| 06/03/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 09/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | EAST PERIMETER - REMOVE WASHOUT FROM WASH AND STABILIZE DISTURBED SOIL ON WASH BANKS AND FLOWLINE. | |
| 08/17/2007 | STORMWATER FOLLOW-UP INSP | Cancelled | ||
| 07/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE SWPPP CONTROLS AT STORM DRAIN EXCAVATION AND REMOVE SEDIMENT FROM WALNUT WASH EAST OF BLDG 6-F. 0.5 INCHES OF RAINFALL RECORDED AT THIS SITE OVERNIGHT. |
|
| 06/11/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CLEAN-UP EAST PERIMETER AND MAINTAIN THE STRAW WATTLE TO PROVIDE STORMWATER CONTROL ON EAST PERIMETER. 2. REMOVE BROKEN LUMBER AND SWEEP STREET AT SOUTHEAST CORNER OF SITE. |
|
| 01/18/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | STORWATER CONTROLS ARE IN GOOD CONDITION. 1. STAKE STRAWBALES AND WATTLE NEAR THE SW CORNER OF THE SITE AT THE OUTFALL. 2. MAINTAIN THE CONCRETE WASHOUT AREA AND REMOVE EXCESS CONCRETE WASTE AS NEEDED. |
|
| 12/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | CONCRETE CUT-OFF WALL HAS NOT BEEN CONSTRUCTED, BUT WILL BE CHECKED FOR COMPLETION IN (1) MONTH. ALL OTHER ITEMS HAVE BEEN ADDRESSED. |
|
| 11/27/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 13 DAYS SINCE LAST INSPECTION WHEN I REQUESTED THAT THE CONCRETE CUT-OFF WALL BE CONSTRCTED AT TH INLET TO THE DE-SILTING BASIN. STRAW BALES AT THIS LOCATION ARE IN POOR CONDITION AND HAVE NOT BEEN PROPERLY MAINTAINED,WHICH HAS ALLOWED SILT AND SEDIMENT TO BYPASS THE STRAWBALES. 1. COMPLETE THE DE-SILTING BASIN PER THE GRADING PLAN AS DESCRIBED BY KEYNOTE #4 OF THE SWPPP PLAN. CONSTRUCTION OF BASIN INCLUDES THE CONCRETE CUT-OFF WALL AT THE INLET. 2.PROVIDE A NEW CLEAN COPY OF THE EROSION AND SEDIMENT CONTROL PLAN, AND UPDATE THIS PLAN TO SHOW CURRENT CONDITIONS AND LOCATIONS OF SWPP CONTROLS, MATERIAL STORAGE AREAS, AQND THE CONCRETE WASHOUT AREA. 3. PROVIDE A CONCRETE WASHDOWN AREA THAT IS CONSISTENT WITH THEDESCRIPTION SHOWN ON PAGE 11 OF THE SWPPP. (15' X 30' WITH 6" OF 1" - 3" ROCK OVER FILTER FABRIC. 4.UPDATE THE SWPPP DOCUMENTS ANDE COMPLETEINSPECTION REPORTS EVERY 14 DAYS AND ALSO WHEN SITE RECEIVES 0.5" OF RAINFALL. 5.CLEAN UP MATERIAL STORAGE AQREAS OF STORMWATER POLLUTANTS. SEE PAGE 13 OF THE SWPPP. FAILURE TO COMPLY WITH THIS CORRECTION NOTICE WITHIN (7) DAYS/(1) WEEK WILL RESULT IN A NOTICE OF VIOLATION AND CITATION. A SPILL OF A CLEAR OIL TYPE PRODUCT WAS OBSERVED IN THE DIRT AREA NORTHEAST OF BUILDING #1. I BROUGHT IT TO THE ATTENTION OF MARK. I TOLD HIM THAT A SPILL REPORT AND CLEANUP WERE REQUIRED. THIS UN-KNOWN SUBSTANCE WAS A PUDDLE IN THE DIRT APPROXIMATELY 1-2 QUARTS COVERING 8-10 SQUARE INCHES AND 0.5" - 1"DEEP. |
|
| 11/14/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. CONSTRUCT HEADWALL AT DRAINAGE CHANNEL INLET. 2. UPDATE SWPPP TO SHOW MATERIALS STORAGE AREAS. 3. REMOVE CUT BRUSH FROM WALNUT WASH. 4. CONTROL OIL LEAKAGE FROM FORKLIFT. |
|
| 11/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE SOIL AND ROCK THAT HAS BEEN PUSHED OVER THE STRAW WATTLE ON THE EAST PERIMETER. 2. CLEAN UP CONCRETE WASH OUT AND RE-ESTABLISH THE CONCRETE WASHOUT AREA BETWEEN BUILDINGS A AND B. 3. REMOVE THE SEDIMENT THAT HAS WASHED INTO THE ROCK RIPRAP AND MAINTAIN THE SEDIMENT AND EROSION CONTROLS NEAR THE NORTHWEST CORNER OF BUILDING A. |
|
| 08/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS AT THIS TIME. WASTE OIL WAS REMOVED BY DAALCO. EAST PERIMETER AND RIP RAP TIE-IN AT NORTHEAST CORNER OF PROJECT MUST BE COMPLETED PRIOR TO ANOTHER C OF O APPROVAL. |
|
| 08/14/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. COMPLETE SLOPE STABILIZATION ON EAST PERIMETER AND PROVIDE FILL AT SOUTHEAST CORNER OF LOT #7 WHERE STORMWATER CAUSED BREAKOUT. 2. PROVIDE DOCUMENTATION FOR DISPOSAL OF WASTE OIL. 3. PROVIDE DUST CONTROL/WATER WAGON ON SITE WHEN EARTH DISTURBING ACTIVITY IS OCCURRING. 4. PROVIDE BANK PROTECTTION KEY-IN AT NORTHEAST CORNER OF SOTE (SEE KEYNOTE #15, PAGE 4 OF THE GREADING PLAN). 5. SWEEP PARKING LOT AND DRIVEWAYS. LOUIS-977-8339 |
|
| 08/07/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. COMPLETE SLOPE STABILIZATION ON EAST PERIMETER AND PROVIDE FILL AT SOUTHEAST CORNER OF LOT #7 WHERE STORMWATER CAUSED BREAKOUT. 2. REMOVE OPEN (5) GALLON BUCKET OF WASTE OIL NORTH OF BLDG. #3 |
|
| 07/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE IS IN GOOD CONDITION, 1. KEEP SWPPP UPDATED 2. CONTROL DUST AT ALL TIMES. 3. ADDRESS SLOPE STABILIZATION ON EAST PERIMETER. |
|
| 07/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. ADDRESS SLOPE STABILIZATION ON EAST PERIMETER. 2. COVER CONCRETE PRODUCTS/CHEMICALS FOR RAIN PROTECTION, SEE NOTE 3 ON PREVIOUS INSPECTION. |
|
| 07/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE IS EXTENDED UNTIL FRIDAY 07-14-06 AT 12:00 NOON, BASED ON PARTIAL COMPLIANCE FOR ITEMS LISTED ON 6-30-06 INSPECTION. 1. CORRECT GAPS IN STORM WATER WATTLE, DAYLIGHT UNDER BOTTOM AND AT SPLICES. PROVIDE ENOUGH WEIGNT OR STAKES TO PREVENT STORMWATER BREAKOUT 2. IDENTIFY ALL MATERIAL STORAGE AREAS AND CONCRETE WASHOUT LOCATIONS ON THE SWPPP. 3. PROVIDE RAINWATER PROTECTION FOR MATERIALS IN THE STORAGE AREAS TO PREVENT CONTACT WITH FALLING RAIN AND STORMWATER RUN OFF. 4. PROVIDE ADDITIONAL SEDIMENT AND EROSION CONTROLS AT THE INLET TO THE R/D BASIN. |
|
| 06/29/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 7-DAY CORRECTION NOTICE ISSUED, NON COMPLIANCE WILL RESULT IN STOP WORK ORDER FOR SITE AND CITATION. 1. PROVIDE ADEQUATE SEDIMENT AND EROSION CONTROLS AT EAST PERIMETER. 2. CLEAN UP CONCRETE WASHOUT BETWEEN BLDG #1 AND 2, AND NORTH OF BLDG 3. 3. CLOSE GAPS IN STRAW WATTLES AT WEST PERIMETER...ETC 4. PROVIDE DUST CONTROL - WET TO PROVIDE CRUST. NOTICE SIGNED BY DEAN SAXTON III. |
|
| 06/12/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REPLACE DAMAGED SILT FENCE ON THE EAST PERIMETER. 2. PROVIDE SEDIMENT AND EROSION CONTROL AROUND STOCKPILE AT NE PORTION OF SITE. 3. PROVIDE CRUST ON ALL LOOSE SOIL AT THIS SITE. SITE MUST BE WATERED TO CONTROL DUST. |
|
| 05/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE AND REPLACE THE DAMAGED SECTIONS OF SILT FENCE. 2. PROVIDE A SIGN FOR THE CONCRETE WASHOUT AREA. 3. COMPLETE ALL UPDATES TO THE SWPPP TO SHOW CURRENT CONDITIONS AND SW CONTROLS. 4. REPAIR OR REPLACE ALL EROSION CONTROLS AT PERIMETER OF THE SITE. 5. RE-ESTABLISH CONCRETE WASH OUT AREA WITH STABILIZED ENTRANCE. |
|
| 05/15/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SUPERINTENDENT NOT ON SITE, I WILL FOLLOW-UP TOMORROW. | |
| 05/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 7 DAY CORRECTION NOTICE/NON COMPLIANCE WILL RESULT IN A CITATION. 1. UPDATE THE SWPPP TO SHOW CURRENT CONDITIONS AND SW CONTROLS. 2. REPAIR OR REPLACE EROSION CONTROLS AT PERIMETER OF THE SITE. 3. SWEEP SEDIMENT FROM PARKING LOT AND PUBLIC ROADWAY. 4. PICK UP AND CONTAIN ALL SOLID WASTE MATERIALS ON SITE. 5. POST AZPDES AUTHORIZATION NUMBER ON JOB SHACK. 6. COMPLETE BI-WEEKLY INSPECTION REPORT. 7. RE-ESTABLISH CONCRETE WASH OUT AREA WITH STABILIZED ENTRANCE. |
|
| 02/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 3 OF THE 7 BUILDINGS ARE ALMOST COMPLETE. 75% OF THE PAVING IS COMPLETE. NO STORMWATER CONCERNS. |
|
| 10/05/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE A WATER TRUCK ON SITE FOR DUST CONTROL. | |
| 09/29/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. SILT FENCE REPAIRS NEED TO BE KEYED INTO THE GROUND 6''- 8" DEEP. 2. CONTROL DUST AT ALL TIMES, PROVIDE CRUST ON ALL DISTURBED AREAS. |
|
| 09/28/2005 | STORMWATER FOLLOW-UP INSP | Cancelled | SITE LOCKED/ INSPECTION RE-SCHEDULED | |
| 09/21/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | PREVIOUS SILT FENCE REPAIRS HAVE BEEN COMPLETED, HOWEVER ADDITIONAL SILT FENCE REPAIRS ARE REQUIRED AT THE WEST PERIMETER. | |
| 08/22/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | REPAIR OR REPLACE SILT FENCE AT PERIMETER WHERE REQUIRED. | |
| 06/14/2005 | STORMWATER FOLLOW-UP INSP | Cancelled | ||
| 05/23/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTIONS REQUIRED WITHIN 7 DAYS. 1. COMPLETE SILT FENCE REPAIRS, PROVIDE MINIMUN 6" OVERLAP AT SPLICES. 2. COMPLETE SEDIMENT BASIN AND INSTALL SWPPP CONTROL AT OUTLET. 3. PROVIDE SWPPP CONTOL AT SOUTHEAST CORNER OF SITE. 4. POST A READABLE SIGN WITH AZPDES AUTHORIZATION NUMBER AT THE ENTRANCE. 5. PROVIDE FILTER FABRIC AND ROCK PER SWPPP SPECIFICATIONS AT THE CONSTRUCTION ENTRANCE. 6. PREPARE BI-WEEKLY INSPECTION REPORTS. |
|
| 05/10/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTIONS REQUIRED WITHIN 7 DAYS. 1. REPAIR OF REPLACE SILT FENCE AT PERIMETER. 2. PROVIDE 30' X 50' X 6" GRAVEL AT ENTRANCES 3. INSTALL STRAW BALES AND DE-SILTING BASIN AT THE SOUTHWEST CORNER OF THE PROJECT. 4. PROVIDE COPIES OF THE BI-WEEKLY INSPECTION REPORTS AND THE UPDATED SWPPP. |
|
| 03/04/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. REMOVE DIRT RAMP AT THE CURB ON PARADISE FALLS. 2. PROVIDE A STABILIZED CONSTRUCTION ENTRANCE. 3. PROVIDE AZPDES POSTING AT THE ENTRANCE. 4. REPAIR SPLICES AND BREECHES IN THE SILT FENCE AS NEEDED. 5. CALL FOR PRE-CONSTRUCTION STORMWATER INSPECTION. RIO WEST - MARK -977-8332 |
|
| 02/24/2005 | STORMWATER FOLLOW-UP INSP | Cancelled | ||
| 12/03/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | NO WORK HAS BEEN DONE ON THE SILT-FENCE SINCE MY INITIAL INVESTIGATION ON 11/29/04. ANOTHER CALL WILL BE MADE TO BRAD HOGE OF RIO-WEST TO ADDRESS THE REPAIRS ON THE SILT-FENCING. HIS NUMBER TO CONTACT HIM IS 318-4233. | |
| 11/29/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | REPAIR SILT-FENCING ALONG THE N. AND E. PARIMETERS. I SPOKE WITH THE SUPERINTENDENT FROM RIO WEST (318-4233) FOR THE PROJECT. HE INFORMED ME THAT HE WILL BEGIN REPARING THE SILT FENCE TODAY. RESHEDULED FOR 12/03/04 |