Permit Details

Status:
Final
Type:
COMMERCIAL ALTERATION
Apply Date:
09/12/2003
Applicant:
METRO PERMIT EXPRESS, INC
Description:
TI:DAY SPA
Architects:
  • COHEN, JACK A
Contractors:
  • PERKINS CARPENTRY AND REMODELING L L C

Permit Reviews

Permit Number - T03CM04453
Permit Status: Final
Permit Description: TI:DAY SPA
Start Date Submittal Complete Date Status  
09/12/2003 COMMERCIAL TI 09/22/2003 COMPLETED Review Details
09/22/2003 RESUBMITTAL 10/08/2003 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T03CM04453
Permit Status: Final
Permit Description: TI:DAY SPA
Total Outstanding Activity Conditions - 1
Date Name
09/12/2003 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T03CM04453
Permit Description: TI:DAY SPA
Total Completed Inspections - 20
Date Description Inspector Results Comments
10/17/2003 PLUMBING - ROUGH, SOIL JSTANLEY Approved OK TO BACKFILL.
10/24/2003 FRAMING LHANLY Approved IVRS - Inspection 0000* OK TO COVER ALL PARTITIONS WHEN ELEC & PLBG INTERMEDIATES APPROVED.
WARNING: ADAAG REQUIRES CENTER OF WATER CLOSET TO BE 18" FROM FINISHED WALL- NO MORE - NO LESS
11/06/2003 MECHANICAL - INTERMEDIATE JMILITEL Approved IVRS - Inspection 0000*/ 1) INSPECTED CONDENSATE DRAIN LINES. RELOCATE TO TERMINATE INTO A LAV AS PER PLANS. RECALL TO TERMINATE PIPE IN WALL 2) PROVIDE DUCT SMOKE DTECTORS AS PER PLAN OR PROVIDE A LETTTER FROM ENGINEER IF DELETING. 3) COMPLETE INSTALLATION OF EXHAUST AND SUPPLY IN RESTROOMS. RECALL FOR INSPECTION WHEN READY. OK FOR SHEET ROCK ALL OTHER AREAS
11/07/2003 PLUMBING - INTERMEDIATE JSTANLEY Approved IVRS - Inspection 0000*
11/20/2003 MECHANICAL - ABOVE CEILING JMILITEL Approved INSPECTED DRYER VENT, CONDENSATE DRAIN LINE RELOCATION, SUPPLY AND EXHAUST IN RESTROOMS. OK TO SHEET ROCK HARD LIDS.
11/20/2003 PLUMBING - ABOVE CEILING JSTANLEY Approved IVRS - Inspection 0000*
11/20/2003 ELECTRIC - INTERMEDIATE RHOLLAND Approved IVRS - Inspection 0000*/ 1) REDUCING BUSHINGS NEEDED AT PANEL CONNECTORS 2) SUPPORT NM CABLE WITHIN 12" OF CALC'S 3) OK PANEL WALL AND HARD CEILINGS
11/20/2003 SHEET ROCK NAILING RSUBA Approved IVRS - Inspection 0000*
12/18/2003 MECHANICAL - FINAL JMILITEL Approved IVRS - Inspection 0000*/ INSPECTED ALL FLEX DUCT AND DIFFUSERS ABOVE CEILING. OK FOR CEILING TILES.
12/19/2003 ELECTRIC - FINAL RHOLLAND Approved IVRS - Inspection 0000*/ 1) OK TO TILE 2) BONDING JUMPERS TO BE SIZED PER 250.102 AND 250.66 2) FINISH SIGN AND A/C'S AND WATER HEATER
12/19/2003 ELECTRIC - ABOVE CEILING RHOLLAND Approved IVRS - Inspection 0000*
01/21/2004 MECHANICAL - PROGRESS CWILLIAM Approved
01/21/2004 PLUMBING - FINAL JSTANLEY Approved IVRS - Inspection 0000*
01/26/2004 BUILDING - FINAL RSUBA Approved IVRS - Inspection 0000*
01/26/2004 BUILDING ABOVE CEILING RSUBA Approved IVRS - Inspection 0000*
03/02/2004 RIGHT OF WAY - FINAL PWHIDDON Approved
03/02/2004 ENGINEERING - FINAL JBRUCKME Approved
03/02/2004 FIRE - FINAL LTHOMAS Approved 1) OK C OF O
04/05/2004 SIGN - FINAL JSONKIN Approved IVRS - Inspection 0000*
10/18/2004 PERMIT FINALED LJACKSON Approved