW-UP INSP Cancelled
07/11/2007 STORMWATER FOLLOW-UP INSP Correction Required PROVIDE SWPPP CONTROLS AT STORM DRAIN EXCAVATION AND REMOVE SEDIMENT FROM WALNUT WASH EAST OF BLDG 6-F.

0.5 INCHES OF RAINFALL RECORDED AT THIS SITE OVERNIGHT.
06/11/2007 STORMWATER FOLLOW-UP INSP Correction Required 1. CLEAN-UP EAST PERIMETER AND MAINTAIN THE STRAW WATTLE TO PROVIDE STORMWATER CONTROL ON EAST PERIMETER.
2. REMOVE BROKEN LUMBER AND SWEEP STREET AT SOUTHEAST CORNER OF SITE.
01/18/2007 STORMWATER FOLLOW-UP INSP Partial Approval STORWATER CONTROLS ARE IN GOOD CONDITION.
1. STAKE STRAWBALES AND WATTLE NEAR THE SW CORNER OF THE SITE AT THE OUTFALL.
2. MAINTAIN THE CONCRETE WASHOUT AREA AND REMOVE EXCESS CONCRETE WASTE AS NEEDED.
12/04/2006 STORMWATER FOLLOW-UP INSP Partial Approval CONCRETE CUT-OFF WALL HAS NOT BEEN CONSTRUCTED, BUT WILL BE CHECKED FOR COMPLETION IN (1) MONTH.
ALL OTHER ITEMS HAVE BEEN ADDRESSED.
11/27/2006 STORMWATER FOLLOW-UP INSP Correction Required 13 DAYS SINCE LAST INSPECTION WHEN I REQUESTED THAT THE CONCRETE CUT-OFF WALL BE CONSTRCTED AT TH INLET TO THE DE-SILTING BASIN. STRAW BALES AT THIS LOCATION ARE IN POOR CONDITION AND HAVE NOT BEEN PROPERLY MAINTAINED,WHICH HAS ALLOWED SILT AND SEDIMENT TO BYPASS THE STRAWBALES.
1. COMPLETE THE DE-SILTING BASIN PER THE GRADING PLAN AS DESCRIBED BY KEYNOTE #4 OF THE SWPPP PLAN. CONSTRUCTION OF BASIN INCLUDES THE CONCRETE CUT-OFF WALL AT THE INLET.
2.PROVIDE A NEW CLEAN COPY OF THE EROSION AND SEDIMENT CONTROL PLAN, AND UPDATE THIS PLAN TO SHOW CURRENT CONDITIONS AND LOCATIONS OF SWPP CONTROLS, MATERIAL STORAGE AREAS, AQND THE CONCRETE WASHOUT AREA.
3. PROVIDE A CONCRETE WASHDOWN AREA THAT IS CONSISTENT WITH THEDESCRIPTION SHOWN ON PAGE 11 OF THE SWPPP. (15' X 30' WITH 6" OF 1" - 3" ROCK OVER FILTER FABRIC.
4.UPDATE THE SWPPP DOCUMENTS ANDE COMPLETEINSPECTION REPORTS EVERY 14 DAYS AND ALSO WHEN SITE RECEIVES 0.5" OF RAINFALL.
5.CLEAN UP MATERIAL STORAGE AQREAS OF STORMWATER POLLUTANTS. SEE PAGE 13 OF THE SWPPP.

FAILURE TO COMPLY WITH THIS CORRECTION NOTICE WITHIN (7) DAYS/(1) WEEK WILL RESULT IN A NOTICE OF VIOLATION AND CITATION.

A SPILL OF A CLEAR OIL TYPE PRODUCT WAS OBSERVED IN THE DIRT AREA NORTHEAST OF BUILDING #1. I BROUGHT IT TO THE ATTENTION OF MARK. I TOLD HIM THAT A SPILL REPORT AND CLEANUP WERE REQUIRED. THIS UN-KNOWN SUBSTANCE WAS A PUDDLE IN THE DIRT APPROXIMATELY 1-2 QUARTS COVERING 8-10 SQUARE INCHES AND 0.5" - 1"DEEP.
11/14/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. CONSTRUCT HEADWALL AT DRAINAGE CHANNEL INLET.
2. UPDATE SWPPP TO SHOW MATERIALS STORAGE AREAS.
3. REMOVE CUT BRUSH FROM WALNUT WASH.
4. CONTROL OIL LEAKAGE FROM FORKLIFT.
11/08/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. REMOVE SOIL AND ROCK THAT HAS BEEN PUSHED OVER THE STRAW WATTLE ON THE EAST PERIMETER.
2. CLEAN UP CONCRETE WASH OUT AND RE-ESTABLISH THE CONCRETE WASHOUT AREA BETWEEN BUILDINGS A AND B.
3. REMOVE THE SEDIMENT THAT HAS WASHED INTO THE ROCK RIPRAP AND MAINTAIN THE SEDIMENT AND EROSION CONTROLS NEAR THE NORTHWEST CORNER OF BUILDING A.
08/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval NO STORMWATER CONCERNS AT THIS TIME.
WASTE OIL WAS REMOVED BY DAALCO.
EAST PERIMETER AND RIP RAP TIE-IN AT NORTHEAST CORNER OF PROJECT MUST BE COMPLETED PRIOR TO ANOTHER C OF O APPROVAL.
08/14/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. COMPLETE SLOPE STABILIZATION ON EAST PERIMETER AND PROVIDE FILL AT SOUTHEAST CORNER OF LOT #7 WHERE STORMWATER CAUSED BREAKOUT.
2. PROVIDE DOCUMENTATION FOR DISPOSAL OF WASTE OIL.
3. PROVIDE DUST CONTROL/WATER WAGON ON SITE WHEN EARTH DISTURBING ACTIVITY IS OCCURRING.
4. PROVIDE BANK PROTECTTION KEY-IN AT NORTHEAST CORNER OF SOTE (SEE KEYNOTE #15, PAGE 4 OF THE GREADING PLAN).
5. SWEEP PARKING LOT AND DRIVEWAYS.
LOUIS-977-8339
08/07/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. COMPLETE SLOPE STABILIZATION ON EAST PERIMETER AND PROVIDE FILL AT SOUTHEAST CORNER OF LOT #7 WHERE STORMWATER CAUSED BREAKOUT.
2. REMOVE OPEN (5) GALLON BUCKET OF WASTE OIL NORTH OF BLDG. #3
07/21/2006 STORMWATER FOLLOW-UP INSP Partial Approval SITE IS IN GOOD CONDITION,
1. KEEP SWPPP UPDATED
2. CONTROL DUST AT ALL TIMES.
3. ADDRESS SLOPE STABILIZATION ON EAST PERIMETER.
07/19/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. ADDRESS SLOPE STABILIZATION ON EAST PERIMETER.
2. COVER CONCRETE PRODUCTS/CHEMICALS FOR RAIN PROTECTION, SEE NOTE 3 ON PREVIOUS INSPECTION.
07/10/2006 STORMWATER FOLLOW-UP INSP Correction Required CORRECTION NOTICE IS EXTENDED UNTIL FRIDAY 07-14-06 AT 12:00 NOON, BASED ON PARTIAL COMPLIANCE FOR ITEMS LISTED ON 6-30-06 INSPECTION.
1. CORRECT GAPS IN STORM WATER WATTLE, DAYLIGHT UNDER BOTTOM AND AT SPLICES. PROVIDE ENOUGH WEIGNT OR STAKES TO PREVENT STORMWATER BREAKOUT
2. IDENTIFY ALL MATERIAL STORAGE AREAS AND CONCRETE WASHOUT LOCATIONS ON THE SWPPP.
3. PROVIDE RAINWATER PROTECTION FOR MATERIALS IN THE STORAGE AREAS TO PREVENT CONTACT WITH FALLING RAIN AND STORMWATER RUN OFF.
4. PROVIDE ADDITIONAL SEDIMENT AND EROSION CONTROLS AT THE INLET TO THE R/D BASIN.
06/29/2006 STORMWATER FOLLOW-UP INSP Correction Required 7-DAY CORRECTION NOTICE ISSUED, NON COMPLIANCE WILL RESULT IN STOP WORK ORDER FOR SITE AND CITATION.
1. PROVIDE ADEQUATE SEDIMENT AND EROSION CONTROLS AT EAST PERIMETER.
2. CLEAN UP CONCRETE WASHOUT BETWEEN BLDG #1 AND 2, AND NORTH OF BLDG 3.
3. CLOSE GAPS IN STRAW WATTLES AT WEST PERIMETER...ETC
4. PROVIDE DUST CONTROL - WET TO PROVIDE CRUST.

NOTICE SIGNED BY DEAN SAXTON III.
06/12/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. REPLACE DAMAGED SILT FENCE ON THE EAST PERIMETER.
2. PROVIDE SEDIMENT AND EROSION CONTROL AROUND STOCKPILE AT NE PORTION OF SITE.
3. PROVIDE CRUST ON ALL LOOSE SOIL AT THIS SITE. SITE MUST BE WATERED TO CONTROL DUST.
05/16/2006 STORMWATER FOLLOW-UP INSP Correction Required 1. REMOVE AND REPLACE THE DAMAGED SECTIONS OF SILT FENCE.
2. PROVIDE A SIGN FOR THE CONCRETE WASHOUT AREA.
3. COMPLETE ALL UPDATES TO THE SWPPP TO SHOW CURRENT CONDITIONS AND SW CONTROLS.
4. REPAIR OR REPLACE ALL EROSION CONTROLS AT PERIMETER OF THE SITE.
5. RE-ESTABLISH CONCRETE WASH OUT AREA WITH STABILIZED ENTRANCE.
05/15/2006 STORMWATER FOLLOW-UP INSP Correction Required SUPERINTENDENT NOT ON SITE, I WILL FOLLOW-UP TOMORROW.
05/08/2006 STORMWATER FOLLOW-UP INSP Correction Required 7 DAY CORRECTION NOTICE/NON COMPLIANCE WILL RESULT IN A CITATION.
1. UPDATE THE SWPPP TO SHOW CURRENT CONDITIONS AND SW CONTROLS.
2. REPAIR OR REPLACE EROSION CONTROLS AT PERIMETER OF THE SITE.
3. SWEEP SEDIMENT FROM PARKING LOT AND PUBLIC ROADWAY.
4. PICK UP AND CONTAIN ALL SOLID WASTE MATERIALS ON SITE.
5. POST AZPDES AUTHORIZATION NUMBER ON JOB SHACK.
6. COMPLETE BI-WEEKLY INSPECTION REPORT.
7. RE-ESTABLISH CONCRETE WASH OUT AREA WITH STABILIZED ENTRANCE.
02/22/2006 STORMWATER FOLLOW-UP INSP Partial Approval 3 OF THE 7 BUILDINGS ARE ALMOST COMPLETE. 75% OF THE PAVING IS COMPLETE.
NO STORMWATER CONCERNS.
10/05/2005 STORMWATER FOLLOW-UP INSP Correction Required PROVIDE A WATER TRUCK ON SITE FOR DUST CONTROL.
09/29/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. SILT FENCE REPAIRS NEED TO BE KEYED INTO THE GROUND 6''- 8" DEEP.
2. CONTROL DUST AT ALL TIMES, PROVIDE CRUST ON ALL DISTURBED AREAS.
09/28/2005 STORMWATER FOLLOW-UP INSP Cancelled SITE LOCKED/ INSPECTION RE-SCHEDULED
09/21/2005 STORMWATER FOLLOW-UP INSP Correction Required PREVIOUS SILT FENCE REPAIRS HAVE BEEN COMPLETED, HOWEVER ADDITIONAL SILT FENCE REPAIRS ARE REQUIRED AT THE WEST PERIMETER.
08/22/2005 STORMWATER FOLLOW-UP INSP Correction Required REPAIR OR REPLACE SILT FENCE AT PERIMETER WHERE REQUIRED.
06/14/2005 STORMWATER FOLLOW-UP INSP Cancelled
05/23/2005 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS REQUIRED WITHIN 7 DAYS.
1. COMPLETE SILT FENCE REPAIRS, PROVIDE MINIMUN 6" OVERLAP AT SPLICES.
2. COMPLETE SEDIMENT BASIN AND INSTALL SWPPP CONTROL AT OUTLET.
3. PROVIDE SWPPP CONTOL AT SOUTHEAST CORNER OF SITE.
4. POST A READABLE SIGN WITH AZPDES AUTHORIZATION NUMBER AT THE ENTRANCE.
5. PROVIDE FILTER FABRIC AND ROCK PER SWPPP SPECIFICATIONS AT THE CONSTRUCTION ENTRANCE.
6. PREPARE BI-WEEKLY INSPECTION REPORTS.
05/10/2005 STORMWATER FOLLOW-UP INSP Correction Required CORRECTIONS REQUIRED WITHIN 7 DAYS.
1. REPAIR OF REPLACE SILT FENCE AT PERIMETER.
2. PROVIDE 30' X 50' X 6" GRAVEL AT ENTRANCES
3. INSTALL STRAW BALES AND DE-SILTING BASIN AT THE SOUTHWEST CORNER OF THE PROJECT.
4. PROVIDE COPIES OF THE BI-WEEKLY INSPECTION REPORTS AND THE UPDATED SWPPP.
03/04/2005 STORMWATER FOLLOW-UP INSP Correction Required 1. REMOVE DIRT RAMP AT THE CURB ON PARADISE FALLS.
2. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE.
3. PROVIDE AZPDES POSTING AT THE ENTRANCE.
4. REPAIR SPLICES AND BREECHES IN THE SILT FENCE AS NEEDED.
5. CALL FOR PRE-CONSTRUCTION STORMWATER INSPECTION.
RIO WEST - MARK -977-8332
02/24/2005 STORMWATER FOLLOW-UP INSP Cancelled
12/03/2004 STORMWATER FOLLOW-UP INSP Correction Required NO WORK HAS BEEN DONE ON THE SILT-FENCE SINCE MY INITIAL INVESTIGATION ON 11/29/04. ANOTHER CALL WILL BE MADE TO BRAD HOGE OF RIO-WEST TO ADDRESS THE REPAIRS ON THE SILT-FENCING. HIS NUMBER TO CONTACT HIM IS 318-4233.
11/29/2004 STORMWATER FOLLOW-UP INSP Correction Required REPAIR SILT-FENCING ALONG THE N. AND E. PARIMETERS. I SPOKE WITH THE SUPERINTENDENT FROM RIO WEST (318-4233) FOR THE PROJECT. HE INFORMED ME THAT HE WILL BEGIN REPARING THE SILT FENCE TODAY. RESHEDULED FOR 12/03/04