Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T04BU00052
Permit Details
Apply Date:
01/09/2004
Applicant:
N/A
Description:
GRADING:CUT 3760 FILL 265
Contractors:
- SUNDANCE DESIGN AND CONSTRUCTION
Permit Reviews
Permit Number - T04BU00052
Permit Status: Final
Permit Description: GRADING:CUT 3760 FILL 265
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/09/2004 | PLANS OK TO SUBMIT - GRADING | 01/09/2004 | COMPLETED |
01/12/2004 | GRADING | 02/18/2004 | COMPLETED |
03/15/2004 | GRADING | 04/12/2004 | COMPLETED |
05/04/2004 | RESUBMITTAL - GRADING | 06/17/2004 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T04BU00052
Permit Status: Final
Permit Description: GRADING:CUT 3760 FILL 265
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/09/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T04BU00052
Permit Description: GRADING:CUT 3760 FILL 265
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/08/2004 | ENGINEERING PRE-CONSTRUCTION | JSALINE | Approved | TEMPORARY APPROVAL. 1. PRECONSTRUCTION MEETING WITH DAVE MATHIS, DISSCUSSING SWPPP CONTROL INSTALLATION, (SILT FENCING,STABILIZED CONSTRUCTION ENTRANCE AND CONCRETE WASH OUT). ADVISED DAVE OF THE STANDARDS INVOLVED FOR REGULAR INSPECTIONS AFTER HEAVLY RAIN FALL. 2. REQUESTED RE-INSPECTION (#9152) AFTER SWPPP CONTROLS HAVE BEEN INSTALLED. |
07/08/2004 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
07/15/2004 | STORMWATER INSTALL OF CONTROLS | JSALINE | Approved | 1. SILT FENCING HAS PROPERLY BEEN INSTALLED. 2. STABILIZED CONSTRUCTION ENTRANCE W/ 1-3" GRAVEL. 3. NO TRACKING OFF SITE AND NO OTHER STORM CONCERNS AT THIS TIME. |
10/01/2004 | STORMWATER FOLLOW-UP INSP | JSALINE | Approved | SITE IS IN GOOD CONDITION, NO STORM WATER CONCERNS AT THIS TIME. WILL RE-INSPECT ON TUESDAY THE 5TH. |
10/01/2004 | STORMWATER FOLLOW-UP INSP | JSALINE | Approved | SITE IS IN GOOD CONDITION WITH NO STORM WATER CONCERNS AT THIS TIME. |
11/23/2004 | GRADING - FINAL | JSALINE | Approved | C OF O IS APPROVED FOR THIS PROJECT. |
11/24/2004 | LANDSCAPE INSPECTION | ACONNOR | Approved | Hydroseeding established for approval. |
11/24/2004 | LANDSCAPE - FINAL | ACONNOR | Approved | For approval hydroseed areas indicated on plan |
01/20/2005 | STORMWATER FINAL INSPECTION | JSALINE | Approved | |
01/24/2005 | PERMIT FINALED | LJACKSON | Approved |