Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Apply Date:
01/09/2004
Applicant:
N/A
Description:
GRADING:CUT 3760 FILL 265
Contractors:
  • SUNDANCE DESIGN AND CONSTRUCTION

Permit Reviews

Permit Number - T04BU00052
Permit Status: Final
Permit Description: GRADING:CUT 3760 FILL 265
Start Date Submittal Complete Date Status  
01/09/2004 PLANS OK TO SUBMIT - GRADING 01/09/2004 COMPLETED Review Details
01/12/2004 GRADING 02/18/2004 COMPLETED Review Details
03/15/2004 GRADING 04/12/2004 COMPLETED Review Details
05/04/2004 RESUBMITTAL - GRADING 06/17/2004 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T04BU00052
Permit Status: Final
Permit Description: GRADING:CUT 3760 FILL 265
Total Outstanding Activity Conditions - 1
Date Name
01/09/2004 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T04BU00052
Permit Description: GRADING:CUT 3760 FILL 265
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/08/2004 ENGINEERING PRE-CONSTRUCTION JSALINE Approved TEMPORARY APPROVAL.
1. PRECONSTRUCTION MEETING WITH DAVE MATHIS, DISSCUSSING SWPPP CONTROL INSTALLATION, (SILT FENCING,STABILIZED CONSTRUCTION ENTRANCE AND CONCRETE WASH OUT). ADVISED DAVE OF THE STANDARDS INVOLVED FOR REGULAR INSPECTIONS AFTER HEAVLY RAIN FALL.
2. REQUESTED RE-INSPECTION (#9152) AFTER SWPPP CONTROLS HAVE BEEN INSTALLED.
07/08/2004 NPPO PRE PERMIT INSPECTION ACONNOR Approved
07/15/2004 STORMWATER INSTALL OF CONTROLS JSALINE Approved 1. SILT FENCING HAS PROPERLY BEEN INSTALLED.

2. STABILIZED CONSTRUCTION ENTRANCE W/ 1-3" GRAVEL.

3. NO TRACKING OFF SITE AND NO OTHER STORM CONCERNS AT THIS TIME.
10/01/2004 STORMWATER FOLLOW-UP INSP JSALINE Approved SITE IS IN GOOD CONDITION, NO STORM WATER CONCERNS AT THIS TIME. WILL RE-INSPECT ON TUESDAY THE 5TH.
10/01/2004 STORMWATER FOLLOW-UP INSP JSALINE Approved SITE IS IN GOOD CONDITION WITH NO STORM WATER CONCERNS AT THIS TIME.
11/23/2004 GRADING - FINAL JSALINE Approved C OF O IS APPROVED FOR THIS PROJECT.
11/24/2004 LANDSCAPE INSPECTION ACONNOR Approved Hydroseeding established for approval.
11/24/2004 LANDSCAPE - FINAL ACONNOR Approved For approval hydroseed areas indicated on plan
01/20/2005 STORMWATER FINAL INSPECTION JSALINE Approved
01/24/2005 PERMIT FINALED LJACKSON Approved

Documents

File Name Document Type  
None DOCUMENTS VIEW