Permit: T03CM04453
Permit Details
Status:
Final
Type:
COMMERCIAL ALTERATION
Address:
7858 E WRIGHTSTOWN RD #104
Address NEW:
7858 E WRIGHTSTOWN RD #104
Apply Date:
09/12/2003
Applicant:
METRO PERMIT EXPRESS, INC
Description:
TI:DAY SPA
Architects:
- COHEN, JACK A
Contractors:
- PERKINS CARPENTRY AND REMODELING L L C
Permit Reviews
Permit Number - T03CM04453
Permit Status: Final
Permit Description: TI:DAY SPA
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2003 | COMMERCIAL TI | 09/22/2003 | COMPLETED |
| 09/22/2003 | RESUBMITTAL | 10/08/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T03CM04453
Permit Status: Final
Permit Description: TI:DAY SPA
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/12/2003 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T03CM04453
Permit Description: TI:DAY SPA
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2003 | PLUMBING - ROUGH, SOIL | JSTANLEY | Approved | OK TO BACKFILL. |
| 10/24/2003 | FRAMING | LHANLY | Approved | IVRS - Inspection 0000* OK TO COVER ALL PARTITIONS WHEN ELEC & PLBG INTERMEDIATES APPROVED. WARNING: ADAAG REQUIRES CENTER OF WATER CLOSET TO BE 18" FROM FINISHED WALL- NO MORE - NO LESS |
| 11/06/2003 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection 0000*/ 1) INSPECTED CONDENSATE DRAIN LINES. RELOCATE TO TERMINATE INTO A LAV AS PER PLANS. RECALL TO TERMINATE PIPE IN WALL 2) PROVIDE DUCT SMOKE DTECTORS AS PER PLAN OR PROVIDE A LETTTER FROM ENGINEER IF DELETING. 3) COMPLETE INSTALLATION OF EXHAUST AND SUPPLY IN RESTROOMS. RECALL FOR INSPECTION WHEN READY. OK FOR SHEET ROCK ALL OTHER AREAS |
| 11/07/2003 | PLUMBING - INTERMEDIATE | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 11/20/2003 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | INSPECTED DRYER VENT, CONDENSATE DRAIN LINE RELOCATION, SUPPLY AND EXHAUST IN RESTROOMS. OK TO SHEET ROCK HARD LIDS. |
| 11/20/2003 | PLUMBING - ABOVE CEILING | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 11/20/2003 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection 0000*/ 1) REDUCING BUSHINGS NEEDED AT PANEL CONNECTORS 2) SUPPORT NM CABLE WITHIN 12" OF CALC'S 3) OK PANEL WALL AND HARD CEILINGS |
| 11/20/2003 | SHEET ROCK NAILING | RSUBA | Approved | IVRS - Inspection 0000* |
| 12/18/2003 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection 0000*/ INSPECTED ALL FLEX DUCT AND DIFFUSERS ABOVE CEILING. OK FOR CEILING TILES. |
| 12/19/2003 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection 0000*/ 1) OK TO TILE 2) BONDING JUMPERS TO BE SIZED PER 250.102 AND 250.66 2) FINISH SIGN AND A/C'S AND WATER HEATER |
| 12/19/2003 | ELECTRIC - ABOVE CEILING | RHOLLAND | Approved | IVRS - Inspection 0000* |
| 01/21/2004 | MECHANICAL - PROGRESS | CWILLIAM | Approved | |
| 01/21/2004 | PLUMBING - FINAL | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 01/26/2004 | BUILDING - FINAL | RSUBA | Approved | IVRS - Inspection 0000* |
| 01/26/2004 | BUILDING ABOVE CEILING | RSUBA | Approved | IVRS - Inspection 0000* |
| 03/02/2004 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | |
| 03/02/2004 | ENGINEERING - FINAL | JBRUCKME | Approved | |
| 03/02/2004 | FIRE - FINAL | LTHOMAS | Approved | 1) OK C OF O |
| 04/05/2004 | SIGN - FINAL | JSONKIN | Approved | IVRS - Inspection 0000* |
| 10/18/2004 | PERMIT FINALED | LJACKSON | Approved |