Permit: T03CM04797
Permit Details
Apply Date:
10/06/2003
Applicant:
INTERTECH
Description:
TI:AUTOGLASS STORE
Architects:
- SWAN WAYNE E
Contractors:
- PROGRESSIVE STRUCTURES
Permit Reviews
Permit Number - T03CM04797
Permit Status: C of o
Permit Description: TI:AUTOGLASS STORE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/06/2003 | COMMERCIAL TI | 10/08/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM04797
Permit Status: C of o
Permit Description: TI:AUTOGLASS STORE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/06/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T03CM04797
Permit Description: TI:AUTOGLASS STORE
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/30/2003 | MECHANICAL - PROGRESS | JMILITEL | Approved | IVRS - Inspection 0000* |
10/30/2003 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection 0000* |
10/30/2003 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection 0000* |
10/30/2003 | ELECTRIC - FINAL | JORTA | Approved | IVRS - Inspection 0000*/ OPEN WALLS WHERE INDICATED ON PLAN. 12" EACH WAY FROM CONDUIT. TOTAL 24" WIDE - 3 AREAS - SEE PLAN. OPEN ALL BOXES FOR INSPECTION OF MAKE UP. PLEASE RECALL INTERMEDIATE. BOX THAT IS NOW EXPOSED AT REAR IS OVERFILLED WITH CONDUCTORS. |
10/30/2003 | ELECTRIC - INTERMEDIATE | JORTA | Approved | IVRS - Inspection 0000* |
10/30/2003 | BUILDING ABOVE CEILING | AMATHIES | Approved | IVRS - Inspection 0000* |
10/30/2003 | FRAMING | AMATHIES | Approved | IVRS - Inspection 0000* |
10/31/2003 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection 0999*/ 1) A/C UNIT OVERFUSED 25 AMP IS MAX FUSE SIZE 2) MARK DATA PLATE WITH PROPER HEAT STRIP INSTALLED AND FUSE ACCORDINGLY. IDENTIFY FUSE BANKS IN DISCONNECTS. 3) PROVIDE A FRESH AIR INTAKE AS PER PLANS 4) CONDENSATE CANNOT TERMINATE INTO A HOLE DRILLED INTO THE SIE OF A SEWER VENT. TERMINATE TO LAV TAIL PIECE AS PER PLANS. ALSO CONENCT EXISTING UNIT TO SAME DRAIN LINE 5) PERMANENTLY LABEL A/C UNIT WITH SUITE NUMBER. RECALL FOR INSPECTION |
11/07/2003 | SHEET ROCK NAILING | LHANLY | Approved | IVRS - Inspection 0000*/ CANCELLED BY CONTRACTOR. |
12/02/2003 | ELECTRIC - ABOVE CEILING | JORTA | Approved | IVRS - Inspection 0000*/ PLEASE COMPLY WITH LAST INSP. - NEED L11 NAME, GEN. CONTRACTOR NAME AND TELE. NUMBER. RECALL AND LEAVE NAME AND #. |
03/04/2004 | PERMIT FINALED | DLEE | Approved | |
03/04/2004 | RIGHT OF WAY - FINAL | DLEE | Approved | |
03/04/2004 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection 0000* |
03/04/2004 | ENGINEERING - FINAL | JSALINE | Approved | C OF O APPROVED. |
03/04/2004 | FIRE - FINAL | LTHOMAS | Approved | 1) OK C OF O |
03/10/2004 | BUILDING - FINAL | LHANLY | Approved | IVRS - Inspection 0000* |